Requirements at a glance
| Agency | Michigan LARA, Bureau of Construction Codes; exam by PSI |
|---|---|
| Exam | 160 questions (50 Business and Law, 110 Practice/Trade), 4 hours, raw score 116 to pass |
| Books allowed | None: closed book |
| Fees | $117 to PSI per attempt, plus LARA application and license fees |
| Experience and education | No experience requirement. First-time applicants need 60 hours of approved prelicensure courses, at least 6 hours each in business management, design and building science, contracts, marketing, project management, the Michigan Residential Code and MIOSHA safety (MCL 339.2404b) |
Anyone applying to LARA for a Michigan Residential Builder license to build or remodel homes as a contractor.
Official links
How to get licensed, step by step
Apply to LARA
Send your residential builder application and fees to the Bureau of Construction Codes. Only the State decides your eligibility.
Michigan LARA: Bureau of Construction Codes (opens in a new tab)LARA: PSI examinations for the Bureau of Construction Codes (opens in a new tab)
Get your PSI notice
Once approved you get a letter with instructions to pay and schedule with PSI. You must pass within one year of approval or reapply and forfeit fees.
Schedule with PSI (Michigan builders) (opens in a new tab)PSI: Michigan residential builder candidate bulletin (opens in a new tab)
Pass the combined exam
One sitting covers Business and Law and Practice/Trade. It is closed book, so learn the licensing, contract, insurance and residential code content.
PSI: Michigan residential builder candidate bulletin (opens in a new tab)
How to prepare
- Practice/Trade is 110 of 160 questions: carpentry (16), plans, specifications and estimating (14), footings and foundation walls (11) and safety including MIOSHA (10) lead.
- Business and Law is 50 questions: regulatory and statutory requirements (13) and insurance, bonds and liens (11) are the biggest sections.
- The exam is closed book. Memorize span, fastener and framing basics from the Michigan Residential Code and the licensing rules instead of planning to look them up.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
2015 Michigan Residential CodeEssential
Listed in the HVAC Equipment bulletin and as a study reference for the residential builder exam.
Occupational Code, 1980 PA 299, Articles 1 to 6 and Article 24 (residential builders)
Free online from the Michigan Legislature. The builder licensing law named in the PSI bulletin for the Business and Law section.
Michigan Legislature: Act 299 of 1980, Article 24 (opens in a new tab)
Stille-DeRossett-Hale Single State Construction Code Act, 1972 PA 230
Free online from the Michigan Legislature. Permits, inspections and code enforcement; law questions draw on it.
Official reference list (as published by the testing agency)
- Closed book: no reference materials are allowed in the exam center
- Study references named in the bulletin: Michigan Residential Code (2015), the State Construction Code Act (1972 PA 230) and MIOSHA standards
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Regulatory and Statutory Requirements | 13 | |
| Types of Business Organization | 4 | |
| Estimating | 1 | |
| Contracts | 7 | |
| Project Management and Administration | 6 | |
| Accounting and Finance | 6 | |
| Insurance, Bonds and Liens | 11 | |
| Personnel | 2 | |
| Site Engineering | 5 | |
| Plans, Specifications and Estimating | 14 | |
| Excavation/Sitework | 9 | |
| Footings and Foundation Walls | 11 | |
| Concrete | 7 | |
| Carpentry | 16 | |
| Masonry | 9 | |
| Roofing | 7 | |
| Insulation | 5 | |
| Ventilation | 2 | |
| Windows, Doors and Skylights | 5 | |
| Siding Installation | 3 | |
| Interior and Exterior Finishes | 5 | |
| Specialties | 2 | |
| Safety and Employee Protection Including MIOSHA | 10 |
Exam day details
- Administered by PSI Services for the Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes.
- Fee: $117 to PSI for the combined Business and Law plus Practice/Trade exam, first attempt or retest; valid for one year. LARA application and license fees are separate.
- 160 questions in 4 hours: 50 on Business and Law and 110 on Practice/Trade. You need a raw score of 116 correct (72.5%) to pass.
- You must pass the combined exam within one year of LARA approving your application, or reapply and forfeit fees.
- The Department (LARA BCC) must approve your application first. It sends a notification letter with instructions to pay and schedule with PSI; only the State decides eligibility.
- PSI may add up to ten unscored experimental questions; they are not counted in your score and don't take time from the exam.
- Cancel or reschedule at least 2 days before the appointment to keep your fee; late cancellations and no-shows forfeit it.
Frequently asked questions
What's on the Michigan residential builder exam?
160 questions: 50 Business and Law (regulatory and statutory requirements 13, insurance, bonds and liens 11, contracts 7, project management 6, accounting and finance 6) and 110 Practice/Trade (carpentry 16, plans, specifications and estimating 14, footings and foundation walls 11, safety including MIOSHA 10, and more).
Is the Michigan residential builder exam open book?
No. It is closed book; PSI allows no reference materials in the exam center.
What score do I need to pass?
A raw score of 116 out of 160 questions, about 72.5%.
Free questions with answers
Show all 10 free questions and answers
A candidate passes the Business and Law questions but fails the combined builder exam overall. Under the current PSI rules, what must the candidate do to retry?
Answer: Register again and take the full combined exam, because the parts can no longer be taken separately
Since 11/14/19 the Business and Law section is combined with the Practice/Trade section. First-time and repeat candidates must take the combined exam each time they register.
Reference: PSI Candidate Information Bulletin: Michigan Residential Builder, M&A Contractor and Salesperson (updated 8/3/2026), Examination Parts
In a cost-plus-fee contract, how is the contractor paid?
Answer: For the actual documented cost of the work, plus an agreed fee
Under cost-plus, the owner pays documented job costs plus a fee (a fixed amount or a percentage), so cost risk is on the owner and good records are required. Fixed price is lump sum and per-unit pricing is a unit-price contract.
Reference: General practice: construction contracts, Contract types: cost plus
In a surety bond arrangement, which party is the obligee?
Answer: The owner, who is protected by the bond
The principal is the contractor who is bonded, the surety is the company that guarantees performance, and the obligee is the party protected, usually the owner. Unlike insurance, the principal must repay the surety for claims paid.
Reference: General practice: construction insurance and bonding, Bonds: parties
On a floor plan drawn at 1/4 inch = 1 foot, a room measures 3 1/2 inches by 3 inches. What are the actual room dimensions?
Answer: 14 ft by 12 ft
At 1/4 inch per foot, each inch on the drawing is 4 ft: 3.5 in x 4 = 14 ft and 3 in x 4 = 12 ft. The 7 by 6 answer comes from reading the plan at 1/2 inch = 1 foot (2 ft per inch), and 28 by 24 from reading it at 1/8 inch = 1 foot (8 ft per inch).
Reference: General practice: reading construction drawings and estimating, Scales and dimensions
Under Part 91 of Michigan's environmental law, when is a soil erosion and sedimentation control (SESC) permit generally required?
Answer: For earth changes that disturb one or more acres, or are within 500 feet of a lake or stream
MCL 324.9112(1) bars an earth change governed by Part 91 except as authorized by a permit from the county or municipal enforcing agency, and Admin. Code R 323.1704 sets the trigger: an earth change that disturbs 1 or more acres, or is within 500 feet of the water's edge of a lake or stream, needs a permit unless exempted in R 323.1705. A garden or other small earth change far from water does not meet either trigger, and the rule has no 50-acre or seasonal threshold.
Reference: Michigan Admin. Code R 323.1704 (Part 91 SESC rules under 1994 PA 451), R 323.1704; MCL 324.9112(1)
What is the minimum footing depth below finished grade for a Michigan home, where the frost depth in the residential code is 42 inches?
Answer: 42 inches
Michigan amends R403.1.4 so that all exterior footings and foundation systems extend 42 inches below actual grade, matching the 42-inch frost line in Table R301.2(1). The building official may modify the depth for conditions such as soil type or freezing degree days, and frost-protected shallow foundations (R403.3) are an alternative. 12 inches is the unamended IRC minimum, not Michigan rule.
Reference: 2015 Michigan Residential Code, R403.1.4 (Michigan amendment) and Table R301.2(1)
What does a slump test measure?
Answer: The consistency or workability of fresh concrete
The slump cone test (ASTM C143) measures how far a molded cone of fresh concrete settles. Strength is determined by compression tests of cylinders, and air by a separate air meter.
Reference: General practice: concrete construction (ACI 332 / portland cement concrete), Testing (slump, strength)
Under the 2015 IRC, what is the minimum uniformly distributed live load for habitable rooms other than sleeping rooms, and for sleeping rooms?
Answer: 40 psf for habitable rooms other than sleeping rooms, 30 psf for sleeping rooms
Table R301.5 lists 40 psf for all habitable rooms except sleeping rooms, which are 30 psf, 40 psf for decks, and 20 psf for uninhabitable attics with storage. These are live loads, and dead loads are the weight of the structure itself.
Reference: 2015 Michigan Residential Code, Table R301.5
What is the maximum spacing for corrugated metal ties that anchor a brick veneer to a wood-framed wall, according to the 2015 IRC?
Answer: 32 inches horizontally and 24 inches vertically, with one tie for each 2.67 sq ft of wall
R703.8.4.1 requires each veneer tie to support not more than 2.67 square feet of wall, spaced not more than 32 inches on center horizontally and 24 inches vertically (32 x 24 = 768 sq in = 5.33 sq ft, so ties are usually staggered or set closer to stay within 2.67 sq ft). Corrugated sheet metal ties must be at least No. 22 gage by 7/8 inch.
Reference: 2015 Michigan Residential Code, R703.8.4.1
How far must a portable ladder extend above the landing it serves, when used to get on a roof?
Answer: At least 3 feet above the landing, and tied off or held
Part 11, Rule 1124(5) requires the side rails of a portable ladder used to reach an upper landing to extend at least 3 feet above that landing; where that is not possible, the ladder must be secured at the top and a grab device provided. The extension gives the climber something to hold while stepping on and off.
Reference: MIOSHA Construction Safety Standard Part 11, Fixed and Portable Ladders, R 408.41124(5)
Sources
- PSI: Michigan Residential Builder, M&A Contractor and Salesperson Candidate Information Bulletin (updated 8/3/2026) (opens in a new tab)
- Michigan LARA: Bureau of Construction Codes (opens in a new tab)
- LARA: PSI examinations for the Bureau of Construction Codes (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.