Missouri licensing exam

Missouri Journeyman Electrician Exam (NASCLA): Practice Test & Licensing Guide

The NASCLA Accredited Journeyman Electrician exam that Missouri OSEC accepts as an approved electrical exam: 100 open-book questions on plans, safety, theory, troubleshooting and the NEC, 75 to pass.

Questions
100
Time limit
5 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Code Requirements

Two 480Y/277-volt switchboards face each other across an aisle in a new electrical room, and both have exposed live parts when their doors are open. What is the minimum clear working space depth required in front of each, per Table 110.26(A)(1)?

Requirements at a glance

AgencyMissouri Office of Statewide Electrical Contractors (OSEC), Division of Professional Registration; exams by PSI
Who needs itOptional statewide electrical contractor license: not needed where a city or county has no electrical license or you hold the required local license
Exam100 questions, 5 hours, 75% to pass
Books allowed2020 or 2023 NEC, 29 CFR 1926 and 1910, NFPA 70E 2024, NFPA 72 2022, Ugly's 2023 and Mike Holt theory
Fees$125 to PSI per exam; $200 non-refundable OSEC application fee; $500,000 liability insurance

Journeyman electricians who need a passing approved exam for a Missouri OSEC application or for a local license that accepts the NASCLA journeyman exam.

How to get licensed, step by step

  1. Decide whether you need the state license

    OSEC's license is optional. Check your city or county first: many require their own electrical license, and a holder of the required local license can use it instead. Plumbing and HVAC have no state license; they are local only.

    Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)RSMo Chapter 324 (electrical contractors, sections 324.900 to 324.945) (opens in a new tab)

  2. Apply to OSEC

    Send the application and $200 fee to OSEC. You need proof of $500,000 liability insurance and either a passing score on an approved exam or grandfathering for local licensees (an exam passed before 1/1/2018, or 12,000 hours of experience or 6 of the previous 8 years licensed locally).

    Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)OSEC: approved electrical contractor examinations (PDF) (opens in a new tab)

  3. Schedule with PSI

    Once OSEC approves you, pay PSI the $125 fee and schedule. The fee is not refundable or transferable and is valid for one year. Cancel at least 2 days ahead to keep your fee.

    Schedule with PSI (Missouri OSEC) (opens in a new tab)

  4. Take the open-book exam

    100 questions, 5 hours, 75% to pass. Bring your allowed references and a silent, non-programmable calculator; PSI hands out the diagram packet.

    Schedule with PSI (Missouri OSEC) (opens in a new tab)

How to prepare

  • Bring the 2020 or 2023 NEC (or NEC Handbook). Code questions use only those editions. Tab it before exam day.
  • Other approved exams (ICC, Prov) also count for OSEC, but this practice bank follows the PSI NASCLA exam and its open-book reference list.
  • Wiring and protection (18), wiring methods and materials (16) and general code requirements (15) are about half of the exam.
  • Testing and troubleshooting (7) and plans and specifications (6) use the diagram and blueprint packet PSI hands out on site.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC and Ugly's. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • National Electrical Code or NEC Handbook, 2020 or 2023 (allowed in the exam room)
  • 29 CFR 1926, OSHA Construction Industry Regulations, 2024
  • 29 CFR 1910, OSHA Occupational Safety and Health Standards, 2024
  • NFPA 70E, Standard for Electrical Safety in the Workplace, 2024
  • Ugly's Electrical References, 2023 Edition
  • Understanding Electrical Theory for NEC Applications, Mike Holt
  • NFPA 72, National Fire Alarm and Signaling Code, 2022

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Interpreting Plans and Specifications6
Basic Electrical Safety8
Electrical Theory and Principles10
Testing and Troubleshooting7
General Code Requirements15
Wiring and Protection18
Wiring Methods and Materials16
Equipment for General Use10
Special Occupancies and Equipment8
Special Conditions and Communication Systems2

Exam day details

  • Administered by PSI Services for the Missouri Office of Statewide Electrical Contractors (OSEC).
  • Fee: $125 to PSI (not refundable or transferable; valid one year from payment). OSEC application fee is separate.
  • 100 scored questions plus 10 unscored pretest items in 300 minutes (5 hours); 75 correct (75%) to pass.
  • Open book: bring your own copies of the allowed references plus a silent, non-printing, non-programmable calculator. PSI hands out a diagram and blueprint packet at the test center.
  • PSI adds 10 unscored pretest questions to the 100 scored ones.
  • Apply to OSEC first. Once OSEC approves you, pay and schedule with PSI.
  • Code questions use only the NEC editions listed (2020 or 2023). Other references may be a newer or older edition at your own risk.
  • The statewide license is optional: it is not needed where a city or county has no electrical license or you hold the required local license. Missouri also accepts other approved exams (ICC, Prov), but this bank follows the NASCLA exam on PSI's bulletin.

Note: The PSI bulletin marks its outline and reference list as effective through 12/31/2026, with changes on 1/1/2027. Check PSI's current bulletin for the references on your test date. The Journeyman exam fee is shown as a single $125 on the bulletin.

Frequently asked questions

What's on the Missouri journeyman electrician exam?

100 scored questions: wiring and protection 18, wiring methods and materials 16, general code requirements 15, theory and principles 10, equipment for general use 10, basic electrical safety 8, special occupancies and equipment 8, testing and troubleshooting 7, plans and specifications 6 and special conditions and communication systems 2.

Which books can I bring?

The 2020 or 2023 NEC (or NEC Handbook), 29 CFR 1926 and 1910 (2024), NFPA 70E (2024), NFPA 72 (2022), Ugly's Electrical References (2023) and Mike Holt's Understanding Electrical Theory for NEC Applications. PSI hands out a diagram packet.

Does Missouri have a state journeyman license?

No. OSEC licenses electrical contractors only; journeyman licensing is local. OSEC accepts an approved journeyman-level exam as proof for the contractor license.

Free questions with answers

Show all 10 free questions and answers
  1. Two 480Y/277-volt switchboards face each other across an aisle in a new electrical room, and both have exposed live parts when their doors are open. What is the minimum clear working space depth required in front of each, per Table 110.26(A)(1)?

    Answer: 4 ft (1.2 m), because exposed live parts are on both sides of the working space

    277 V to ground falls in the 151-600 V row. Exposed live parts on both sides of the working space is Condition 3, which requires 4 ft. Condition 2 (3 ft 6 in.) applies when the opposite side is grounded, and 5 ft appears only in the 601-1000 V row.

    Reference: NEC 2020/2023 (rule identical in both), Table 110.26(A)(1)

  2. A branch circuit will supply a 32-ampere continuous load. The overcurrent device is not marked for operation at 100 percent of its rating. What is the minimum standard overcurrent device rating?

    Answer: 40 amperes, because 32 A x 125 percent = 40 A

    A non-100-percent-rated overcurrent device must be sized at no less than the noncontinuous load plus 125 percent of the continuous load. 32 A x 1.25 = 40 A, which is a standard rating. A 35-A device is a standard size but is below the 40 A required.

    Reference: NEC 2020/2023 (rule identical in both), 210.20(A)

  3. A horizontal run of EMT is supported on a ceiling. What are the maximum fastening interval and the maximum distance from a junction box to the nearest support?

    Answer: 10 ft between supports and within 3 ft of each box

    EMT must be securely fastened at intervals not exceeding 10 ft and within 3 ft of each outlet box, junction box, cabinet or other termination. Limited exceptions allow 5 ft to the first support where structural members do not allow fastening within 3 ft.

    Reference: NEC 2020/2023 (rule identical in both), 358.30(A)

  4. A 3-phase, 480-volt motor load takes 10 kW at a power factor of 0.80 (lagging). What is the line current, using I = kVA x 1000 / (1.732 x E)?

    Answer: 15.0 amperes, from 12,500 VA / (1.732 x 480)

    Apparent power S = P / pf = 10 kW / 0.80 = 12.5 kVA. Line current = 12,500 / (1.732 x 480) = 12,500 / 831.4 = 15.04 A. Using the real power alone gives 12.0 A, which understates the current the conductors and breaker must carry.

    Reference: Power factor and three-phase current formulas (Ugly's Electrical References), General electrical theory: power factor and three-phase current

  5. An electrician must work on 240-volt conductors inside a panelboard where no exception to the rule applies. At or above what voltage must conductors and circuit parts normally be put into an electrically safe work condition before work within the limited approach boundary?

    Answer: 50 volts

    NFPA 70E 110.2(B) requires energized conductors and circuit parts operating at 50 volts or more to be put into an electrically safe work condition before an employee works within the limited approach boundary, unless an exception (infeasibility or increased hazard) is justified. 120 V is not a threshold in this rule.

    Reference: NFPA 70E, Standard for Electrical Safety in the Workplace, 2024, 110.2(B)

  6. What is the maximum rating of an inverse-time circuit breaker for the branch-circuit short-circuit and ground-fault protection of a 10-hp, 230-volt, 3-phase squirrel-cage (Design B) motor with a table full-load current of 28 amperes?

    Answer: 70 amperes, which is 250 percent of the table current

    Table 430.52 allows an inverse-time breaker up to 250 percent of the motor full-load current from Table 430.250: 28 x 2.5 = 70 A, a standard size. A smaller standard breaker is allowed, but 70 A is the maximum. If the motor will not start on this value, 430.52(C) allows a higher rating up to 400 percent for inverse-time breakers.

    Reference: NEC 2020/2023 (rule identical in both), 430.52(C)(1) and Table 430.52

  7. A permanently installed swimming pool at a new hotel requires a general-purpose 125-volt, 15- or 20-ampere receptacle. Within what distance range from the inside wall of the pool must the required receptacle be located?

    Answer: At least 6 ft but not more than 20 ft

    Section 680.22(A)(1) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit located at least 6 ft and not more than 20 ft from the inside wall of the pool, and not more than 6 ft 6 in. above the floor, platform or grade serving the pool.

    Reference: NEC 2020/2023 (rule identical in both), 680.22(A)(1)

  8. In the event of failure of the normal supply, an emergency system must have emergency power available within what maximum time?

    Answer: 10 seconds

    Section 700.12 requires an emergency system to supply emergency lighting, power or both within the time required for the application, but not to exceed 10 seconds. A legally required standby system (Article 701) has a 60-second limit, which is a common mix-up.

    Reference: NEC 2020/2023 (rule identical in both), 700.12

  9. A 120/240-volt single-phase service loses its neutral at the service point while two loads are on: a 12-ohm resistive load on one line-to-neutral leg and a 24-ohm resistive load on the other. What voltage appears across the 24-ohm load?

    Answer: 160 volts, since 240 x 24 / 36 = 160

    With an open neutral the two loads are in series across 240 V: total R = 12 + 24 = 36 ohms, I = 240 / 36 = 6.67 A. The drop across the 24-ohm load = 6.67 x 24 = 160 V, and across the 12-ohm load = 80 V. The smaller load gets the higher voltage, which is why lamps burn out and electronics fail.

    Reference: Mike Holt, Understanding Electrical Theory for NEC Applications, Series circuits and Ohm's law applied to an open neutral on a 120/240-volt system

  10. A 3-phase, 208-volt lighting panel schedule shows connected loads of 4,200 VA on phase A, 3,600 VA on phase B and 3,000 VA on phase C. What is the approximate average line current of the panel, using total VA / (1.732 x E)?

    Answer: 30.0 amperes, since 10,800 / 360.3 = 30.0

    Total connected load = 4,200 + 3,600 + 3,000 = 10,800 VA. For a 3-phase panel, I = VA / (1.732 x E) = 10,800 / (1.732 x 208) = 10,800 / 360.3 = 30.0 A. Dividing by 208 V alone gives the single-phase value, and 35 A is the largest phase leg at 120 V, which is not the line current.

    Reference: General electrical practice, General electrical plan-reading practice: reading panel schedules

Sources

Questions last verified November 11, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.