Requirements at a glance
| Agency | Missouri Office of Statewide Electrical Contractors (OSEC), Division of Professional Registration; exams by PSI |
|---|---|
| Who needs it | Optional statewide electrical contractor license: not needed where a city or county has no electrical license or you hold the required local license |
| Exam | 100 questions, 4.5 hours, 75% to pass |
| Books allowed | 2020 or 2023 NEC, 29 CFR 1926 and 1910, NFPA 70E 2024, Ugly's 2023, Mike Holt theory, PMBOK 7th Edition, ASHRAE 90.1-2022 and the NASCLA Contractors Guide |
| Fees | $125 to PSI per exam; $200 non-refundable OSEC application fee; $500,000 liability insurance |
Electrical contractors applying to Missouri OSEC for the optional statewide electrical contractor license who have not passed another approved exam.
Official links
- Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)
- OSEC: approved electrical contractor examinations (PDF) (opens in a new tab)
- Schedule with PSI (Missouri OSEC) (opens in a new tab)
- RSMo Chapter 324 (electrical contractors, sections 324.900 to 324.945) (opens in a new tab)
How to get licensed, step by step
Decide whether you need the state license
OSEC's license is optional. Check your city or county first: many require their own electrical license, and a holder of the required local license can use it instead. Plumbing and HVAC have no state license; they are local only.
Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)RSMo Chapter 324 (electrical contractors, sections 324.900 to 324.945) (opens in a new tab)
Apply to OSEC
Send the application and $200 fee to OSEC. You need proof of $500,000 liability insurance and either a passing score on an approved exam or grandfathering for local licensees (an exam passed before 1/1/2018, or 12,000 hours of experience or 6 of the previous 8 years licensed locally).
Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)OSEC: approved electrical contractor examinations (PDF) (opens in a new tab)
Schedule with PSI
Once OSEC approves you, pay PSI the $125 fee and schedule. The fee is not refundable or transferable and is valid for one year. Cancel at least 2 days ahead to keep your fee.
Take the open-book exam
100 questions, 4.5 hours, 75% to pass. Bring your allowed references and a silent, non-programmable calculator; PSI hands out the diagram packet.
How to prepare
- Bring the 2020 or 2023 NEC (or NEC Handbook). Code questions use only those editions. Tab it before exam day.
- Other approved exams (ICC, Prov) also count for OSEC, but this practice bank follows the PSI NASCLA exam and its open-book reference list.
- General code requirements (17), wiring and protection (17) and wiring methods and materials (16) are half of the exam: tab NEC Chapters 1 to 3 and Chapter 9 tables.
- Project design and management (8) comes from the PMBOK Guide and the NASCLA guide: scheduling, cost, risk and contracts.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and Ugly's. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 or 2023 EditionEssential
Most of the exam. Missouri's PSI bulletin allows either edition and bases code questions only on them.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References, 2023 EditionEssential
Formulas for current, voltage drop, power, motors and transformers.
NFPA 70E: Standard for Electrical Safety in the Workplace, 2024 Edition
Approach boundaries, arc flash PPE categories and the electrically safe work condition.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Official reference list (as published by the testing agency)
- National Electrical Code or NEC Handbook, 2020 or 2023 (allowed in the exam room)
- 29 CFR 1926, OSHA Construction Industry Regulations, 2024
- 29 CFR 1910, OSHA Occupational Safety and Health Standards, 2024
- NFPA 70E, Standard for Electrical Safety in the Workplace, 2024
- Ugly's Electrical References, 2023 Edition
- Understanding Electrical Theory for NEC Applications, Mike Holt
- A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition, 2021
- ANSI/ASHRAE/IES 90.1-2022, Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings
- NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th Edition, 2024
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Project Design & Management | 8 | |
| Safety | 9 | |
| Electrical Theory and Principles | 11 | |
| General Code Requirements | 17 | |
| Wiring and Protection | 17 | |
| Wiring Methods & Materials | 16 | |
| General Equipment Use | 13 | |
| Special Occupancies, Special Equipment, and Special Conditions | 8 | |
| Communication Systems | 1 |
Exam day details
- Administered by PSI Services for the Missouri Office of Statewide Electrical Contractors (OSEC).
- Fee: $125 to PSI (not refundable or transferable; valid one year from payment). OSEC application fee is separate.
- 100 scored questions plus 10 unscored pretest items in 270 minutes (4.5 hours); 75 correct (75%) to pass.
- Open book: bring your own copies of the allowed references plus a silent, non-printing, non-programmable calculator. PSI hands out a diagram and blueprint packet at the test center.
- PSI adds 10 unscored pretest questions to the 100 scored ones.
- Apply to OSEC first. Once OSEC approves you, pay and schedule with PSI.
- Code questions use only the NEC editions listed (2020 or 2023). Other references may be a newer or older edition at your own risk.
- The statewide license is optional: it is not needed where a city or county has no electrical license or you hold the required local license. Missouri also accepts other approved exams (ICC, Prov), but this bank follows the NASCLA exam on PSI's bulletin.
Note: The PSI bulletin marks its outline and reference list as effective through 12/31/2026, with changes on 1/1/2027. Check PSI's current bulletin for the references on your test date. The Journeyman exam fee is shown as a single $125 on the bulletin.
Frequently asked questions
What's on the Missouri electrical contractor exam?
100 scored questions: general code requirements 17, wiring and protection 17, wiring methods and materials 16, general equipment use 13, electrical theory and principles 11, safety 9, project design and management 8, special occupancies 8 and communication systems 1.
Which NEC edition does the exam use?
The 2020 or 2023 NEC (or NEC Handbook). Code questions are based only on those listed editions.
Do I need a Missouri license to do electrical work?
The statewide OSEC license is optional. You do not need it where a city or county has no electrical license or you hold the required local license. Plumbing and HVAC have no state license at all.
Free questions with answers
Show all 10 free questions and answers
A 45-kW resistive heating load is supplied by a 480-volt, three-phase system at unity power factor. What is the approximate line current?
Answer: 54.1 A
For three-phase loads I = P / (E x 1.732 x PF) = 45,000 / (480 x 1.732 x 1.0) = 54.1 A. 93.8 A is the single-phase result (45,000 / 480). 162.4 A multiplies by 1.732 instead of dividing, and 31.3 A divides by 1.732 a second time.
Reference: Ugly's Electrical References, 2023, Three-phase current: I = P / (E x 1.732 x PF)
A safety manager explains that the arc flash boundary is the distance at which an unprotected person would receive an incident energy of what value, roughly the onset of a second-degree burn?
Answer: 1.2 cal/cm2
NFPA 70E Article 100 defines the arc flash boundary as the distance at which incident energy equals 1.2 cal/cm2 (5.0 J/cm2). The 4 and 8 cal/cm2 values are the minimum arc ratings of PPE categories 1 and 2, not the boundary definition. 0.5 cal/cm2 is not a value used in the definition.
Reference: NFPA 70E, Standard for Electrical Safety in the Workplace, 2024, Article 100, Arc Flash Boundary
A project schedule has activity A (3 days) first, then B (5 days) and C (8 days) both following A, and D (4 days) follows both B and C. What is the total float of activity B?
Answer: 3 days
Path A-B-D takes 3 + 5 + 4 = 12 days and path A-C-D takes 3 + 8 + 4 = 15 days, so A-C-D is the critical path. B can slip by the difference, 15 - 12 = 3 days, without delaying the project. Critical activities have 0 float, and 5 and 8 are activity durations, not float.
Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Project management: critical path method and float
A 480-volt disconnect is mounted 9 feet above the floor in a mechanical room, and a worker must bring a portable ladder to reach the handle. Under Article 100, how is this disconnect classified?
Answer: Accessible, but not readily accessible
Article 100 defines readily accessible as capable of being reached quickly without climbing over or removing obstacles or resorting to portable ladders. A disconnect that needs a ladder is still accessible (it can be reached) but is not readily accessible. Rules that require a readily accessible location, such as a service disconnect, would not be met.
Reference: NFPA 70, National Electrical Code, 2023, Article 100, Accessible; Readily Accessible
Unless specifically permitted elsewhere in the NEC, what is the maximum overcurrent protection for 10 AWG copper conductors?
Answer: 30 A
Section 240.4(D) limits small conductors: 14 AWG copper to 15 A, 12 AWG copper to 20 A and 10 AWG copper to 30 A, even though Table 310.16 lists 10 AWG copper at 35 A in the 75 degree C column and 40 A in the 90 degree C column. Those higher table ampacities do not raise the overcurrent limit, and 25 A is not the limit in that section.
Reference: NFPA 70, National Electrical Code, 2023, 240.4(D)
Which of these is NOT a standard ampere rating for fuses and inverse time circuit breakers?
Answer: 75 A
Section 240.6(A) lists standard ratings, including 45, 50, 60, 70, 80, 90, 100, 110, 125, 150 and 175 A. 70 A and 80 A are standard, but 75 A is not. The common mistake is to assume every multiple of 5 is standard; 45 A and 110 A are listed.
Reference: NFPA 70, National Electrical Code, 2023, 240.6(A)
Two three-phase circuits, a total of six current-carrying 10 AWG copper THHN conductors, share one EMT run through a conditioned ceiling space where the ambient is 30 degrees C. After applying only the adjustment for the number of conductors to the 90 degree C ampacity in Table 310.16, what ampacity is each conductor credited with?
Answer: 32 A
10 AWG THHN is 40 A in the 90 degree C column of Table 310.16. Six current-carrying conductors require an 80 percent adjustment from Table 310.15(C)(1) (same table number in the 2020 and 2023 editions): 40 x 0.80 = 32 A. 35 A is the unadjusted 75 degree C value, 40 A skips the adjustment, and 28 A uses the 70 percent factor for 7 to 9 conductors.
Reference: NFPA 70, National Electrical Code, 2023, Table 310.16 and Table 310.15(C)(1)
The same 30-hp, 460-volt motor (Table 430.250 full-load current 40 A) is protected by a dual-element (time-delay) fuse. Using the motor protection table in 430.52(C)(1), what is the maximum fuse size without any exception being needed?
Answer: 70 A
Table 430.52 permits a dual-element time-delay fuse of up to 175 percent of the full-load current for a squirrel-cage motor: 40 x 1.75 = 70 A, which is a standard rating (240.6(A)). 100 A is the 250 percent value for an inverse time circuit breaker, 80 A is 200 percent, and 50 A is the 125 percent conductor ampacity from 430.22.
Reference: NFPA 70, National Electrical Code, 2023, 430.52(C)(1) and Table 430.52(C)(1) (Table 430.52 in the 2020 edition)
A conduit seal in a Class I, Division 1 location will contain conductors. Under 501.15(C)(3), what is the maximum percentage of the cross-sectional area of the same trade size rigid metal conduit that the conductors may fill, unless the seal is identified for a higher fill?
Answer: 25 percent
Section 501.15(C)(3) limits the conductor or optical fiber tube fill in a seal to 25 percent of the cross-sectional area of rigid metal conduit of the same trade size, unless the seal is identified for a higher percentage of fill. 31, 40 and 53 percent are the Chapter 9, Table 1 conduit fill percentages for two, three or more, and one conductor, which do not apply to seals.
Reference: NFPA 70, National Electrical Code, 2023, 501.15(C)(3)
What is the smallest copper conductor permitted for the bonding conductor or grounding electrode conductor of a communications primary protector under 800.100(A)(3)?
Answer: 14 AWG
Section 800.100(A)(3) states the conductor shall not be smaller than 14 AWG, must carry at least as much current as the metal members of the protected cable, and is not required to be larger than 6 AWG. 18 AWG is a typical signal wire size, not a bonding size.
Reference: NFPA 70, National Electrical Code, 2023, 800.100(A)(3)
Sources
- PSI: Missouri OSEC electrical exam candidate bulletin and scheduling (opens in a new tab)
- Missouri Office of Statewide Electrical Contractors (OSEC) (opens in a new tab)
- OSEC: approved electrical contractor examinations (PDF) (opens in a new tab)
Questions last verified November 11, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.