Requirements at a glance
| Agency | City of Indianapolis / Marion County; exams by Prov |
|---|---|
| License | Refrigeration Unlimited: refrigeration systems for food and product preservation, unlimited in tonnage or horsepower (Allen County wording) |
| Exam | Refrigeration Unlimited: 80 questions, 3 hours, 70% |
| Books allowed | 2018 IMC and IFGC; Pearson HVAC Basics (3rd Edition) and the Intermediate Mechanical Study Guide; the 2018 IBC for Marion County |
| Eligibility | 5 years of heating and cooling experience, or school plus experience totaling 5 years (Revised Code 875-309); Board interview; EPA certification |
| Retakes | Prov: wait 30 days and get a new approval. Board policy: 60-69% may retest once without reappearing; after a second failure, wait one year |
| Fees | $80 to Prov; City license holder fee $189 to $377 depending on when you apply in the two-year term ($247 renewal) |
| Bond and insurance | $5,000 surety bond, $500,000 general liability naming the City, and workers' compensation (or a waiver if you have no employees) |
Refrigeration contractors in Indianapolis and Marion County or in Allen County. Indiana has no statewide refrigeration license; both counties give this Prov exam with the same outline. Allen County describes the license as installation, maintenance, repair and alteration of refrigeration systems for food and product preservation, unlimited in tonnage or horsepower.
Official links
- City of Indianapolis: contractor licenses (opens in a new tab)
- Revised Code of Indianapolis, Chapter 875 (contractor licensing) (opens in a new tab)
- Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
- Schedule with Prov (opens in a new tab)
- Prov bookstore (exam reference books) (opens in a new tab)
How to get licensed, step by step
Apply to Indianapolis
Indiana has no statewide HVAC license; the Indianapolis Board of Heating and Cooling Examiners approves candidates. Send the exam application, a resume, employer letters verifying 5 years of experience, three industry reference letters, your EPA card and driver's license at least 10 business days before the Board's monthly meeting, then interview with the Board. Questions: (317) 327-8467.
City of Indianapolis: contractor licenses (opens in a new tab)
Schedule with Prov
Once approved, register and schedule at provexam.com, at one of Prov's 17 Indiana testing centers or remotely from home. Reschedule at least 3 days ahead or you lose the fee.
Schedule with Prov (opens in a new tab)Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Take the open-book exam
70% to pass. Prov scores it immediately and sends the result to Marion County. If you fail, wait 30 days and get a new approval before you retest.
Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Get licensed
After you pass, return to the Board for orientation, then send BNS the license application with your bond, insurance certificate, workers' compensation proof and fees. Licenses expire December 31 of odd-numbered years.
City of Indianapolis: contractor licenses (opens in a new tab)
How to prepare
- The Marion County exam uses the 2018 ICC codes, not Indiana's older state-adopted mechanical code. Bring the 2018 editions.
- The Pearson study guides, ACCA Manual J and N and the ductulator are all allowed. Tab the load calculation and duct sizing steps; sizing questions are 20 to 22 of the questions.
- Marion County and Allen County both give this exam with the same outline. The approval steps above are Marion County's; for Allen County, contact the Allen County Building Department.
- Systems and sizing (24), piping (23) and general knowledge (22) are most of the exam. Study IMC 2018 chapter 11 on refrigeration.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2018 EditionEssential
Allowed in the exam room. Ducts, ventilation, piping and equipment installation.
International Fuel Gas Code (IFGC), 2018 Edition
Allowed in the exam room. Gas piping sizing and appliance venting.
HVAC Basics for Contractors, 3rd Edition (Pearson)
Allowed in the exam room. General knowledge, equipment and maintenance.
International Building Code (IBC), 2018 Edition
Allowed in the exam room for the Air Conditioning "A" and "B" exams (and Marion County Refrigeration Unlimited).
Official reference list (as published by the testing agency)
- International Mechanical Code, 2018 (open book)
- International Fuel Gas Code, 2018 (open book)
- HVAC Basics for Contractors, 3rd Edition, Pearson (open book)
- Intermediate Mechanical Study Guide, 2015, Pearson (open book)
- International Building Code, 2018 (Marion County bulletin only; open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 22 | |
| Piping | 23 | |
| Systems & Sizing | 24 | |
| Maintenance | 7 | |
| Plan Reading | 4 |
Exam day details
- Administered by Prov, Inc. for Marion County (Indianapolis) and Allen County.
- Fee: $80 to Prov (computer-based). Marion County's city license holder fee is separate; check Allen County for its fees.
- 80 questions in 3 hours; 70% to pass. Prov lists the same outline in its Marion County and Allen County bulletins.
- Both bulletins list the 2018 IMC and IFGC, HVAC Basics for Contractors (3rd Edition) and the Intermediate Mechanical Study Guide as open book. The Marion County bulletin also lists the 2018 IBC.
- Refrigeration questions draw on IMC 2018 chapter 11 (refrigeration).
- In Indianapolis, Refrigeration is one of the license types on the Board of Heating and Cooling Examiners application: 5 years of experience, three reference letters, a copy of your EPA certification card (Universal is required for Refrigeration), a Board interview, and the same City bond, insurance and fees as the Air Conditioning licenses. The Allen County approval process is handled by the Allen County Building Department.
Frequently asked questions
What's on the Refrigeration Unlimited exam?
80 questions: systems and sizing 24, piping 23, general knowledge 22, maintenance 7 and plan reading 4.
Is this exam given in both Marion and Allen County?
Yes. Prov lists the same 80-question outline in both counties' bulletins. Marion County also lists the 2018 IBC as an open-book reference.
Which books can I use?
The 2018 IMC and IFGC, HVAC Basics for Contractors (3rd Edition) and the Intermediate Mechanical Study Guide (Pearson), plus the 2018 IBC for Marion County.
Free questions with answers
Show all 10 free questions and answers
Under 40 CFR 82.152, which description fits an appliance charged with R-134a?
Answer: Medium-pressure: liquid saturation pressure between 45 and 170 psia at 104°F
The definitions in 82.152 list R-12, R-114, R-124, R-134a and R-500 as medium-pressure examples (45 to 170 psia at 104°F). R-22, R-410A, R-407C and R-502 are high-pressure, R-123 is low-pressure, and R-23 is very high-pressure.
Reference: 40 CFR Part 82, Subpart F, 82.152 (medium-pressure appliance)
A technician must recover R-134a from a 120-pound medium-pressure system before opening it, using recovery equipment made after November 15, 1993. To what level must the refrigerant be evacuated under 82.156 Table 1?
Answer: 10 inches of Hg vacuum
Table 1 requires 10 inches of Hg vacuum for a medium-pressure appliance with a full charge under 200 pounds when recovery equipment made on or after November 15, 1993 is used. 15 inches applies at 200 pounds or more, 0 applies to very high-pressure appliances and small high-pressure systems, and 25 mm Hg absolute is the low-pressure requirement.
Reference: 40 CFR Part 82, Subpart F, 82.156(a) Table 1
What is the maximum total of Group A2, B2, A3 and B3 refrigerants other than ammonia that IMC 1104.3.3 allows in a building unless the code official approves more?
Answer: 1,100 pounds
Section 1104.3.3 limits the total of Group A2, B2, A3 and B3 refrigerants, other than R-717, to 1,100 pounds unless approved. 550 pounds is the institutional limit in 1104.2.1, 220 pounds is the Group A1 threshold in 1101.8, and 6.6 pounds is the machinery-room exception figure.
Reference: 2018 International Mechanical Code, 1104.3.3
Which standard does IMC 1107.1 name for the design of refrigerant piping?
Answer: ASME B31.5
Section 1107.1 says refrigerant piping design is in accordance with ASME B31.5, and that the piping is installed, tested and placed in operation per Chapter 11. ASHRAE 34 classifies refrigerants and MSS SP-58 is a hanger standard referenced by Section 305.4.
Reference: 2018 International Mechanical Code, 1107.1
Refrigerant piping is to be buried in a new concrete slab. What does IMC 1107.2.1 require?
Answer: The piping must be encased in pipe ducts, isolated and supported to prevent damage
Section 1107.2.1 requires refrigerant piping in concrete floors to be encased in pipe ducts and isolated and supported to prevent damaging vibration, stress and corrosion. Direct burial of tubing is not allowed.
Reference: 2018 International Mechanical Code, 1107.2.1
A glycol chiller serving a process loop circulates 60 gpm of water-equivalent fluid with a 10°F temperature drop. Using Q = 500 x gpm x delta-T, how many tons of cooling is that?
Answer: 25 tons
Q = 500 x 60 x 10 = 300,000 Btu/h; 300,000 / 12,000 Btu/h per ton = 25 tons. 300 tons forgets the 12,000 divisor in thousands, 30 tons divides 360,000 by 12,000, and 2.5 tons shifts the decimal.
Reference: General refrigeration load practice, Chilled-fluid load: Q = 500 x gpm x delta-T; 1 ton = 12,000 Btu/h
A cooler load is 36,000 Btu/h at design and the condensing unit delivers 48,000 Btu/h at the same conditions. What is the expected compressor run time per day?
Answer: 18 hours (75 percent)
Run time = load / capacity = 36,000 / 48,000 = 0.75, so 75 percent of 24 hours = 18 hours. 133 percent comes from inverting the ratio, which is not possible in a 24-hour day.
Reference: General refrigeration load practice, Run-time ratio = load / equipment capacity
A supermarket rack holds 600 lb of R-22. How often must a certified technician conduct leak inspections under 82.157(g) until four quarters in a row stay under the leak rate?
Answer: Once every three months
For commercial refrigeration appliances with a full charge of 500 pounds or more, 82.157(g)(1)(i) requires inspections every three months until the owner demonstrates, using leak rate calculations, that the appliance has not exceeded the leak rate for four quarters in a row. Smaller appliances (50 to under 500 pounds) are inspected annually. Since April 10, 2020, 82.157 applies only to appliances with 50 lb or more of a class I or class II refrigerant (such as R-22), not to appliances with only HFC substitutes.
Reference: 40 CFR Part 82, Subpart F, 82.157(g)(1)(i)
An R-22 commercial refrigeration appliance has a 60-lb full charge. Fifteen pounds were added 120 days after the last refrigerant addition. Using the annualizing method in 82.152, what is the leak rate, and does it exceed the 20 percent trigger?
Answer: About 76 percent; yes, it exceeds 20 percent
Step 1: 15 / 60 = 0.25. Step 2: 120 / 365 = 0.3288. Step 3: 0.25 / 0.3288 = 0.7604. Step 4: x 100 = 76.0 percent, above 20 percent, so repairs or a retrofit plan are required. 25 percent skips the annualizing step. Since April 10, 2020, 82.157 applies only to appliances with 50 lb or more of a class I or class II refrigerant (such as R-22), not to appliances with only HFC substitutes.
Reference: 40 CFR Part 82, Subpart F, 82.152 (leak rate, annualizing method); 82.157(c)(2)(i)
Why do designers include a riser diagram or isometric with a refrigeration piping layout?
Answer: To show vertical offsets, traps and riser routing that a plan view cannot
A plan view shows horizontal runs only. A riser diagram or isometric shows elevations, vertical risers, oil traps and changes in pipe size, which matter for oil return and for checking clearances such as the 7 feet 3 inches in IMC 1107.2.
Reference: Construction drawing conventions, Riser diagrams and isometrics
Sources
- Prov: Marion County Candidate Information Bulletin (air conditioning) (opens in a new tab)
- Prov: Allen County Building Department Candidate Information Bulletin (opens in a new tab)
- City of Indianapolis (Business and Neighborhood Services): contractor licenses (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.