Missouri licensing exam

Missouri Springfield Journeyman Plumber Exam (ICC W25): Practice Test & Licensing Guide

The ICC Springfield Journeyman Plumber exam (W25): 70 open-book questions on the 2018 International Plumbing Code. Passing score not printed in the bulletin.

Questions
70
Time limit
3 hours
Passing score
Not published by Missouri

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Administration General Regulations

A building is moved onto a new lot inside the jurisdiction. Under the IPC, what governs the plumbing in the moved building?

Requirements at a glance

AgencyYour Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license
Where it is usedSpringfield (W25 Journeyman Plumber)
ExamW25: 70 questions, 3 hours
Books allowed2018 International Plumbing Code
Fees$115 per ICC exam through Pearson VUE, plus your city's license fees

Plumbers applying for a journeyman plumber license from Springfield Building Development Services.

How to get licensed, step by step

  1. Ask your city or county which exam it accepts

    Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

  2. Apply to the city first

    Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

  3. Register for the Springfield journeyman plumber exam with ICC and Pearson VUE

    Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.

    Schedule with Pearson VUE (ICC exams) (opens in a new tab)

  4. Pass with your books

    The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

How to prepare

  • Study the edition the exam is built on (listed above), not the newer code your city may enforce.
  • The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
  • Administration and general regulations (about 40%) and fixtures (about 17%) lead: IPC Chapter 1, Chapter 4 fixture requirements and Chapter 5 water heaters.
  • Water supply (about 14%) and sanitary drainage (about 13%) use the Chapter 6 and 7 tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2018 International Plumbing Code (IPC)Essential

    Allowed in the exam room. Most of the Springfield and Kansas City (G27) plumbing exams.

    ICC store (opens in a new tab)

Official reference list (as published by the testing agency)
  • 2018 International Plumbing Code (IPC) (allowed in the exam room)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Administration General Regulations40
Plumbing Fixtures17
Water Supply and Distribution14
Sanitary Drainage13
Plumbing Vent Requirements7
Traps, Interceptors, and Separators7
Storm Drainage2

Exam day details

  • Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
  • Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
  • 70 multiple-choice questions in 3 hours; passing score not published (75% used as practice target).
  • Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
  • Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
  • If you fail, wait 10 days to retake (ICC bulletin).

Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.

Frequently asked questions

What's on the Springfield journeyman plumber exam?

70 questions on the 2018 IPC: administration and general regulations about 40%, fixtures 17%, water supply 14%, sanitary drainage 13%, vents and traps 7% each and storm drainage 2%. The weights are matched to topics by order in the ICC text, so treat them as approximate.

Which code book does it use?

The 2018 International Plumbing Code only.

Is there a state plumbing license?

No. Springfield licenses plumbers locally and uses ICC exams through Pearson VUE.

Free questions with answers

Show all 10 free questions and answers
  1. A building is moved onto a new lot inside the jurisdiction. Under the IPC, what governs the plumbing in the moved building?

    Answer: It must comply with the code for new installations, except as allowed for existing installations in Section 102.2

    Section 102.7 says plumbing systems that are part of buildings moved into or within the jurisdiction must comply with the code for new installations, except as determined by Section 102.2 (existing installations). A move is not treated as a continuation of the original lawful use.

    Reference: 2018 International Plumbing Code, 102.7

  2. Soft materials of poor load-bearing quality are found at the bottom of a pipe trench. What does Section 306.2.3 require?

    Answer: Overexcavation of at least two pipe diameters, then backfill to the pipe bottom with fine gravel, crushed stone or a concrete foundation

    Section 306.2.3 handles soft load-bearing materials by overexcavating not less than two pipe diameters and backfilling to the pipe bottom with fine gravel, crushed stone or a concrete foundation. The 3-inch overexcavation is the rock-removal rule in Section 306.2.2.

    Reference: 2018 International Plumbing Code, 306.2.3

  3. Under Section 405.3.1, what is the minimum center-to-center spacing between adjacent fixtures (such as two urinals) not separated by a partition, and the minimum distance from a water closet's center to a side wall?

    Answer: 30 inches center to center; 15 inches center to side wall

    Section 405.3.1 says a water closet, urinal, lavatory or bidet may not be set closer than 15 inches from its center to any side wall, partition, vanity or other obstruction, and where nothing separates adjacent fixtures they may not be closer than 30 inches center to center. The 12-inch figure applies only to an accessible children's water closet.

    Reference: 2018 International Plumbing Code, 405.3.1

  4. A fixture with a concealed slip-joint connection is installed behind a wall. Under Section 405.9, what must be provided?

    Answer: An access panel or utility space at least 12 inches in its smallest dimension, or other approved arrangement

    Section 405.9 permits slip joints only with an approved elastomeric gasket and only on the trap outlet, trap inlet and within the trap seal. Fixtures with concealed slip-joint connections must have an access panel or utility space not less than 12 inches in its smallest dimension or other approved arrangement.

    Reference: 2018 International Plumbing Code, 405.9

  5. A designer wants to run a potable water service pipe across a property. Which location does Section 603.2.1 prohibit for the pipe?

    Answer: In, under or above a septic tank drainage field

    Section 603.2.1 says potable water service pipes may not be located in, under or above cesspools, septic tanks, septic tank drainage fields or seepage pits. Where soil or ground water is contaminated, analysis is required under Section 605.1. A shared trench with a listed sewer material is allowed by Section 603.2.

    Reference: 2018 International Plumbing Code, 603.2.1

  6. Using Table 604.3, what flow pressure must be available at the supply outlet for a shower that is controlled by a thermostatic mixing valve, and what is its flow rate?

    Answer: 20 psi at 2.5 gpm

    Table 604.3 lists a shower with a balanced-pressure, thermostatic or combination mixing valve at 2.5 gpm and 20 psi, while a plain shower is 2.5 gpm at 8 psi. A bathtub with such a valve is 4 gpm at 20 psi. A footnote says a lower flow rating from the valve manufacturer governs.

    Reference: 2018 International Plumbing Code, Table 604.3

  7. An apartment building has 12 bathroom groups (1.6 gpf water closets), 12 kitchen sinks with dishwashers and 12 residential clothes washers. The building drain is laid at 1/8 inch per foot. Using Tables 709.1 and 710.1(1), what is the minimum building drain size?

    Answer: 4 inches

    Bathroom groups: 12 x 5 = 60 dfu. Kitchen sinks with dishwashers: 12 x 2 = 24 dfu. Residential clothes washers: 12 x 2 = 24 dfu. Total = 108 dfu. At 1/8 inch per foot, Table 710.1(1) allows 36 dfu for 3 inches and 180 dfu for 4 inches, so 4 inches is the smallest size. The 5 and 6 inch rows (390 and 700 dfu) are larger than needed.

    Reference: 2018 International Plumbing Code, Tables 709.1 and 710.1(1)

  8. Which weights are required for sheet lead used as vent pipe flashing under Section 902.3?

    Answer: 3 pounds per square foot for field-constructed flashings and 2-1/2 pounds for prefabricated ones

    Section 902.3 sets sheet lead for vent flashings at not less than 3 pounds per square foot for field-constructed flashings and not less than 2-1/2 pounds per square foot for prefabricated flashings. The 4 pound figure is the shower liner lead in Section 421.5.2.3.

    Reference: 2018 International Plumbing Code, 902.3

  9. A manufacturer sells a fixture trap with an interior baffle that is not part of the fixture. When does Section 1002.2 accept a trap with interior partitions?

    Answer: Only when the trap is integral with the fixture or made of an approved corrosion-resistant material

    Section 1002.2 requires fixture traps to be self-scouring and not have interior partitions, except where integral with the fixture or made of an approved material resistant to corrosion and degradation. Section 1002.3 also lists traps that depend on interior partitions as prohibited, with the same exception.

    Reference: 2018 International Plumbing Code, 1002.2

  10. A flat roof of 14,000 square feet is to use a controlled-flow roof drain system. What is the minimum number of roof drains under Section 1110.4?

    Answer: Four

    Section 1110.4 requires not fewer than two roof drains on roof areas of 10,000 square feet or less and not fewer than four on roofs over 10,000 square feet. At 14,000 square feet the minimum is four.

    Reference: 2018 International Plumbing Code, 1110.4

Sources

Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.