Minnesota licensing exam

Minnesota Water Conditioning Journeyworker Exam: Practice Test & Licensing Guide

The Minnesota DLI water conditioning journeyworker exam: 60 questions on the 2020 Minnesota Plumbing Code and water conditioning installation. Open book, 3 hours, 70% to pass.

Questions
60
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Definitions and General Regulations (Chapters 2 and 3)

Under the Minnesota amendment to the UPC definition of potable water, potable water must be satisfactory for drinking, culinary and domestic purposes and must meet the requirements of which body?

Requirements at a glance

AgencyMinnesota Department of Labor and Industry (DLI); Plumbing Board sets the rules
Experience6 months as a registered unlicensed water conditioner, including 100 hours of installation and 200 hours of servicing (Rules 4716.0092)
Exam60 questions, 3 hours, 70% to pass
Books allowedNone of your own: DLI supplies the 2020 Minnesota Plumbing Code (without tabs), the laws-and-rules booklet and a calculator
Fees$50 per personal-license exam (Minn. Stat. 326B.092), plus application and license fees

Registered unlicensed water conditioners applying to DLI for a journeyworker license after 6 months of experience, including installation and servicing hours.

How to get licensed, step by step

  1. Apply to DLI

    Send DLI your water conditioning journeyworker application, proof of registered experience and the $50 exam fee. Licensed plumbers do not need a water conditioning license.

    Minnesota Department of Labor and Industry (DLI) (opens in a new tab)DLI: plumbing license basics (opens in a new tab)

  2. Schedule your exam

    After DLI approves your application, you schedule the exam in DLI's iMS system. DLI gives exams at its St. Paul office (Tuesday to Thursday) and at outstate sites including Duluth, Mankato, Rochester and St. Cloud.

    DLI: license exam schedule (opens in a new tab)

  3. Take the exam

    You have 3 hours and need 70%. The exam is open book with DLI-supplied references; no personal books, notes or electronic devices.

    DLI: plumbing license basics (opens in a new tab)DLI Plumbing License Examination Guide (PDF) (opens in a new tab)

  4. Results and retakes

    DLI mails results in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.

    DLI: license exam schedule (opens in a new tab)

How to prepare

  • The exam is based on the 2020 Minnesota Plumbing Code (Rules 4714), mainly Chapter 6 and Rules 4714.0611 on water conditioning equipment, plus Rules 4716 and Statutes 326B.50 to 326B.59. DLI's guide is one checklist for several plumbing licenses, so only some rows apply to you.
  • Know the Rules 4714.0611 items cold: NSF standards for wetted surfaces, labeling, airgap discharge, connection tubing, residential softener sizing and isolation and bypass valves.
  • Every DLI exam is open book, but with DLI-supplied references only: a code book without tabs, the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, so practice finding answers fast rather than relying on tabs.
  • DLI publishes no topic weights, so our topic split is an estimate. Several versions of each exam are in use, and some questions ask for more than one answer or the choice that does not apply.
  • Focus on Chapter 6 (water supply and water conditioning equipment) and Chapter 7 pipe materials and joints; these make up most of the rows DLI marks for water conditioning.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Minnesota Plumbing Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 2020 Minnesota Plumbing Code, Minnesota Rules chapter 4714 (the 2018 Uniform Plumbing Code with Minnesota amendments), including Rules 4714.0611 (water conditioning equipment). DLI provides the code book, without tabs.
  • Minnesota Rules chapter 4716 (water conditioning licensing) and Minnesota Statutes 144, 325 and 326B.50 to 326B.59 (in the DLI laws-and-rules booklet)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Definitions and General Regulations (Chapters 2 and 3)4
Water Supply: Identification, Unlawful Connections and Prohibited Installation (Chapter 6)10
Water Conditioning Equipment: Application, Manufacture, Labeling and Airgap Discharge12
Sizing of Residential Softeners, Isolation and Bypass10
Pipe Materials and Joints (Chapters 6 and 7)10
Water Conditioning Processes and Equipment Operation8
Minnesota Water Conditioning Licensing and Law (Rules 4716, Statutes 326B.50 to 326B.59)6

Exam day details

  • Administered by the Minnesota Department of Labor and Industry (DLI), which gives its own exams.
  • Fee: $50 per personal-license exam (Minn. Stat. 326B.092). Application and license fees are separate.
  • 60 questions in 3 hours, open book with DLI-supplied references; 70% to pass.
  • Open book with DLI-supplied references: you get the code book (without tabs), the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, notes or electronic devices.
  • DLI gives the exam at its St. Paul office and outstate sites, scheduled after DLI approves your application. The time limit is 3 hours; the passing score is 70%.
  • Results are mailed in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.
  • Some questions ask you to pick more than one answer (the question says how many) or the one choice that does not apply. Several versions of each exam are in use.
  • DLI's plumbing guide (April 2022) is one checklist for several licenses; the rows marked for water conditioning are mostly Chapter 6 (water supply and water conditioning equipment) and Chapter 7 (pipe materials and joints), plus general regulations and definitions. Not every row is clearly marked, so our topic split is an estimate.
  • Rules 4716.0092 says the exam covers plumbing and installation provisions, materials and tools of the trade, water conditioning processes and equipment operation; the master exam adds equipment-size calculations. DLI publishes no topic weights.
  • Rules 4714.0611 replaces UPC sections 611.0 to 611.3 and adds 611.5: equipment wetted surfaces, labeling, airgap discharge, connection tubing, residential softener sizing (UPC Table 611.4) and isolation and bypass valves.

Note: DLI's guide marks water conditioning rows within a shared plumbing checklist and publishes no weights, so our topic split is an estimate. Questions follow Rules 4714 and the 2018 UPC chapters 3, 6 and 7, Rules 4716 and Statutes 326B.50 to 326B.59; Statutes 144 and 325 were not on file.

Frequently asked questions

How many questions are on the Minnesota water conditioning journeyworker exam?

60 questions in 3 hours; 70% to pass.

What experience do I need?

Rules 4716.0092 requires 6 months as a registered unlicensed water conditioner, including 100 hours of installation and 200 hours of servicing. No hours count before age 17.

Do licensed plumbers need this license?

No. Minn. Stat. 326B.59 exempts licensed plumbers from the water conditioning license.

Free questions with answers

Show all 10 free questions and answers
  1. Under the Minnesota amendment to the UPC definition of potable water, potable water must be satisfactory for drinking, culinary and domestic purposes and must meet the requirements of which body?

    Answer: The Health Authority, meaning the state health department or local public health agency

    Rules 4714.0218 amends the Potable Water definition to require that the water meet the requirements of the Health Authority. Rules 4714.0210 defines Health Authority as the state health department or local public health agency with authority under law to enforce rules governing drinking water supply. The commissioner is the plumbing administrative authority, not the drinking water authority.

    Reference: Minnesota Rules chapter 4714 (2020 Minnesota Plumbing Code), 4714.0218 (Potable Water) and 4714.0210, subp. 2 (Health Authority)

  2. Water piping supplied by a private water supply system is to be connected to another source of supply. What does Minnesota's UPC 602.4 require first?

    Answer: Approval of the authority having jurisdiction

    Rules 4714.0602, subp. 2 amends UPC 602.4 to read that no water piping supplied by a private water supply system shall be connected to any other source of supply without the approval of the Authority Having Jurisdiction. The goal is to prevent cross-connections between a private supply and another supply.

    Reference: Minnesota Rules chapter 4714 (2020 Minnesota Plumbing Code), 4714.0602, subp. 2 (UPC 602.4)

  3. Minnesota amends UPC 603.5.17 on potable water outlets and stop-and-waste valves. When may a freeze-proof yard hydrant be installed underground?

    Answer: When it is at least two feet above the water table and at least ten feet from any sewer or similar source of contamination

    Rules 4714.0603, subp. 4 states that potable water outlets, freeze-proof yard hydrants, combination stop-and-waste valves and similar fixtures that drain into the ground shall not be installed underground, except a freeze-proof yard hydrant located at least two feet above the water table and at least ten feet from any sewer or similar contamination source. The two numbers are easy to swap.

    Reference: Minnesota Rules chapter 4714 (2020 Minnesota Plumbing Code), 4714.0603, subp. 4 (UPC 603.5.17)

  4. What must the label on water conditioning equipment identify under Minnesota's UPC 611.1.2?

    Answer: The type of equipment and the name and address of the responsible manufacturer or licensed contractor

    Section 611.1.2 requires all conditioning equipment to be labeled so as to clearly identify the type of equipment and the name and address of the manufacturer, licensed plumbing contractor or licensed water conditioning contractor. Which of those labels depends on who built the complete system.

    Reference: Minnesota Rules chapter 4714 (2020 Minnesota Plumbing Code), 4714.0611, subp. 1 (UPC 611.1.2)

  5. A large home has five bathroom groups. How is the softener connection sized under Table 611.4?

    Answer: Engineered for the specific installation

    Footnote 3 of Table 611.4 says that over four bathroom groups the softener size shall be engineered for the specific installation. The table does not give a standard connection size beyond four groups, and parallel units or extra valves are not substitutes for engineering.

    Reference: 2018 Uniform Plumbing Code (as adopted by Minnesota Rules 4714.0050), Table 611.4, footnote 3

  6. A house has two bathroom groups, a kitchen sink with a dishwasher, and a laundry tray with an automatic clothes washer. What size does Table 611.4 call for the softener connection?

    Answer: 3/4 inch

    Footnote 1 of Table 611.4 allows installation of a kitchen sink and dishwasher, a laundry tray and an automatic clothes washer without any additional size increase. The count is therefore only two bathroom groups, which is the 3/4-inch row.

    Reference: 2018 Uniform Plumbing Code (as adopted by Minnesota Rules 4714.0050), Table 611.4, footnote 1

  7. A piece of tubing was taken out of a chemical feed line and is a clean-looking length. May it be reused in a potable water system under UPC 604.8?

    Answer: No, piping previously used for another purpose cannot be used

    UPC 604.8 says piping and tubing that has previously been used for a purpose other than for potable water systems shall not be used in potable water systems. Flushing, trimming or the owner's consent does not change that, since residues from the earlier use can contaminate drinking water.

    Reference: 2018 Uniform Plumbing Code (as adopted by Minnesota Rules 4714.0050), Section 604.8 (Previously Used Piping and Tubing)

  8. Under UPC 605.16.1, copper tubing is to be joined to threaded steel pipe using a copper alloy nipple. What is the minimum length of that nipple?

    Answer: 6 inches

    UPC 605.16.1 allows the transition from copper pipe or tubing to threaded pipe to be made with a copper alloy adapter, a copper alloy nipple of at least 6 inches, or a dielectric fitting or union meeting ASSE 1079. The copper-side joint is soldered, brazed, flared or press-connect, and the threaded side uses a standard pipe size threaded joint.

    Reference: 2018 Uniform Plumbing Code (as adopted by Minnesota Rules 4714.0050), Section 605.16.1 (Copper to Threaded Pipe Joints)

  9. Under Rules 4716.0092, which hours of experience may NOT be counted toward the experience requirement for a water conditioning license?

    Answer: Hours worked before the applicant reached age 17

    Rules 4716.0092, subp. 4, item C says an applicant may not include any hours of experience obtained before attaining the age of 17. The rule also credits no more than 1,750 hours in one calendar year as a 12-month period, but experience with a licensed contractor or on residential work counts normally.

    Reference: Minnesota Rules chapter 4716, 4716.0092, subp. 4(C)

  10. Where does the spent brine and rinse water from a softener's regeneration cycle go under Minnesota's UPC 611.2?

    Answer: Into the drainage system through an air gap or an air gap device

    Regeneration waste is a discharge from water conditioning equipment, so UPC 611.2 as rewritten in Rules 4714.0611 requires it to enter the drainage system through an air gap in accordance with Table 603.3.1, or an air gap device in accordance with Table 603.2, NSF 58 or IAPMO PS 65. A direct connection to the drain would allow sewage to be drawn back into the unit.

    Reference: Minnesota Rules chapter 4714 (2020 Minnesota Plumbing Code), 4714.0611, subp. 1 (UPC 611.2)

Sources

Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.