Requirements at a glance
| Agency | Minnesota Department of Labor and Industry (DLI) |
|---|---|
| Experience | 1 year of operating experience (12 months including a heating season for low-pressure heating); a notarized affidavit of experience is required |
| Exam | 50, 60 or 80 questions by grade (C, B, A), 2.5 hours, 70% to pass; our practice exam uses 60 |
| Books allowed | DLI does not state whether the exam is open or closed book; ask DLI when you schedule |
| Fees | $50 exam fee (nonrefundable, good for one year), plus the two-year license fee (DLI chart, September 2023: special $20, first and second class $40) |
Boiler operators with 1 year of operating experience (12 months including a heating season for low-pressure heating) applying for a second class license.
Official links
How to get licensed, step by step
Apply to DLI
Send DLI your second class application, the notarized affidavit of operating experience and the $50 exam fee. A second class engineer may operate plants up to 100 horsepower, or take shift duty in plants up to 500 horsepower.
Minnesota Department of Labor and Industry (DLI) (opens in a new tab)DLI: boiler engineer licenses (opens in a new tab)
Schedule your exam
After DLI approves your application, you schedule the exam in DLI's iMS system. DLI gives exams at its St. Paul office (Tuesday to Thursday) and at outstate sites including Duluth, Mankato, Rochester and St. Cloud.
Take the exam
You have 2.5 hours and need 70%. DLI's chief boiler inspector prepares the exam; DLI does not state whether it is open or closed book, so ask DLI before exam day.
DLI: boiler engineer licenses (opens in a new tab)Minnesota Rules chapter 5225 (boilers) (opens in a new tab)Minnesota Statutes 326B.95 to 326B.998 (boilers) (opens in a new tab)
Results and retakes
DLI mails results in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.
How to prepare
- Practice heating surface and horsepower (10 square feet of heating surface is 1 boiler horsepower), feedwater and treatment, and the Rules 5225 attendance and operation requirements.
- Every DLI exam is open book, but with DLI-supplied references only: a code book without tabs, the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, so practice finding answers fast rather than relying on tabs.
- DLI publishes no topic weights, so our topic split is an estimate. Several versions of each exam are in use, and some questions ask for more than one answer or the choice that does not apply.
- DLI publishes no blueprint, sample questions or book policy for boiler exams, so our topic split is an estimate. Questions rest on Minnesota Statutes 326B.95 to 326B.998, Rules 5225 and textbook-standard boiler practice.
- DLI's listed study books are Low Pressure Boilers (Steingress), High Pressure Boilers (Steingress and Frost) and Stationary Engineering. Grade A exams are longer and include the grade B content, so this bank covers grades C and B.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
Minnesota Rules chapter 5225 and Statutes 326B.95 to 326B.998 (boilers and pressure vessels)Essential
The licensing, operation, attendance and safety rules DLI's chief boiler inspector tests. DLI does not state whether the exam is open book.
Official reference list (as published by the testing agency)
- Minnesota Statutes 326B.95 to 326B.998 and Minnesota Rules chapter 5225 (DLI's Second Class - Chief Statutes and Rules study document)
- DLI's listed study books: Low Pressure Boilers (Steingress), High Pressure Boilers (Steingress and Frost) and Stationary Engineering (Steingress, Frost and Walker); the special exam also lists Safe Boiler Operation Fundamentals (ATP)
- ASME Boiler and Pressure Vessel Code (Sections I, IV, VI and VII, per Rules 5225.0050) and the National Board Inspection Code
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Boiler Construction, Types and Fittings | 8 | |
| Safety Valves, Water Gauges and Controls | 9 | |
| Operation, Firing and Combustion | 9 | |
| Feedwater, Water Treatment and Blowdown | 7 | |
| Heating Surface, Capacity and Calculations | 6 | |
| Pumps, Piping and Auxiliary Equipment | 5 | |
| Boiler Safety and Maintenance | 5 | |
| Inspection and Registration (Minnesota Statutes 326B.95 to 326B.998) | 5 | |
| Licensing and Attendance Rules (Minnesota Rules 5225) | 6 |
Exam day details
- Administered by the Minnesota Department of Labor and Industry (DLI), which gives its own exams.
- Fee: $50 exam fee (nonrefundable, good for one year); the two-year license fee is separate (DLI chart, September 2023: special $20, second and first class $40).
- DLI gives 50 questions for grade C, 60 for grade B and 80 for grade A; our practice exam uses the grade B length of 60.
- DLI's chief boiler inspector prepares the written exams (Rules 5225.0500). The time limit is 2.5 hours and the passing score is 70%.
- DLI does not state on any page we found whether the exam is open or closed book, and it publishes no blueprint, topic weights or sample questions. Our topic split is an estimate.
- Grades are nested: C covers low-pressure boilers (steam 15 psig or less; water 160 psig and 250 F or less), B covers all boilers, and A adds steam engines and turbines. DLI's A-grade exams are longer and include the B content. This practice bank covers the B-grade content.
- A failed exam can be retaken after 30 days (DLI license chart). All but the special license also need a notarized affidavit of operating experience.
Note: DLI publishes no blueprint, weights, sample questions or book policy for boiler exams, so our topic split is an estimate. Questions rest on Minnesota Statutes 326B.95 to 326B.998, Rules 5225 and textbook-standard boiler practice; we did not have the ASME or National Board codes or the Steingress texts on file.
Frequently asked questions
How many questions are on the second class boiler exam?
DLI gives 50 questions for grade C, 60 for B and 80 for A, in 2.5 hours; you need 70%.
What can a second class engineer operate?
Plants up to 100 horsepower, and shift duty in plants up to 500 horsepower (Rules 5225.0550).
What experience do I need?
1 year of operating experience (year = 2,000 hours); grade A also needs 1 year on steam engines or turbines. You submit a notarized affidavit of operating experience.
Free questions with answers
Show all 10 free questions and answers
What is the scope of a second class (Grade B) Minnesota engineer license as to the size of plant the holder may be in charge of?
Answer: Take charge of boilers of not more than 100 horsepower, or act as shift engineer in a plant of not more than 500 horsepower
Statute 326B.978, subd. 13 limits a second class engineer to charge of boilers up to 100 hp or shift-engineer duty in a plant up to 500 hp; in a larger plant the holder may only assist the shift engineer under direct supervision. The 50 hp / 100 hp pair describes the special engineer, and 500 hp in charge is first class.
Reference: Minnesota Statutes, sections 326B.95 to 326B.998, 326B.978, subd. 13
An insurance company completes the inspection of a boiler it insures on March 1. Under Statute 326B.99, subd. 1, by what date must it file the inspection report with the commissioner, and what must the report identify?
Answer: By March 22; the properly licensed engineer in charge, with license grade, class and telephone number
Statute 326B.99, subd. 1 requires the insurer to file the report within 21 days after the inspection (March 1 + 21 days = March 22), on the applicable National Board form, and the report must indicate the properly licensed engineer in charge, including license grade, class and telephone number.
Reference: Minnesota Statutes, sections 326B.95 to 326B.998, 326B.99, subd. 1
A plant has two high pressure steam boilers with 480 and 620 square feet of water heating surface. Under Rules 5225.4100, what is the minimum number of safety valves on each?
Answer: One on the 480 square foot boiler and two or more on the 620 square foot boiler
Rules 5225.4100 requires at least one safety valve on every boiler and two or more on a high pressure boiler with more than 500 square feet of water heating surface. The 480 sq ft boiler needs one; the 620 sq ft boiler needs two or more.
Reference: Minnesota Rules, chapter 5225 (boilers and pressure vessels), 5225.4100
A boiler has an allowable working pressure of 175 psi. What blowoff valve arrangement does Rules 5225.4900 require on the bottom blowoff pipe of a stationary boiler?
Answer: Two slow-opening valves, or one slow-opening valve and a quick-opening valve or cock, with any quick-opening valve nearest the boiler
On stationary boilers over 100 psi, each bottom blowoff pipe needs two slow-opening valves, or a slow-opening valve and a quick-opening valve or cock; the quick-opening valve, if used, is located nearest the boiler. TM 5-650 paragraph 3-16c says to open the quick-opening valve first, then the slow-opening valve.
Reference: Minnesota Rules, chapter 5225 (boilers and pressure vessels), 5225.4900
By weight, how much oxygen does each pound of air contain, and about how many pounds of air are needed to supply one pound of oxygen?
Answer: About 0.233 pound of oxygen per pound of air, so about 4.29 pounds of air per pound of oxygen
TM 5-650 paragraph 1-5b gives air as 76.7 percent nitrogen and 23.3 percent oxygen by weight (79 and 21 percent by volume), so each pound of air holds 0.233 lb of oxygen and 4.29 lb of air is needed per pound of oxygen. The 21 percent figure is by volume, and 79 percent is nitrogen.
Reference: TM 5-650, Central Boiler Plants (U.S. Army), Paragraph 1-5b, Air Requirements
Why is excess air supplied to a burner, and what is the penalty for supplying too much?
Answer: It makes combustion complete in an imperfectly mixed furnace, but too much carries heat up the stack and lowers efficiency
Burning is never perfect, so air beyond the theoretical amount is needed to ensure complete combustion (about 20 percent in a moderately well-controlled burner). The nitrogen and excess oxygen absorb heat and carry it up the stack, so TM 5-650 paragraph 1-12 says to minimize excess air to reduce stack losses.
Reference: TM 5-650, Central Boiler Plants (U.S. Army), Paragraphs 1-5b and 1-12
Because the pH scale is logarithmic, a water sample with a pH of 4 is how many times as acidic as a sample with a pH of 6?
Answer: One hundred times as acidic
TM 5-650 paragraph 4-2f says each pH unit is a factor of ten, so pH 5 is ten times as acidic as pH 6 and pH 4 is a hundred times as acidic as pH 6 (10 x 10). pH 7 is neutral; values below 7 are acidic.
Reference: TM 5-650, Central Boiler Plants (U.S. Army), Paragraph 4-2f, pH
A plant has one conventional boiler with 400 square feet of heating surface and one steam coil type generator with 300 square feet of heating surface, both connected to the same header. For engineer license classification, what is the rated horsepower of the plant?
Answer: 100 horsepower: 40 for the conventional boiler at 10 sq ft per hp plus 60 for the coil generator at 5 sq ft per hp
Statute 326B.978, subd. 17 rates conventional boilers at 10 sq ft per boiler horsepower and steam coil type generators at 5 sq ft per horsepower: 400 / 10 = 40 hp and 300 / 5 = 60 hp. Rules 5225.1000 adds all boilers connected to the header, so the plant is 40 + 60 = 100 hp. Using one factor for both units gives 70 or 140 hp.
Reference: Minnesota Statutes, sections 326B.95 to 326B.998, 326B.978, subd. 17; Minnesota Rules 5225.1000
Why does TM 5-650 recommend that the discharge valve of a large centrifugal pump be closed before the pump is started and opened slowly after?
Answer: It reduces the power required for starting; the pump can run only a few minutes closed without overheating
Paragraph 3-22 says discharge valves of large pumps should be closed before starting to reduce the starting power, then opened slowly. Pumps can be run safely for a few minutes with the discharge closed, but continued operation without circulation overheats the pump, so automatic regulation must never close the discharge off completely.
Reference: TM 5-650, Central Boiler Plants (U.S. Army), Paragraph 3-22, Centrifugal Pumps
On a night shift the operating engineer finds that a boiler's low water cutoff will not trip, and the owner decides to keep the boiler on line until a repair part arrives. Under Rules 5225.1110, subpart 2, what is required while it stays in service?
Answer: Notify the owner and the chief boiler inspector, and keep an engineer monitoring the boiler 24 hours a day until the division clears it
Rules 5225.1110, subp. 2 requires prompt notice to the owner or employer and the chief boiler inspector. If the boiler is not taken out of service at once, an operating engineer must monitor it continuously, 24 hours per day, until the division has sealed the object, verified that the unsafe condition was corrected, or determined that continuous monitoring is no longer required.
Reference: Minnesota Rules, chapter 5225 (boilers and pressure vessels), 5225.1110, subp. 2
Sources
- Minnesota DLI: boiler engineer licenses (opens in a new tab)
- Minnesota Statutes 326B.95 to 326B.998 (boilers and pressure vessels) (opens in a new tab)
- Minnesota Rules chapter 5225 (boilers, pressure vessels and licensing) (opens in a new tab)
- Minnesota DLI: license exam schedule (opens in a new tab)
Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.