Requirements at a glance
| Agency | Maryland Home Improvement Commission (MHIC); exam by PSI |
|---|---|
| Experience | At least 2 years of verifiable trade experience (apprenticeship, home improvement or construction work, or permitted repairs on your own home); one year can be replaced by business experience as a supervisor, manager or owner, or by building-trade school. |
| Exam | 55 questions, 2.5 hours, 39 correct (70%) to pass |
| Books allowed | NASCLA Contractor's Guide, Maryland Home Improvement Commission 7th edition (the Door-to-Door Sales Act is provided) |
| Fees | $63 to PSI, plus MHIC license, bond and guaranty fund fees |
Anyone doing residential home improvement work in Maryland who needs a Maryland Home Improvement Commission (MHIC) contractor license. Electricians, plumbers and HVACR contractors have their own licenses.
Official links
How to get licensed, step by step
Confirm you qualify
At least 2 years of verifiable trade experience (apprenticeship, home improvement or construction work, or permitted repairs on your own home); one year can be replaced by business experience as a supervisor, manager or owner, or by building-trade school.
Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)Maryland Code (General Assembly) (opens in a new tab)
Apply through PSI
Submit the exam application online at the PSI site below (mailed or faxed applications are returned). PSI and the Board review your documents, then email you how to pay and schedule.
Pass the open-book exam
Exam fees are non-refundable and non-transferable. If you fail, wait 30 days to retest; each later retest requires a 60-day wait.
Apply for the license
After you pass, the Board sends you the license application. Pay the license fee and file any required insurance.
Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)
How to prepare
- Tab your books before exam day: permanent plastic tabs (Avery Swift or Redi-Tag), highlighting and underlining are allowed; Post-It flags and writing in the book are not.
- Home improvement law is 41 of the 55 questions: study the Business Regulation Article Title 8 and COMAR 09.08 as the NASCLA guide summarizes them.
- Know the Door-to-Door Sales Act basics, including the 3-day cancellation right, for 4 questions.
- Estimating (3), labor laws (3) and safety regulations (4) are small sections; practice basic markup and OSHA construction topics.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NASCLA Maryland guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NASCLA Contractor's Guide to Business, Law and Project Management: Maryland Home Improvement Commission, 7th EditionEssential
Allowed in the exam room. Most home improvement law questions are written from it.
NASCLA store: Maryland Home Improvement Commission edition (opens in a new tab)
Maryland Commercial Law Title 14, Subtitle 3: Door-to-Door Sales Act
Provided at the test site. Free online.
Official reference list (as published by the testing agency)
- NASCLA Contractor's Guide to Business, Law and Project Management: Maryland Home Improvement Commission, 7th Edition (allowed in the exam room)
- Maryland Commercial Law Title 14, Subtitle 3, Door-to-Door Sales Act (provided at the test site)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Home Improvement Law | 41 | |
| Door-to-Door Sales Act | 4 | |
| Labor Laws | 3 | |
| Safety Regulations | 4 | |
| Estimating | 3 |
Exam day details
- Administered by PSI Services for the Maryland Home Improvement Commission.
- Fee: $63 to PSI. MHIC license, bond and guaranty fund fees are separate.
- 55 questions in 2.5 hours; 39 correct (70%) to pass.
- Home improvement law is 41 of the 55 questions. It is drawn from the Business Regulation Article Title 8 and COMAR 09.08, as summarized in the NASCLA Maryland guide.
- Open book: you may bring the NASCLA Maryland guide, indexed, highlighted or underlined but not written in, with no loose papers. The Door-to-Door Sales Act is provided at the test site.
- PSI allows only a silent, non-programmable, battery-operated calculator.
- PSI adds a small number of unscored experimental questions.
- You need at least 2 years of verifiable trade experience (one year of it can be replaced by business experience or building-trade school) before PSI approves your application.
- If you fail, wait 30 days to retest; each later retest requires a 60-day wait.
Frequently asked questions
What's on the Maryland home improvement contractor exam?
55 questions: home improvement law 41, door-to-door sales act 4, safety regulations 4, labor laws 3 and estimating 3.
What book is used for the Maryland home improvement exam?
The NASCLA Contractor's Guide to Business, Law and Project Management, Maryland Home Improvement Commission 7th edition. The Door-to-Door Sales Act is provided at the test site.
How much experience do I need?
At least 2 years of verifiable trade experience. One year can be replaced by business experience as a supervisor, manager or owner, or by building-trade school.
Free questions with answers
Show all 10 free questions and answers
Under the Maryland Home Improvement Law, which of the following is a home improvement that requires a Home Improvement Commission contractor license?
Answer: Building a new detached garage on the land next to an existing home for the homeowner
Section 8-101(g)(2)(i) lists a garage built on land adjacent to the building as a home improvement. Construction of a new home, work on commonly owned condominium areas, and a sale of materials where the seller does no installation are all excluded under 8-101(g)(3).
Reference: Maryland Business Regulation Article, Title 8 (Home Improvement Law), 8-101(g)(2) and (g)(3)
A person agrees to build a new home from the ground up for a buyer. Is that work a 'home improvement' covered by Title 8?
Answer: No, construction of a new home is specifically excluded from the definition of home improvement
Section 8-101(g)(3)(i) says home improvement does not include construction of a new home. Home improvement means adding to, altering, repairing or replacing an existing residence or an adjacent structure.
Reference: Maryland Business Regulation Article, Title 8 (Home Improvement Law), 8-101(g)(3)(i)
Which work is NOT a 'home improvement' under Section 8-101 of the Maryland Business Regulation Article?
Answer: Remodeling an apartment building that contains six single-family units
Work on apartment buildings with four or more single-family units is excluded by 8-101(g)(3)(v). Fences and decks are listed in 8-101(g)(2)(i), and work on individual condominium units is included by 8-101(g)(2)(v).
Reference: Maryland Business Regulation Article, Title 8 (Home Improvement Law), 8-101(g)(2)-(3)
Under the Maryland Door-to-Door Sales Act, a buyer may cancel a door-to-door sale up to midnight of which day?
Answer: The third business day after the date of the transaction
Section 14-302(1)(ii) requires the contract to say the buyer may cancel before midnight of the third business day after the date of the transaction, and the Notice of Cancellation in 14-302(2) repeats it.
Reference: Maryland Commercial Law Article, Title 14, Subtitle 3 (Door-to-Door Sales Act), 14-302(1)(ii), (2)
What happens if a door-to-door seller fails to comply with Section 14-302, for example by not giving the notice of cancellation?
Answer: The buyer may cancel by telling the seller in any manner and by any means
Section 14-303 says that if the seller violates any provision of 14-302, the buyer may cancel by notifying the seller in any manner and by any means of the intention to cancel.
Reference: Maryland Commercial Law Article, Title 14, Subtitle 3 (Door-to-Door Sales Act), 14-303
An employer pays a worker $1,000 in a pay period, with wages below any Social Security wage limit. At the rates in IRS Publication 15 (2026), what is the employer's own share of social security and Medicare tax?
Answer: $76.50
The employer pays 6.2% social security and 1.45% Medicare on wages: $1,000 x 0.062 = $62.00 and $1,000 x 0.0145 = $14.50, a total of $76.50. $153.00 is the combined employer plus employee share, and $62.00 leaves out Medicare.
Reference: IRS Publication 15 (2026), Circular E, Social security and Medicare taxes rates
A 16-foot non-self-supporting ladder is used at the proper angle. About how far from the wall should the base be set?
Answer: About 4 feet
29 CFR 1926.1053(b)(5)(i) says a non-self-supporting ladder must be used so the horizontal distance from the top support to the foot is approximately one-quarter of the working length: 16 ft x 1/4 = 4 ft. A 2 foot set uses 1/8, and 8 feet uses 1/2.
Reference: 29 CFR 1926 Subpart X, 1926.1053(b)(5)(i)
Under the EPA Renovation, Repair and Painting rule, how soon before starting work in a covered dwelling unit must the firm give the owner the lead hazard pamphlet?
Answer: No more than 60 days before the renovation begins
40 CFR 745.84(a) requires the renovation firm, no more than 60 days before beginning activities in a dwelling unit, to give the owner the EPA pamphlet and to obtain a written acknowledgment or a certificate of mailing at least 7 days before the renovation.
Reference: 40 CFR Part 745, Subpart E (Renovation, Repair and Painting), 745.84(a)
A contractor must repay the Guaranty Fund $8,000 after a claim was paid on the contractor's account. Using the COMAR simple interest rate for 2 years, what is the total owed?
Answer: $9,600
COMAR 09.08.01.20 requires repayment of the amount paid plus 10 percent per annum simple interest. Interest is $8,000 x 0.10 x 2 = $1,600, so the total is $8,000 + $1,600 = $9,600. Compounding would give $8,000 x 1.10 x 1.10 = $9,680, one year of interest gives $8,800, and a 6.25 percent rate gives $8,000 + $1,000 = $9,000.
Reference: COMAR 09.08.01, .20
A subcontractor on a Maryland construction project fails to pay its workers wages due under the wage payment subtitle, and the workers sue. Under Section 3-507.2(c), who may also be held jointly and severally liable for that violation?
Answer: The general contractor on the project, even without a direct contract with the subcontractor
Section 3-507.2(c)(2) makes a general contractor on a construction services project jointly and severally liable for a subcontractor's violation of the wage payment subtitle, whether or not the two are in a direct contractual relationship. Under (c)(3) the subcontractor must generally indemnify the general contractor. The homeowner and the Guaranty Fund are not named.
Reference: Maryland Labor and Employment Article, Title 3, 3-507.2(c)(2)-(3)
Sources
- PSI: Maryland Home Improvement Examinations Candidate Information Bulletin (10/10/2025) (opens in a new tab)
- Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)
- Maryland General Assembly: Maryland Code (statutes) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.