Minnesota licensing exam

Minnesota First Class Boiler Engineer Exam: Practice Test & Licensing Guide

The Minnesota DLI first class boiler engineer exam: 100 questions on boiler plant operation, safety and Minnesota boiler law, 2.5 hours, 70% to pass.

Questions
100
Time limit
2.5 hours
Passing score
70%
Books
Not published by Minnesota
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Licensing and Attendance Rules (Minnesota Rules 5225)

A first class engineer, Grade B, is assigned to a high pressure plant whose boilers total 800 boiler horsepower. Under Minn. Stat. 326B.978, what duty is within this license?

Requirements at a glance

AgencyMinnesota Department of Labor and Industry (DLI)
Experience3 years of operating experience (grade A: 2 of them on steam engines or turbines); a notarized affidavit of experience is required
Exam100 or 130 questions by grade (C and B, or A), 2.5 hours, 70% to pass; our practice exam uses 100
Books allowedDLI does not state whether the exam is open or closed book; ask DLI when you schedule
Fees$50 exam fee (nonrefundable, good for one year), plus the two-year license fee (DLI chart, September 2023: special $20, first and second class $40)

Boiler operators with 3 years of operating experience applying for a first class license (up to 500 horsepower, or shift duty in any plant).

How to get licensed, step by step

  1. Apply to DLI

    Send DLI your first class application, the notarized affidavit of operating experience and the $50 exam fee. A first class engineer may operate plants up to 500 horsepower, or take shift duty in plants of any size.

    Minnesota Department of Labor and Industry (DLI) (opens in a new tab)DLI: boiler engineer licenses (opens in a new tab)

  2. Schedule your exam

    After DLI approves your application, you schedule the exam in DLI's iMS system. DLI gives exams at its St. Paul office (Tuesday to Thursday) and at outstate sites including Duluth, Mankato, Rochester and St. Cloud.

    DLI: license exam schedule (opens in a new tab)

  3. Take the exam

    You have 2.5 hours and need 70%. DLI's chief boiler inspector prepares the exam; DLI does not state whether it is open or closed book, so ask DLI before exam day.

    DLI: boiler engineer licenses (opens in a new tab)Minnesota Rules chapter 5225 (boilers) (opens in a new tab)Minnesota Statutes 326B.95 to 326B.998 (boilers) (opens in a new tab)

  4. Results and retakes

    DLI mails results in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.

    DLI: license exam schedule (opens in a new tab)

How to prepare

  • The first class exam is the longest of the three; expect more boiler plant operation, auxiliary equipment, water treatment and law questions than the second class exam.
  • Every DLI exam is open book, but with DLI-supplied references only: a code book without tabs, the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, so practice finding answers fast rather than relying on tabs.
  • DLI publishes no topic weights, so our topic split is an estimate. Several versions of each exam are in use, and some questions ask for more than one answer or the choice that does not apply.
  • DLI publishes no blueprint, sample questions or book policy for boiler exams, so our topic split is an estimate. Questions rest on Minnesota Statutes 326B.95 to 326B.998, Rules 5225 and textbook-standard boiler practice.
  • DLI's listed study books are Low Pressure Boilers (Steingress), High Pressure Boilers (Steingress and Frost) and Stationary Engineering. Grade A exams are longer and include the grade B content, so this bank covers grades C and B.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

  • Minnesota Rules chapter 5225 and Statutes 326B.95 to 326B.998 (boilers and pressure vessels)Essential

    The licensing, operation, attendance and safety rules DLI's chief boiler inspector tests. DLI does not state whether the exam is open book.

    Read free: Minnesota Rules 5225 (opens in a new tab)

Official reference list (as published by the testing agency)
  • Minnesota Statutes 326B.95 to 326B.998 and Minnesota Rules chapter 5225 (DLI's Second Class - Chief Statutes and Rules study document)
  • DLI's listed study books: Low Pressure Boilers (Steingress), High Pressure Boilers (Steingress and Frost) and Stationary Engineering (Steingress, Frost and Walker); the special exam also lists Safe Boiler Operation Fundamentals (ATP)
  • ASME Boiler and Pressure Vessel Code (Sections I, IV, VI and VII, per Rules 5225.0050) and the National Board Inspection Code

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Boiler Construction, Types and Fittings12
Safety Valves, Water Gauges and Controls12
Operation, Firing and Combustion14
Feedwater, Water Treatment and Blowdown10
Heating Surface, Capacity and Calculations10
Pumps, Piping and Auxiliary Equipment10
Steam Plant Operation and Efficiency8
Boiler Safety, Maintenance and Repair8
Inspection and Registration (Minnesota Statutes 326B.95 to 326B.998)8
Licensing and Attendance Rules (Minnesota Rules 5225)8

Exam day details

  • Administered by the Minnesota Department of Labor and Industry (DLI), which gives its own exams.
  • Fee: $50 exam fee (nonrefundable, good for one year); the two-year license fee is separate (DLI chart, September 2023: special $20, second and first class $40).
  • DLI gives 100 questions for grade C and B and 130 for grade A; our practice exam uses 100.
  • DLI's chief boiler inspector prepares the written exams (Rules 5225.0500). The time limit is 2.5 hours and the passing score is 70%.
  • DLI does not state on any page we found whether the exam is open or closed book, and it publishes no blueprint, topic weights or sample questions. Our topic split is an estimate.
  • Grades are nested: C covers low-pressure boilers (steam 15 psig or less; water 160 psig and 250 F or less), B covers all boilers, and A adds steam engines and turbines. DLI's A-grade exams are longer and include the B content. This practice bank covers the B-grade content.
  • A failed exam can be retaken after 30 days (DLI license chart). All but the special license also need a notarized affidavit of operating experience.

Note: DLI publishes no blueprint, weights, sample questions or book policy for boiler exams, so our topic split is an estimate. Questions rest on Minnesota Statutes 326B.95 to 326B.998, Rules 5225 and textbook-standard boiler practice; we did not have the ASME or National Board codes or the Steingress texts on file.

Frequently asked questions

How many questions are on the first class boiler exam?

100 questions for grade C and B and 130 for grade A, in 2.5 hours; you need 70% to pass.

What can a first class engineer operate?

Plants up to 500 horsepower, and shift duty in plants of any size (Rules 5225.0550).

What experience do I need?

3 years of operating experience (grade A needs 2 of them on engines or turbines), documented in a notarized affidavit.

Free questions with answers

Show all 10 free questions and answers
  1. A first class engineer, Grade B, is assigned to a high pressure plant whose boilers total 800 boiler horsepower. Under Minn. Stat. 326B.978, what duty is within this license?

    Answer: Serving as a shift engineer, because a first class license covers shift duty in a plant of unlimited horsepower

    A first class engineer may take charge of boilers of not more than 500 horsepower or operate as a shift engineer in a plant of unlimited horsepower (326B.978, subd. 9 and 10). Taking charge of an 800 hp plant is a chief engineer duty; apprentice work is the special engineer's limit.

    Reference: Minnesota Statutes, chapter 326B, 326B.978, subd. 9-10

  2. A mechanical contractor finishes installing a new boiler. Who must make sure the department inspects it before it is placed in operation, and who is responsible for the fee of that first inspection?

    Answer: The installer ensures the department inspects it, and the installer pays the initial inspection fee

    Anyone who installs a boiler must ensure the department inspects it after installation is complete and before it is placed in operation, and the fees for that initial inspection are the installer's responsibility. Later annual fees belong to the owner (326B.958, subd. 1(b) and (e)).

    Reference: Minnesota Statutes, chapter 326B, 326B.958, subd. 1(b)

  3. Which piping arrangement for a required safety valve violates Minn. Rules 5225.4100?

    Answer: A stop valve installed in the discharge pipe between the safety valve and the point of discharge

    No valve of any description may be placed between the safety valve and the boiler or on the discharge pipe between the valve and the point of discharge. The valve must be independently connected, close to the boiler, upright, and discharge pipe may not be reduced in size (5225.4100).

    Reference: Minnesota Rules, chapter 5225 (Boilers and Boats), 5225.4100

  4. How does Minn. Rules 5225.0050 define a boiler?

    Answer: A vessel in which steam, other vapor, hot water or other hot liquid is generated for use external to itself

    The rule defines a boiler as a vessel in which steam or other vapor, hot water or other hot liquid is generated for use external to itself. A boiler plant means all boilers on a common header with their appurtenances (5225.0050, subp. 4 and 5).

    Reference: Minnesota Rules, chapter 5225 (Boilers and Boats), 5225.0050, subp. 4

  5. Calculation: Three boilers connect to one common steam header. Boilers 1 and 2 each have 3,600 sq ft of heating surface and are in service; boiler 3 has 3,000 sq ft and is idle on standby. For engineer license classification (10 sq ft = 1 boiler horsepower, Minn. Stat. 326B.978, subd. 17), what is the plant rating?

    Answer: 1,020 horsepower, because all boilers on the header count whether or not they are in use

    Boiler hp = heating surface / 10: 360 + 360 + 300 = 1,020 hp. Rule 5225.1000 requires summing every boiler connected to the header whether all are in use or not. A plant over 500 hp requires a chief engineer designated (5225.0410) and constant attendance.

    Reference: Minnesota Rules, chapter 5225 (Boilers and Boats), 5225.1000 and 326B.978, subd. 17

  6. The waterside surfaces of a boiler show general etching with some pitting. Which condition does the Navy text associate with this, and which condition causes furrowing and grooving in fire-row tubes?

    Answer: Etching means low alkalinity (acid corrosion); furrowing and grooving mean excess alkalinity forming strong caustic films

    Low alkalinity removes the protective hydrogen layer and gives general etching, sometimes with localized pitting. Too-high alkalinity concentrates strong caustic in the film at high-evaporation tubes and dissolves the protective oxide, giving furrowing and grooving.

    Reference: U.S. Navy, Boilerman 1 and C, NAVPERS 10536-B (1956), Chapter 6, Boiler Water Treatment and Feed Systems: Effect of Excessive Alkalinity

  7. Air is about 76.85 percent nitrogen by weight. What role does the nitrogen in combustion air play, according to the Navy text?

    Answer: None; it is a source of direct loss because it absorbs heat in the furnace and carries it up the stack

    Nitrogen serves no useful purpose in combustion; it absorbs heat passing through the furnace and carries part of it out through the stack. For every pound of oxygen supplied in air (4.320 lb of air) there are 3.32 lb of nitrogen.

    Reference: U.S. Navy, Boilerman 1 and C, NAVPERS 10536-B (1956), Chapter 8, Boiler Efficiency: Combustion of Fuel; Air and Combustion

  8. What must the feed pipe to a boiler have, according to Minn. Rules 5225.5000?

    Answer: A check valve near the boiler and a valve or cock between the check valve and the boiler

    The feed pipe needs a check valve near the boiler and a valve or cock between the check valve and the boiler. With two or more boilers fed from a common source, each branch needs a globe or regulating valve between the check valve and the source, and globe valves on feed piping have the inlet under the disk (5225.5000).

    Reference: Minnesota Rules, chapter 5225 (Boilers and Boats), 5225.5000

  9. According to the Navy text, which is the greatest of the heat losses in a boiler?

    Answer: Heat carried away in the smoke pipe (stack) gases

    The loss from heat carried away in the stack gases is the greatest. Other losses are moisture in the fuel, moisture formed by burning hydrogen, moisture in the air, incomplete combustion of carbon, and unburned hydrocarbons, radiation and unaccounted losses.

    Reference: U.S. Navy, Boilerman 1 and C, NAVPERS 10536-B (1956), Chapter 8, Boiler Efficiency: Combustion and Heat Losses

  10. Which firm may perform welded repairs or alterations on a boiler subject to inspection in Minnesota, per Minn. Rules 5225.2600?

    Answer: A firm holding the National Board repair (R) stamp and a current Repair Certificate of Authorization

    The R stamp and a current certificate of authorization are required for any welded or riveted repairs or alterations. The repair firm must also arrange inspection, documentation and acceptance by an authorized inspection agency and complete form R-1 for non-routine repairs (5225.2600, subp. 2-3).

    Reference: Minnesota Rules, chapter 5225 (Boilers and Boats), 5225.2600, subp. 2-3

Sources

Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.