Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | Springfield (W17). OSEC also accepts ICC journeyman electrician exams as an approved exam |
| Exam | W17: 80 questions, 4 hours |
| Books allowed | 2017 National Electrical Code and Ugly's Electrical References (any edition) |
| Fees | $115 per ICC exam through Pearson VUE, plus your city's license fees |
Electricians applying for a journeyman electrician license in Springfield, or showing an ICC journeyman exam to OSEC or another Missouri city.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the journeyman electrician exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Wiring methods and materials (26%) and branch circuits and conductors (19%) are close to half the exam: NEC Chapters 2 and 3.
- This exam uses the 2017 NEC. The PSI NASCLA exams use the 2020 or 2023 NEC, so do not mix the editions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2017 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2017 EditionEssential
Allowed in the exam room. The ICC Missouri electrician exams are built on the 2017 edition, not the 2020 or 2023 NEC used by the PSI NASCLA exams.
Ugly's Electrical References (any edition)
Allowed in the exam room. Formulas for voltage drop, power, motors and load calculations.
Official reference list (as published by the testing agency)
- 2017 National Electrical Code (NEC) (allowed in the exam room)
- Ugly's Electrical References (any edition) (allowed in the exam room)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 6 | |
| Services and Service Equipment | 11 | |
| Feeders | 4 | |
| Branch Circuits and Conductors | 19 | |
| Wiring Methods and Materials | 26 | |
| Equipment and Devices | 13 | |
| Control Devices | 4 | |
| Motors and Generators | 6 | |
| Special Occupancies, Equipment, and Conditions | 11 |
The outline totals 100; the other items on the 80-question exam are unscored or unassigned.
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
- 80 multiple-choice questions in 4 hours; passing score not published (75% used as practice target).
- Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
- Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
- If you fail, wait 10 days to retake (ICC bulletin).
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the ICC journeyman electrician exam?
80 questions: wiring methods and materials 26%, branch circuits and conductors 19%, equipment and devices 13%, services 11%, special occupancies 11%, general knowledge 6%, motors and generators 6%, feeders 4% and control devices 4%.
Which NEC edition does it use?
The 2017 NEC with Ugly's Electrical References.
How is it different from the NASCLA journeyman exam?
The PSI NASCLA exam is 100 questions on the 2020 or 2023 NEC; this ICC exam is 80 questions on the 2017 NEC. Practice with the one your city or OSEC will accept.
Free questions with answers
Show all 10 free questions and answers
Three loads of 20, 30 and 60 ohms are connected in parallel across a 120-volt source. What is the total line current?
Answer: 12 amperes
Parallel resistance: 1/RT = 1/20 + 1/30 + 1/60 = 6/60, so RT = 10 ohms. I = E / R = 120 / 10 = 12 A (the branch currents 6 + 4 + 2 also total 12 A). Adding the resistances as in a series circuit (110 ohms) gives 1.1 A, using only the 20-ohm load gives 6 A, and using the average resistance gives 3.3 A.
Reference: NFPA 70, National Electrical Code, 2017, General electrical theory (Ohm's law, parallel circuits; Ugly's Electrical References)
A service uses two parallel sets of 3/0 AWG copper ungrounded conductors (167,800 circular mils each). The grounding electrode conductor runs to a metal underground water pipe. Using Table 250.66 and its note on parallel conductors, what is the minimum size copper grounding electrode conductor?
Answer: 2 AWG
Where conductors are in parallel, the Table 250.66 size is based on the total area of the conductors in one phase: 2 x 167,800 = 335,600 cmil. That is over 3/0 AWG through 350 kcmil, which requires a 2 AWG copper GEC. Using one 3/0 conductor gives 4 AWG, and 1/0 AWG applies to over 350 through 600 kcmil. A 6 AWG conductor is only allowed to a rod under 250.66(A).
Reference: NFPA 70, National Electrical Code, 2017, Table 250.66 and its note on conductors in parallel; 250.66
A feeder carries 70 A of continuous load and 50 A of noncontinuous load. The feeder will use THWN copper conductors on 75 degree C terminals, and no adjustment or correction factors apply. Under 215.2(A)(1), what is the smallest copper conductor size?
Answer: 1/0 AWG
Minimum feeder ampacity = (70 x 1.25) + 50 = 87.5 + 50 = 137.5 A. In the 75 degree C column of Table 310.15(B)(16), 1 AWG is 130 A (too small) and 1/0 AWG is 150 A, so 1/0 AWG is the smallest. 2 AWG (115 A) is far too small, and 2/0 AWG (175 A) would work but is not the minimum.
Reference: NFPA 70, National Electrical Code, 2017, 215.2(A)(1); Table 310.15(B)(16); 110.14(C)(1)
Under 210.52(A)(2), which wall space in a dwelling living room is counted when spacing the required receptacle outlets?
Answer: Any wall space two feet or more in width, including space around corners and fixed room dividers
Section 210.52(A)(2) defines wall space as any space 2 ft or more in width, including space measured around corners and unbroken wall space within hallways, and the wall space afforded by fixed room dividers such as freestanding bar-type counters. Narrower spaces and spaces behind doors that are opened do not count.
Reference: NFPA 70, National Electrical Code, 2017, 210.52(A)(2)
How many branch circuits does 210.11(C)(3) require for the receptacle outlets in a dwelling's bathrooms, and what rating?
Answer: At least one 20-ampere branch circuit
Section 210.11(C)(3) requires at least one 20 A branch circuit to supply the bathroom receptacle outlet or outlets, with no other outlets on the circuit (except where it supplies only one bathroom). A 15 A circuit does not meet the minimum rating, and the circuit does not have to be a 30 A circuit.
Reference: NFPA 70, National Electrical Code, 2017, 210.11(C)(3)
A straight pull in a pull box has a 3-inch conduit entering one wall and exiting the opposite wall, with 4 AWG and larger conductors. Under 314.28(A)(1), what is the minimum length of the box?
Answer: 24 inches
For straight pulls, the box length must be at least eight times the trade size of the largest raceway: 8 x 3 in = 24 in. 18 in is the six-times angle-pull multiplier, 12 in is too short, and 32 in would be right for a 4-inch raceway.
Reference: NFPA 70, National Electrical Code, 2017, 314.28(A)(1)
Which requirement applies to the lighting of the working space around a panelboard installed in an indoor electrical room?
Answer: Illumination is required, and it may not be controlled only by automatic means
Section 110.26(D) requires illumination for working spaces about service equipment, switchboards, panelboards or motor control centers installed indoors, and the lighting must not be controlled only by automatic means. A sensor alone could leave a worker in the dark.
Reference: NFPA 70, National Electrical Code, 2017, 110.26(D)
A general-use ac snap switch is rated 20 amperes. Under 404.14(A), what is the maximum motor load it may control?
Answer: 16 amperes
Section 404.14(A) limits motor loads on a general-use ac snap switch to 80 percent of the switch's ampere rating at its rated voltage: 20 x 0.80 = 16 A. A resistive or inductive load may use the full rating; 12 A is 60 percent and 25 A exceeds the rating.
Reference: NFPA 70, National Electrical Code, 2017, 404.14(A)
A 10 hp, 208-volt, 3-phase continuous-duty motor has a Table 430.250 full-load current of 30.8 A. The branch-circuit conductors are THWN copper on 75 degree C terminals. Under 430.22, what is the smallest conductor size?
Answer: 8 AWG
Conductor ampacity must be at least 125 percent of the Table 430.250 full-load current: 30.8 x 1.25 = 38.5 A. In the 75 degree C column of Table 310.15(B)(16), 10 AWG is 35 A (too small) and 8 AWG is 50 A. 12 AWG is 25 A and 6 AWG (65 A) is larger than needed.
Reference: NFPA 70, National Electrical Code, 2017, 430.22; Table 430.250; Table 310.15(B)(16)
A receptacle in a backyard is not for pool pump equipment and is located near a residential swimming pool. Under 680.22(A), how far from the inside walls of the pool must it be, and what protection is required for receptacles within 20 feet?
Answer: At least 6 feet from the inside wall, with GFCI protection for receptacles within 20 feet
Section 680.22(A) of the 2017 NEC requires other (non-pump) receptacles to be at least 6 ft from the inside walls of the pool, and all 15- and 20-ampere, single-phase, 125-volt through 250-volt receptacles within 20 ft of the inside walls must be GFCI protected. AFCI protection is not the pool rule, 3 ft is too close, and the GFCI requirement does not depend on the receptacle being indoors.
Reference: NFPA 70, National Electrical Code, 2017, 680.22(A)
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.