Maryland licensing exam

Maryland Master Natural Gas Fitter Exam: Practice Test & Licensing Guide

The PSI exam for the Maryland master natural gas fitter license: 40 questions on gas piping, pipe sizing math, chimneys and flues, combustion and appliances. Open book, 70% to pass.

Questions
40
Time limit
90 min
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Pipe Sizing/Math

A new house line serves a 100,000 Btu/h furnace, a 40,000 Btu/h water heater, a 65,000 Btu/h range and a 25,000 Btu/h dryer. Assume natural gas at 1,000 Btu per cubic foot and no diversity. What total demand, in cubic feet per hour, is used to size the piping?

Requirements at a glance

AgencyMaryland State Board of Plumbing; exam by PSI
ExperienceA current Maryland HVACR master or master restricted heating license in good standing, plus 2 years as a licensed journeyman natural gas fitter under a licensed master plumber, a licensed master gas fitter, or a qualifying HVACR master or master restricted heating license holder.
Exam40 questions, 90 minutes, 70% to pass
Books allowed2018 IFGC, Mathematics for Plumbers and Pipefitters (8th edition) and Frankland's Pipe Fitters and Pipe Welders Handbook (1984)
Fees$65 to PSI, plus Board application and license fees

Gas fitters applying for a Maryland master natural gas fitter license from the State Board of Plumbing. You need a current Maryland HVACR master or master restricted heating license and 2 years as a licensed journeyman natural gas fitter.

How to get licensed, step by step

  1. Confirm you qualify

    A current Maryland HVACR master or master restricted heating license in good standing, plus 2 years as a licensed journeyman natural gas fitter under a licensed master plumber, a licensed master gas fitter, or a qualifying HVACR master or master restricted heating license holder.

    Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)Maryland Code (General Assembly) (opens in a new tab)

  2. Apply through PSI

    Submit the exam application online at the PSI site below (mailed or faxed applications are returned). PSI and the Board review your documents, then email you how to pay and schedule.

    Schedule with PSI (plumbers and gas fitters) (opens in a new tab)

  3. Pass the open-book exam

    Exam fees are non-refundable and non-transferable. The bulletin lists no waiting period between attempts; confirm with PSI.

    Schedule with PSI (plumbers and gas fitters) (opens in a new tab)

  4. Apply for the license

    After you pass, the Board sends you the license application. Pay the license fee and file any required insurance.

    Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)

How to prepare

  • Tab your books before exam day: permanent plastic tabs (Avery Swift or Redi-Tag), highlighting and underlining are allowed; Post-It flags and writing in the book are not.
  • Only 40 questions, so every section counts: general piping (15) and pipe sizing math (10) are 25 of them. Tab the IFGC pipe sizing tables and practice sizing by hand.
  • Chimney and flues, combustion and appliances are 5 questions each; tab IFGC Chapters 3, 5 and 6 and the appliance chapters.
  • The Lee Smith math book or Frankland's handbook can serve for the math items; know where the offset and volume formulas are.
  • The bulletin lists the 2018 IFGC while the state code is now the 2024 edition; check the current bulletin before buying books.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IFGC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2018 International Fuel Gas Code (IFGC)Essential

    Allowed in the exam room. Gas appliances and piping are 40 of the 100 plumber questions.

    ICC store: 2018 IFGC (opens in a new tab)

  • Mathematics for Plumbers and Pipefitters, Lee Smith, 8th Edition (2013)

    Allowed in the exam room. Offsets, pipe sizing and volume math for the 7 math questions.

Official reference list (as published by the testing agency)
  • International Fuel Gas Code (IFGC), 2018 edition (allowed in the exam room)
  • Mathematics for Plumbers and Pipefitters, Lee Smith, 8th Edition, 2013 (allowed in the exam room)
  • The Pipe Fitters and Pipe Welders Handbook, Revised Edition, Thomas Frankland, 1984 (allowed in the exam room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Piping15
Pipe Sizing/Math10
Chimney and Flues5
Combustion5
Appliances5

Exam day details

  • Administered by PSI Services for the Maryland State Board of Plumbing.
  • Fee: $65 to PSI per exam. Board application and license fees are separate.
  • 40 questions in 90 minutes; 28 correct (70%) to pass.
  • Eligibility: a current Maryland HVACR master or master restricted heating license in good standing, plus 2 years as a licensed journeyman natural gas fitter under a licensed master plumber, a licensed master gas fitter, or a qualifying HVACR master or master restricted heating license holder.
  • Open book: you may bring only the listed references (none are provided), which you may index, highlight and underline but not write in. Study guides are not allowed.
  • The Pipe Fitters and Pipe Welders Handbook (Frankland, 1984) or the Lee Smith math book can be used as the general reference for math items.
  • Apply to PSI online first; once approved you receive an email on how to pay and schedule. Upload your experience documentation with the application.
  • If a code and a trade reference disagree, the code, law or regulation overrides the other sources. State-specific law overrides national law.

Frequently asked questions

What's on the Maryland master natural gas fitter exam?

40 questions: general piping 15, pipe sizing and math 10, chimney and flues 5, combustion 5 and appliances 5.

Which books can I bring?

The 2018 IFGC, Mathematics for Plumbers and Pipefitters (8th edition) and The Pipe Fitters and Pipe Welders Handbook (Frankland, 1984). Nothing else is allowed in the room.

Is this the same as the master plumber/gas fitter exam?

No. The master plumber/gas fitter exam is a 100-question plumbing and gas exam. The natural gas fitter exam is 40 questions on gas work only.

Free questions with answers

Show all 10 free questions and answers
  1. A new house line serves a 100,000 Btu/h furnace, a 40,000 Btu/h water heater, a 65,000 Btu/h range and a 25,000 Btu/h dryer. Assume natural gas at 1,000 Btu per cubic foot and no diversity. What total demand, in cubic feet per hour, is used to size the piping?

    Answer: 230 cfh

    Section 402.2 bases sizing on the sum of the maximum input of every appliance served, assuming all can run at once. 100,000 + 40,000 + 65,000 + 25,000 = 230,000 Btu/h; 230,000 / 1,000 Btu per cu ft = 230 cfh. 205 leaves out the dryer, 165 leaves out the water heater, and 2,300 is a misplaced decimal.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 402.2 Maximum Gas Demand

  2. A natural gas system runs at less than 2 psi with a 0.5 in. w.c. design pressure drop, Schedule 40 steel pipe, and the longest run from the meter to the farthest outlet is 50 ft. The trunk line carries 300 cfh. Using the longest length method, what is the smallest trunk size from Table 402.4(2)?

    Answer: 1-1/4 inch

    Section 402.4.1 sizes every section with the longest length and that section's load. In the 50-ft row of Table 402.4(2), 1 inch carries 284 cfh, which is less than 300, and 1-1/4 inch carries 583 cfh. So 1-1/4 inch is the smallest size that works; 3/4 inch carries only 151 cfh and 1-1/2 inch is larger than needed.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), Table 402.4(2); 402.4.1 Longest Length Method

  3. Exposed gas piping that is not steel pipe must be identified by a yellow label. What must the label say, and how often must it be repeated?

    Answer: "Gas" in black letters, at intervals not exceeding 5 feet

    Section 401.5 requires exposed piping other than steel pipe to carry a yellow label marked "Gas" in black letters, spaced at intervals of not more than 5 feet. The marking is not required on pipe in the same room as the appliance it serves.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 401.5 Identification

  4. Which of these pipe materials is not permitted for fuel gas piping under the 2018 IFGC?

    Answer: Cast-iron pipe

    Section 403.4.1 flatly states that cast-iron pipe shall not be used. Steel pipe is covered by 403.4.2, copper tubing by 403.5.3 (limited by hydrogen sulfide content) and CSST by 403.5.5.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 403.4.1 Cast Iron

  5. A fitter plans to join lightweight Schedule 10 steel gas pipe. Which joining method is NOT allowed for pipe lighter than Schedule 40?

    Answer: Threaded joints

    Section 403.10.1 allows Schedule 40 and heavier pipe to be threaded, flanged, brazed, welded or joined with listed press-connect fittings, but pipe lighter than Schedule 40 must use press-connect fittings, flanges, brazing or welding. Thin-wall pipe cannot be threaded because threading removes too much of the wall.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 403.10.1 Pipe Joints

  6. A 6-inch Type B gas vent with a listed cap is 10 feet from the nearest vertical wall and passes through a roof with a 9/12 pitch. By the roof slope table, what is the minimum height of the vent above the roof penetration?

    Answer: 2.0 feet

    Section 503.6.5 applies the termination-height figure to gas vents 12 inches or less in size located at least 8 feet from a vertical wall. In the roof slope table, 9/12 falls in the 'over 8/12 to 9/12' row, with H (min) of 2.0 ft. 1.0 ft applies to flat to 6/12 pitch, 1.5 ft to over 7/12 to 8/12, and 3.25 ft to over 10/12 to 11/12.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 503.6.5 Gas Vent Terminations (H min table, Figure 503.6.5)

  7. A single-wall metal pipe vent for a listed draft-hood appliance passes through a combustible exterior wall. How large must the ventilated metal thimble be if there is less than 6 feet of metal pipe in the open between the draft hood and the thimble?

    Answer: At least 4 inches larger in diameter than the pipe

    Section 503.7.7 requires the thimble for listed draft-hood appliances to be at least 4 inches larger than the pipe, or 2 inches larger where at least 6 feet of metal pipe runs in the open between the draft hood outlet and the thimble. Unlisted appliances with draft hoods need 6 inches and residential and low-heat appliances need 12 inches.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 503.7.7 Single-Wall Penetrations of Combustible Walls

  8. A closed utility room is 15 ft by 20 ft with an 8 ft ceiling. Using only the air in that room and the standard method, what is the largest total input of fuel-burning appliances that room can support?

    Answer: 48,000 Btu/h

    Volume = 15 x 20 x 8 = 2,400 cubic feet. The standard method requires 50 cubic feet per 1,000 Btu/h, so the room supports 2,400 / 50 = 48 thousand Btu/h = 48,000 Btu/h (Section 304.5.1). Larger totals need outdoor air or openings to other spaces.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 304.5.1 Standard Method

  9. A boiler room with 150,000 Btu/h of total appliance input gets all of its combustion air from the outdoors through two permanent openings, each connected to the outdoors by a horizontal duct. What minimum free area is required for each opening?

    Answer: 75 square inches

    Where the two openings communicate with the outdoors through horizontal ducts, Section 304.6.1 requires each to have at least 1 square inch per 2,000 Btu/h: 150,000 / 2,000 = 75 square inches. 37.5 uses the direct or vertical-duct value (1 per 4,000), 50 uses the one-opening value (1 per 3,000), and 150 uses 1 per 1,000.

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 304.6.1 Two-Permanent-Openings Method

  10. Which gas appliance may be installed in a bedroom or bathroom under Section 303.3?

    Answer: A direct-vent appliance installed per its listing and instructions

    Section 303.3 prohibits appliances in sleeping rooms, bathrooms, toilet rooms, storage closets and surgical rooms, with listed exceptions. A direct-vent appliance installed in accordance with its listing and the manufacturer's instructions is the first exception. Unvented room heaters are limited by input (6,000 Btu/h in a bathroom, 10,000 Btu/h in a bedroom).

    Reference: 2018 International Fuel Gas Code (Maryland adoption), 303.3 Prohibited Locations

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.