Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | Kansas City (675 Journeyman Plumber with Gas). This one uses the UPC, not the IPC |
| Exam | 675: 70 questions, 3 hours |
| Books allowed | 2018 Uniform Plumbing Code and 2018 International Fuel Gas Code |
| Fees | $115 per ICC exam through Pearson VUE, plus your city's license fees |
Plumbers applying for a journeyman plumber certificate in Kansas City, which tests on the Uniform Plumbing Code rather than the IPC.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the journeyman plumber with gas exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Gas piping (about 29%) is the biggest block: IFGC Chapter 4 sizing tables, Chapter 6 pressure testing, and the UPC gas chapter.
- Do not mix up the codes: this exam is UPC plumbing, while Springfield's journeyman plumber exam is IPC.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 Uniform Plumbing Code (UPC)Essential
Allowed in the exam room. The plumbing code behind Kansas City's journeyman plumber exam (675).
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.
Official reference list (as published by the testing agency)
- 2018 Uniform Plumbing Code (UPC) (allowed in the exam room)
- 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 14 | |
| Plumbing Fixtures | 11 | |
| Water Supply and Distribution | 11 | |
| Sanitary Drainage | 13 | |
| Plumbing Vent Requirements | 13 | |
| Traps, Interceptors, and Separators | 8 | |
| Storm Drainage | 1 | |
| Gas Piping | 29 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
- 70 multiple-choice questions in 3 hours; passing score not published (75% used as practice target).
- Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
- Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
- If you fail, wait 10 days to retake (ICC bulletin).
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the Kansas City journeyman plumber exam?
70 questions: gas piping about 29%, administration and general regulations 14%, sanitary drainage and vents about 13% each, fixtures and water supply 11% each, traps 8% and storm drainage 1%. The ICC text lays out its percentages so that we could only match them to topics by order, so treat these weights as approximate.
Which code books does it use?
The 2018 Uniform Plumbing Code and the 2018 International Fuel Gas Code, not the IPC.
How is it different from the Springfield journeyman exam?
Springfield's journeyman plumber exam uses the IPC and has no gas section; Kansas City's 675 uses the UPC plus the IFGC.
Free questions with answers
Show all 10 free questions and answers
A plumbing permit was issued for a remodel, but the crew never started work. Under the 2018 UPC, after how many days does the permit expire by limitation?
Answer: 180 days from the date of the permit
Section 104.4.3 makes a permit null and void when the authorized work is not commenced within 180 days of issuance, or when work is suspended or abandoned for 180 days after it begins. Ninety days and one year do not appear in that section.
Reference: 2018 Uniform Plumbing Code, 104.4.3
A plumbing permit expired because work stopped for 200 days. No changes will be made to the original construction documents, and the suspension has not lasted a full year. Under UPC 104.4.3, what must the permittee do before restarting?
Answer: Obtain a new permit, for which the fee is one-half of the fee for a new permit
UPC 104.4.3 requires a new permit before work recommences. If no changes are made to the original documents and the suspension has not exceeded 1 year, the fee is one-half of the fee for a new permit. The full fee applies only after the one-year limit or where plans change.
Reference: 2018 Uniform Plumbing Code, 104.4.3
A restaurant restroom will have two urinals side by side and one water closet. Under UPC 402.5, what is the minimum center-to-center spacing between the two urinals, and the minimum clear space in front of the water closet?
Answer: 24 inches between urinals; 24 inches clear in front of the water closet
Section 402.5 sets urinals no closer than 24 inches center to center (12 inches from center to a side wall) and requires at least 24 inches of clear space in front of a water closet, lavatory or bidet. The 30-inch figure applies to center-to-center spacing of water closets.
Reference: 2018 Uniform Plumbing Code, 402.5
A building with a 1-inch water service measures 95 psi static water pressure at the service entrance. Under UPC 608.2, what must be installed?
Answer: A pressure regulator, preceded by a strainer, set to 80 psi or less
UPC 608.2 requires an approved pressure regulator preceded by an adequate strainer where static pressure exceeds 80 psi, reducing it to 80 psi or less. Regulators of 1-1/2 inches or larger do not need the strainer. A regulator also creates a closed system, so an expansion tank is needed under 608.3.
Reference: 2018 Uniform Plumbing Code, 608.2
A horizontal building drain run has 230 feet of developed length with no changes of direction. Which statement reflects the cleanout requirements of UPC 707.4 for this run?
Answer: A cleanout at its upper terminal, plus cleanouts for each 100 feet, or fraction thereof, of the run's length
Section 707.4 requires a cleanout at the upper terminal of each horizontal drainage pipe, and a run exceeding 100 feet of developed length must have a cleanout for each 100 feet, or fraction thereof, of its length. Ends-only, midpoint-only and 50-foot spacing are not in the section. An additional cleanout is also required for each aggregate horizontal change of direction exceeding 135 degrees.
Reference: 2018 Uniform Plumbing Code, 707.4
What clear working space must be provided in front of a cleanout on 3-inch drainage piping under UPC 707.9?
Answer: 24 inches by 24 inches
Section 707.9 requires 18 by 18 inches clear in front of cleanouts in piping of 2 inches or less, and 24 by 24 inches in front of cleanouts in piping larger than 2 inches. A 3-inch line therefore needs 24 by 24 inches.
Reference: 2018 Uniform Plumbing Code, 707.9
A minimum-sized vent has a total permitted length of 90 feet from Table 703.2. Under UPC 904.2, how much of that length may be installed horizontally?
Answer: 30 feet
Section 904.2 says not more than one-third of the total permitted length of a minimum-sized vent may be horizontal. One-third of 90 feet is 30 feet.
Reference: 2018 Uniform Plumbing Code, 904.2
A 2-inch trap arm serves a floor sink (not a water closet or similar fixture). Under UPC Table 1002.2, what is the maximum developed horizontal length from the trap weir to the inner edge of its vent?
Answer: 60 inches (5 feet)
Table 1002.2 lists maximum trap arm lengths of 30 inches for 1-1/4 inch, 42 inches for 1-1/2 inch, 60 inches for 2 inch, 72 inches for 3 inch and 120 inches for 4 inch and larger, maintained at 1/4 inch per foot slope. The minimum distance trap to vent is two times the trap arm diameter (1002.2).
Reference: 2018 Uniform Plumbing Code, Table 1002.2, 1002.2
For a natural gas system with a service meter, where does the piping system coverage of UPC 1202.1 begin?
Answer: At the outlet of the service meter assembly
Section 1202.1 extends coverage from the point of delivery to the appliance connections. For other than undiluted LP-gas, the point of delivery is the outlet of the service meter assembly, or the outlet of the service regulator or service shutoff valve where no meter is provided.
Reference: 2018 Uniform Plumbing Code, 1202.1
Under UPC 1101.3, what is the rule on connecting storm water to the sanitary sewer?
Answer: Storm water shall not be drained into sewers intended for sanitary drainage
Section 1101.3 prohibits draining storm water into sewers intended for sanitary drainage. Section 1101.2 directs rainwater from roofs and paved areas to a separate storm sewer, or to a combined sewer only where no separate storm sewer is available.
Reference: 2018 Uniform Plumbing Code, 1101.3, 1101.2
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.