Requirements at a glance
| Agency | Michigan LARA, Bureau of Construction Codes; exam by PSI |
|---|---|
| Exam | 32 questions, 1 hour, 75% to pass |
| Books allowed | NEC (items based on 2023; factory markings and tabs only, no NEC Handbook), Michigan Electrical Code Rules Part 8, 2016 PA 407 and 1972 PA 230 |
| Fees | $100 to PSI per attempt, plus LARA application and license fees |
| Experience and education | Age 18 or older, at least 4,000 hours over at least 2 years in electric sign work verified by a licensed employer, and an approved electric sign course (MCL 339.5729) |
| Attempts | 2 attempts within 1 year, then reapply with the State |
| Who does not need it | A licensed master electrician, journeyman electrician or apprentice electrician may do sign work without a sign specialist license (MCL 339.5729) |
Sign installers and technicians applying to LARA for a Michigan sign specialist license to install, connect, maintain or repair electric signs and related wiring.
Official links
How to get licensed, step by step
Apply to LARA
Submit your sign specialist application with your experience documentation. LARA approves you before you can pay for the exam.
Michigan LARA: Bureau of Construction Codes (opens in a new tab)Michigan Legislature: Skilled Trades Regulation Act, 2016 PA 407 (opens in a new tab)
Schedule with PSI
Follow your approval letter to pay and book. You get 2 attempts within 1 year at $100 each.
Schedule with PSI (Michigan electrical) (opens in a new tab)PSI: Michigan electrical candidate bulletin (opens in a new tab)
Prepare your books
Bring a bound NEC with factory markings and tabs only, plus bound copies of Part 8, PA 407 and PA 230. Printed BCC documents need 3 staples and no tabs.
PSI: Michigan electrical candidate bulletin (opens in a new tab)
How to prepare
- Michigan adopts the 2023 NEC with Michigan Part 8 amendments (effective 3/12/2024). Exam items are based on the 2023 edition, so tab your book for 2023 articles.
- Review NEC Article 600 for electric signs and outline lighting along with grounding and branch circuit basics.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2023 NEC and Michigan Part 8. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 editionEssential
Exam items are based on the 2023 NEC; Michigan adopts it with Part 8 amendments. Factory markings and tabs only; the NEC Handbook is not allowed.
Michigan Electrical Code Rules, Part 8Essential
Free from LARA. The Michigan amendments to the NEC; named in the electrical bulletin and allowed in the room (bound, 3 staples, no tabs).
LARA: Michigan code books and adopted codes (opens in a new tab)
Skilled Trades Regulation Act, 2016 PA 407
Free online from the Michigan Legislature. The licensing law for plumbers and mechanical contractors; shown on screen in the plumbing exams.
Stille-DeRossett-Hale Single State Construction Code Act, 1972 PA 230
Free online from the Michigan Legislature. Permits, inspections and code enforcement; law questions draw on it.
Official reference list (as published by the testing agency)
- National Electrical Code (NEC): exam items are based on the 2023 edition; other editions may be used. Factory markings, highlights and factory tabs only. The NEC Handbook is not allowed.
- Michigan Electrical Code Rules, Part 8 (2023 Part 8 rules adopt the 2023 NEC with Michigan amendments)
- Skilled Trades Regulation Act, 2016 PA 407
- State Construction Code Act, 1972 PA 230
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Grounding and Bonding | 3 | |
| Overcurrent Protection | 2 | |
| Wiring Methods and Installations | 6 | |
| Boxes and Cabinets | 2 | |
| Special Occupancies | 2 | |
| Load Calculations | 2 | |
| Lighting | 2 | |
| Box and Raceway Fill | 2 | |
| Power Limited Circuits | 2 | |
| General Electrical Trade Knowledge | 2 | |
| Electrical Theory | 2 | |
| Skilled Trades Regulation Act, Part 8 Rules and PA 230 (electric signs) | 5 |
Exam day details
- Administered by PSI Services for the Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes.
- Fee: $100 to PSI per attempt, non-refundable and valid for one year. LARA application and license fees are separate.
- 32 questions in 1 hour; 75% to pass.
- The bulletin lists topics but no per-topic weights. Our topic weights are an estimate that adds up to 32.
- Sign specialist candidates are limited to 2 attempts within 1 year. After that you must reapply with the State to become eligible again.
- The license also needs age 18, 4,000 hours of experience over at least 2 years and an approved electric sign course (MCL 339.5729). A licensed master or journeyman electrician or apprentice electrician does not need a sign specialist license.
- Reference material must be bound. Material printed from the BCC website must be stapled in 3 places on the left edge in separate documents, with no highlighting, marking or tabs. You may bring a straight edge rule without calculations.
- The Department (LARA BCC) must approve your application first. It sends a notification letter with instructions to pay and schedule with PSI; only the State decides eligibility.
- PSI may add up to ten unscored experimental questions; they are not counted in your score and don't take time from the exam.
- Cancel or reschedule at least 2 days before the appointment to keep your fee; late cancellations and no-shows forfeit it.
Frequently asked questions
What's on the Michigan sign specialist exam?
32 questions on grounding and bonding, overcurrent protection, wiring methods, boxes and cabinets, special occupancies, load calculations, lighting, box and raceway fill, power limited circuits, general electrical trade knowledge and electrical theory, plus the Skilled Trades Regulation Act rules for electric signs and the Part 8 rules.
What do I need before I can sit for it?
Age 18, at least 4,000 hours of sign experience over at least 2 years verified by a licensed contractor, and a board-approved electric sign course (MCL 339.5729).
How many attempts do I get?
Two within 1 year. After that you reapply with the State.
Free questions with answers
Show all 10 free questions and answers
Listed liquidtight flexible metal conduit encloses the secondary conductor between a neon transformer and the tubing, and is to serve as the bonding means. Up to what total accumulative length of the conduit in the secondary circuit is this permitted?
Answer: 100 ft
600.7(B)(4) allows listed flexible metal conduit or listed liquidtight flexible metal conduit enclosing a neon secondary conductor to be used as the bonding means if the total accumulative length of the conduit in the secondary circuit does not exceed 100 ft (30 m). Over that length a separate bonding conductor is needed.
Reference: NEC 2023 (NFPA 70), 600.7(B)(4)
Three LED sign sections on the same 120-volt sign circuit draw a total of 18 amperes. Which statement is correct?
Answer: They cannot share one circuit, because 18 A x 1.25 = 22.5 A exceeds the 20 A maximum for non-neon signs
Sign circuits are continuous loads (600.5(C)), so the circuit must carry 18 A x 1.25 = 22.5 A. But 600.5(C)(2) caps branch circuits for signs other than neon at 20 A, so no larger circuit is allowed; the load must be divided onto two or more circuits.
Reference: NEC 2023 (NFPA 70), 600.5(C) and 600.5(C)(2)
Which sign installation is NOT required to have the disconnecting means described in 600.6?
Answer: A cord-connected sign that has an attachment plug
600.6 requires an externally operable switch or circuit breaker for each sign, but Exception No. 2 says no disconnect is required for cord-connected signs with an attachment plug, because the plug itself disconnects the sign. Hard-wired signs, whatever the mounting, need the disconnect.
Reference: NEC 2023 (NFPA 70), 600.6, Exception No. 2
What is the minimum thickness of sheet steel that may be used for the enclosure of a sign or outline lighting system?
Answer: 0.016 in. (0.41 mm)
600.8(C) sets the minimum thickness at 0.41 mm (0.016 in.) for sheet steel and 0.51 mm (0.020 in.) for sheet copper or aluminum. The 0.020 in. choice is the nonferrous figure and is the usual trap.
Reference: NEC 2023 (NFPA 70), 600.8(C)
A portable sign in a dry location is supplied by a flexible cord. What is the maximum cord length permitted?
Answer: 15 ft
600.10(D) says cords for portable or mobile signs in dry locations must be SP-2, SPE-2, SPT-2 or heavier and may not exceed 4.5 m (15 ft) in length.
Reference: NEC 2023 (NFPA 70), 600.10(D)(2)
A building has six entrances: four tenant entrances accessible to the public, one loading-dock door and one service corridor door used only by employees. What is the minimum sign outlet load that must be calculated?
Answer: 4,800 VA
600.5(A) requires a sign outlet at each tenant entrance, but Exception No. 1 excuses entrances for deliveries and service corridors used only by service personnel or employees. Four required circuits x 1,200 VA (220.14(F)) = 4,800 VA. Counting all six entrances gives 7,200 VA.
Reference: NEC 2023 (NFPA 70), 220.14(F) and 600.5(A), Exception No. 1
Using Chapter 9, Tables 1, 4 and 5 (10 AWG THHN is 0.0211 sq in.; 3/4-inch EMT 40 percent area is 0.213 sq in.), what is the maximum number of 10 AWG THHN conductors in 3/4-inch EMT?
Answer: 10
More than two conductors allow 40 percent fill, so the available area is 0.213 sq in. 0.213 / 0.0211 = 10.09, rounded down to 10 conductors (10 x 0.0211 = 0.211 sq in.). Eleven would be 0.232 sq in., over the limit; 16 is the count for 12 AWG.
Reference: NEC 2023 (NFPA 70), Chapter 9, Tables 1, 4 and 5
Class 2 cable for sign wiring is run exposed on a ceiling surface. What is the maximum interval between supports?
Answer: 6 ft
600.33(B)(1) requires cables and conductors installed exposed on ceilings and sidewalls to be supported by the building structure so that they are not damaged by normal use, and to be supported and secured at intervals not exceeding 1.8 m (6 ft). The 3 ft interval applies to PV powered sign wiring in 600.34(B)(3).
Reference: NEC 2023 (NFPA 70), 600.33(B)(1)
A retrofit kit is installed in an existing sign. Which statement about the parts the kit does not replace is correct?
Answer: They must be inspected, and any damaged part must be replaced or repaired to keep the sign's location rating
600.35(B) requires all parts not replaced by a retrofit kit to be inspected for damage; any part found damaged, or damaged during conversion, must be replaced or repaired to maintain the sign's dry, damp or wet location rating. 600.35(A) also requires the kit to be listed and labeled with installation instructions.
Reference: NEC 2023 (NFPA 70), 600.35(B)
Under MCL 339.5729, which set of qualifications must an applicant meet for a sign specialist's license?
Answer: At least 18 years old, with 4,000 hours of sign-related experience over at least 2 years, and an approved sign course
MCL 339.5729(1) requires an applicant to be at least 18, meet article 2, have at least 4,000 hours of experience over at least 2 years in the manufacture, installation, maintenance, connection or repair of electric signs and related wiring (verified by a licensed contractor employer), and complete an approved course. The 8,000 and 12,000 hour figures belong to the journeyman and master licenses.
Reference: 2016 PA 407 (Skilled Trades Regulation Act), MCL 339.5729, MCL 339.5729(1)(a), (c) and (d)
Sources
- PSI: Michigan Electrical Examinations Candidate Information Bulletin (effective 8/20/2026) (opens in a new tab)
- Schedule with PSI (Michigan electrical) (opens in a new tab)
- Michigan Legislature: Skilled Trades Regulation Act, 2016 PA 407 (opens in a new tab)
- Michigan LARA: Bureau of Construction Codes (opens in a new tab)
- LARA: PSI examinations for the Bureau of Construction Codes (opens in a new tab)
- LARA: Michigan code books and adopted codes (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.