Requirements at a glance
| Agency | City of Indianapolis / Marion County; exams by Prov |
|---|---|
| License | Air Conditioning "A" (unrestricted): all heating and cooling work without limitation |
| Exam | Air Conditioning "A": 100 questions, 4 hours, 70% |
| Books allowed | 2018 IMC, IFGC, IECC and IBC; ACCA Manual J (2025) and Manual N; ductulator; Pearson HVAC Basics and the Intermediate and Advanced Mechanical study guides |
| Eligibility | 5 years of heating and cooling experience, or school plus experience totaling 5 years (Revised Code 875-309); Board interview; EPA certification |
| Retakes | Prov: wait 30 days and get a new approval. Board policy: 60-69% may retest once without reappearing; after a second failure, wait one year |
| Fees | $80 to Prov; City license holder fee $189 to $377 depending on when you apply in the two-year term ($247 renewal) |
| Bond and insurance | $5,000 surety bond, $500,000 general liability naming the City, and workers' compensation (or a waiver if you have no employees) |
Heating and cooling contractors licensed in Indianapolis and Marion County. The "A" license is unrestricted: all kinds of heating and cooling work without limitation. Indiana has no statewide HVAC license; cities and counties license it.
Official links
- City of Indianapolis: contractor licenses (opens in a new tab)
- Revised Code of Indianapolis, Chapter 875 (contractor licensing) (opens in a new tab)
- Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
- Schedule with Prov (opens in a new tab)
- Prov bookstore (exam reference books) (opens in a new tab)
How to get licensed, step by step
Apply to Indianapolis
Indiana has no statewide HVAC license; the Indianapolis Board of Heating and Cooling Examiners approves candidates. Send the exam application, a resume, employer letters verifying 5 years of experience, three industry reference letters, your EPA card and driver's license at least 10 business days before the Board's monthly meeting, then interview with the Board. Questions: (317) 327-8467.
City of Indianapolis: contractor licenses (opens in a new tab)
Schedule with Prov
Once approved, register and schedule at provexam.com, at one of Prov's 17 Indiana testing centers or remotely from home. Reschedule at least 3 days ahead or you lose the fee.
Schedule with Prov (opens in a new tab)Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Take the open-book exam
70% to pass. Prov scores it immediately and sends the result to Marion County. If you fail, wait 30 days and get a new approval before you retest.
Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Get licensed
After you pass, return to the Board for orientation, then send BNS the license application with your bond, insurance certificate, workers' compensation proof and fees. Licenses expire December 31 of odd-numbered years.
City of Indianapolis: contractor licenses (opens in a new tab)
How to prepare
- The Marion County exam uses the 2018 ICC codes, not Indiana's older state-adopted mechanical code. Bring the 2018 editions.
- The Pearson study guides, ACCA Manual J and N and the ductulator are all allowed. Tab the load calculation and duct sizing steps; sizing questions are 20 to 22 of the questions.
- Maintenance (22) and systems and sizing (20) are the biggest sections, then general knowledge (19) and piping (18).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2018 EditionEssential
Allowed in the exam room. Ducts, ventilation, piping and equipment installation.
International Fuel Gas Code (IFGC), 2018 Edition
Allowed in the exam room. Gas piping sizing and appliance venting.
ACCA Manual J, Residential Load Calculation (2025) and Manual N, Commercial Load Calculations (2008)
Allowed in the exam room for the "A" and "B" exams. Systems and sizing questions.
International Building Code (IBC), 2018 Edition
Allowed in the exam room for the Air Conditioning "A" and "B" exams (and Marion County Refrigeration Unlimited).
HVAC Basics for Contractors, 3rd Edition (Pearson)
Allowed in the exam room. General knowledge, equipment and maintenance.
Official reference list (as published by the testing agency)
- International Building Code, 2018 (open book)
- International Mechanical Code, 2018 (open book)
- International Fuel Gas Code, 2018 (open book)
- International Energy Conservation Code, 2018 (open book)
- HVAC Basics for Contractors, 3rd Edition, Pearson (open book)
- Intermediate Mechanical Study Guide, 2015, Pearson (open book)
- Advanced Mechanical Study Guide, 2nd Edition, Pearson (open book)
- Trane Ductulator, 2013 (the ACCA ductulator is also allowed; open book)
- Residential Load Calculation, Manual J, 2025, ACCA (open book)
- Manual N, Commercial Load Calculations, 2008, ACCA (open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Piping | 18 | |
| Equipment | 14 | |
| Maintenance | 22 | |
| Plan Reading | 7 | |
| Systems & Sizing | 20 | |
| General Knowledge | 19 |
Exam day details
- Administered by Prov, Inc. for Marion County (Indianapolis).
- Fee: $80 to Prov (computer-based). The Indianapolis license holder fee is separate ($189 to $377 depending on when you apply in the two-year term).
- 100 questions in 4 hours; 70% to pass.
- The Marion County exam uses the 2018 ICC codes, not Indiana's state-adopted 2014 Indiana Mechanical Code (675 IAC 18-1.6), which Indianapolis enforces on permitted work.
- Open book: bring the references the Prov bulletin lists as open book (codes, ACCA Manual J and N, the Trane or ACCA ductulator and the Pearson study guides).
- To be approved to test you need at least 5 years of practical heating and cooling experience, or a mix of school and experience totaling 5 years (Revised Code 875-309). Send the Board of Heating and Cooling Examiners the exam application, a resume, employer letters on letterhead verifying the 5 years, three reference letters from people in the HVACR industry, your EPA certification card and a copy of your driver's license at least 10 business days before its monthly meeting (second Monday). You then interview with the Board.
- Once approved, you schedule with Prov, at one of its 17 Indiana testing centers or remotely from home.
- Prov's bulletin says to wait 30 days after a fail and get a new approval before retesting. Under the Board's 2026 policy, a score of 60% to 69% allows one retest without going back before the Board; under 60% you must reappear with evidence you have improved; after a second failure you wait one year.
- Reschedule or cancel at least 3 days before your appointment, or you forfeit the exam fee.
- After you pass, you go back before the Board for orientation, then send the City a $5,000 surety bond, a general liability certificate ($500,000 per occurrence, naming the City as additional insured) and workers' compensation proof with the license application (Revised Code 875-315 and 875-316).
- City license holder fee (2026-2027 term): $377 if you apply January to June 2026, $283 July to December 2026, $189 in 2027; $247 to renew. A business license is also needed ($247 for a full term, prorated the same way; not charged to sole proprietors). Licenses expire December 31 of odd-numbered years.
- The Board requires Universal EPA certification for the "A" license.
Frequently asked questions
What's on the Indianapolis Air Conditioning "A" exam?
100 questions: maintenance 22, systems and sizing 20, general knowledge 19, piping 18, equipment 14 and plan reading 7.
Which codes does the Indianapolis air conditioning exam use?
The 2018 International Mechanical Code, Fuel Gas Code, Energy Conservation Code and Building Code, plus ACCA Manual J (2025) and Manual N and the Pearson study guides.
What does the "A" license cover?
The unrestricted license covers all kinds of heating and cooling work without limitation. The "D" license is limited to single phase, 5 tons of cooling and 300,000 Btu/h of heating.
Free questions with answers
Show all 10 free questions and answers
A refrigerant line set will cross an open mechanical room floor where people walk. Unless the piping is run against the ceiling, what is the minimum height above the floor under the 2018 IMC?
Answer: 7 feet 3 inches
IMC 1107.2 requires refrigerant piping that crosses an open space affording passageway to be at least 7 feet 3 inches above the floor unless it is located against the ceiling of that space. The 6 ft 8 in figure is a common door-height number and does not apply here.
Reference: 2018 International Mechanical Code, 1107.2
An installer is running annealed-temper ACR copper tubing for a field-installed refrigerant circuit and plans to use flare-type mechanical joints on a 1-1/8 inch OD line. Under the 2018 IMC, why is this a problem?
Answer: Only listed press-connect mechanical joints are allowed above 7/8 inch OD
Section 1107.5.3 prohibits mechanical joints (other than press-connect joints listed for refrigerant piping) on annealed-temper copper tube larger than 7/8 inch OD. Annealed tube also may not be used in sizes above 2-inch nominal. The code does not set a 1/2-inch limit and does not call for 50-50 solder.
Reference: 2018 International Mechanical Code, 1107.5.3
A gas-fired unit heater will hang in a private residential garage, not protected from vehicle impact. What is the minimum clearance above the floor required by the 2018 IMC?
Answer: 6 feet
Section 304.7 requires appliances in private garages and carports to have at least 6 feet of clearance above the floor unless protected from vehicle impact and installed with the ignition source elevated per 304.3. The 8-foot figure in Section 304.6 applies to public garages and similar areas frequented by motor vehicles.
Reference: 2018 International Mechanical Code, 304.7
Which standard does 2018 IMC Section 102.3 name for performing the inspection for maintenance of HVAC systems?
Answer: ASHRAE/ACCA/ANSI Standard 180
Section 102.3 ends by stating that the inspection for maintenance of HVAC systems is performed in accordance with ASHRAE/ACCA/ANSI Standard 180. Standard 15 is the refrigeration safety standard referenced in Chapter 11, and SMACNA governs duct construction.
Reference: 2018 International Mechanical Code, 102.3
A technician is replacing the access door label for a fire damper in a duct. How tall must the letters on the permanent identification label be under the 2018 IMC?
Answer: At least 0.5 inch
Section 607.4 requires fire and smoke dampers to have an approved means of access, and access points must be permanently identified on the exterior with a label having letters not less than 0.5 inch high reading FIRE/SMOKE DAMPER, SMOKE DAMPER or FIRE DAMPER.
Reference: 2018 International Mechanical Code, 607.4
A zone needs a breathing zone outdoor airflow of 170 cfm. In heating mode it is served by a ceiling supply of warm air at 25 degrees F above space temperature, with a ceiling return. Using 2018 IMC Table 403.3.1.1.1.2 and Equation 4-2, what is the zone outdoor airflow, Voz?
Answer: 212.5 cfm
Table 403.3.1.1.1.2 assigns a zone air distribution effectiveness Ez of 0.8 for ceiling supply of warm air with ceiling return (the 1.0 allowance in footnote f applies only when supply air is less than 15 degrees F above space temperature, so it does not apply at 25 degrees F). Voz = Vbz / Ez = 170 / 0.8 = 212.5 cfm. Multiplying by 0.8 gives 136 cfm, a common error, 170 cfm would use Ez = 1.0, and 340 cfm would use Ez = 0.5.
Reference: 2018 International Mechanical Code, 403.3.1.1.1.3; Table 403.3.1.1.1.2
A cooling load calculation shows 54,000 Btu/h of total cooling. How many tons of cooling capacity does this represent (1 ton = 12,000 Btu/h)?
Answer: 4.5 tons
One ton of cooling equals 12,000 Btu/h, so 54,000 / 12,000 = 4.5 tons. Equipment is sold in nominal half-ton or whole-ton sizes, and a contractor would select against the calculated load using the manufacturer's data.
Reference: General HVAC practice, Ton of refrigeration (12,000 Btu/h)
On a mechanical floor plan drawn at 1/4 inch = 1 foot, a supply duct run measures 3 inches long. What is its actual length?
Answer: 12 feet
At 1/4 inch = 1 foot, each inch on the drawing is 4 feet: 3 inches x 4 = 12 feet. Dividing by 4 instead of multiplying by 4 gives 0.75, and confusing the scale with 1/8 inch = 1 foot would give 24 feet.
Reference: General drafting practice, Architectural scale (inches on drawing per foot of actual length)
Which safety group in the IMC refrigerant tables designates propane (R-290), a lower toxicity, higher flammability refrigerant?
Answer: A3
Table 1103.1 lists R-290 as group A3. The letter A means lower toxicity, and the numeral 3 means higher flammability. A1 refrigerants do not propagate flame, and B groups are higher toxicity.
Reference: 2018 International Mechanical Code, Table 1103.1
Under IBC Section 304.1, a branch bank office building is classified in which occupancy group?
Answer: Group B, Business
Section 304.1 lists banks, civic administration, professional services and similar uses in Group B, Business. Restaurants and taverns are A-2 under Section 303.3, and R-3 covers one- and two-family dwellings and similar permanent residential uses.
Reference: 2018 International Building Code, 304.1
Sources
- Prov: Marion County Candidate Information Bulletin (air conditioning) (opens in a new tab)
- City of Indianapolis (Business and Neighborhood Services): contractor licenses (opens in a new tab)
- Revised Code of Indianapolis and Marion County, Chapter 875 (contractors and skilled trades) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.