Requirements at a glance
| Agency | City of Indianapolis / Marion County; exams by Prov |
|---|---|
| License | Air Conditioning "B": central air conditioning, heating and ventilating up to 25 tons of cooling and 500,000 Btu/h of heating, no water boiler rated above 30 psi |
| Exam | Air Conditioning "B": 100 questions, 4 hours, 70% |
| Books allowed | 2018 IMC, IFGC, IECC and IBC; ACCA Manual J (2025) and Manual N; ductulator; Pearson HVAC Basics and the Intermediate and Advanced Mechanical study guides |
| Eligibility | 5 years of heating and cooling experience, or school plus experience totaling 5 years (Revised Code 875-309); Board interview; EPA certification |
| Retakes | Prov: wait 30 days and get a new approval. Board policy: 60-69% may retest once without reappearing; after a second failure, wait one year |
| Fees | $80 to Prov; City license holder fee $189 to $377 depending on when you apply in the two-year term ($247 renewal) |
| Bond and insurance | $5,000 surety bond, $500,000 general liability naming the City, and workers' compensation (or a waiver if you have no employees) |
Heating and cooling contractors in Indianapolis and Marion County. The "B" license covers central air conditioning, heating and ventilating, including ductwork, in a complete system up to 25 tons of cooling and 500,000 Btu/h of heating, with no water boiler rated above 30 psi.
Official links
- City of Indianapolis: contractor licenses (opens in a new tab)
- Revised Code of Indianapolis, Chapter 875 (contractor licensing) (opens in a new tab)
- Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
- Schedule with Prov (opens in a new tab)
- Prov bookstore (exam reference books) (opens in a new tab)
How to get licensed, step by step
Apply to Indianapolis
Indiana has no statewide HVAC license; the Indianapolis Board of Heating and Cooling Examiners approves candidates. Send the exam application, a resume, employer letters verifying 5 years of experience, three industry reference letters, your EPA card and driver's license at least 10 business days before the Board's monthly meeting, then interview with the Board. Questions: (317) 327-8467.
City of Indianapolis: contractor licenses (opens in a new tab)
Schedule with Prov
Once approved, register and schedule at provexam.com, at one of Prov's 17 Indiana testing centers or remotely from home. Reschedule at least 3 days ahead or you lose the fee.
Schedule with Prov (opens in a new tab)Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Take the open-book exam
70% to pass. Prov scores it immediately and sends the result to Marion County. If you fail, wait 30 days and get a new approval before you retest.
Prov: Marion County (Indianapolis) bulletin (opens in a new tab)
Get licensed
After you pass, return to the Board for orientation, then send BNS the license application with your bond, insurance certificate, workers' compensation proof and fees. Licenses expire December 31 of odd-numbered years.
City of Indianapolis: contractor licenses (opens in a new tab)
How to prepare
- The Marion County exam uses the 2018 ICC codes, not Indiana's older state-adopted mechanical code. Bring the 2018 editions.
- The Pearson study guides, ACCA Manual J and N and the ductulator are all allowed. Tab the load calculation and duct sizing steps; sizing questions are 20 to 22 of the questions.
- Maintenance (23) is the biggest section, then systems and sizing (20) and piping (19). Know the license limits: 25 tons, 500,000 Btu/h, 30 psi boiler pressure.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2018 EditionEssential
Allowed in the exam room. Ducts, ventilation, piping and equipment installation.
International Fuel Gas Code (IFGC), 2018 Edition
Allowed in the exam room. Gas piping sizing and appliance venting.
ACCA Manual J, Residential Load Calculation (2025) and Manual N, Commercial Load Calculations (2008)
Allowed in the exam room for the "A" and "B" exams. Systems and sizing questions.
International Building Code (IBC), 2018 Edition
Allowed in the exam room for the Air Conditioning "A" and "B" exams (and Marion County Refrigeration Unlimited).
HVAC Basics for Contractors, 3rd Edition (Pearson)
Allowed in the exam room. General knowledge, equipment and maintenance.
Official reference list (as published by the testing agency)
- International Building Code, 2018 (open book)
- International Mechanical Code, 2018 (open book)
- International Fuel Gas Code, 2018 (open book)
- International Energy Conservation Code, 2018 (open book)
- HVAC Basics for Contractors, 3rd Edition, Pearson (open book)
- Intermediate Mechanical Study Guide, 2015, Pearson (open book)
- Advanced Mechanical Study Guide, 2nd Edition, Pearson (open book)
- Trane Ductulator, 2013 (the ACCA ductulator is also allowed; open book)
- Residential Load Calculation, Manual J, 2025, ACCA (open book)
- Manual N, Commercial Load Calculations, 2008, ACCA (open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 18 | |
| Piping | 19 | |
| Systems & Sizing | 20 | |
| Equipment | 15 | |
| Maintenance | 23 | |
| Plan Reading | 5 |
Exam day details
- Administered by Prov, Inc. for Marion County (Indianapolis).
- Fee: $80 to Prov (computer-based). The Indianapolis license holder fee is separate ($189 to $377 depending on when you apply in the two-year term).
- 100 questions in 4 hours; 70% to pass.
- The "B" exam has the same question count and references as the "A" exam but different topic weights and a smaller license scope (25 tons cooling, 500,000 Btu/h heating, no boiler over 30 psi).
- The Marion County exam uses the 2018 ICC codes, not Indiana's state-adopted 2014 Indiana Mechanical Code (675 IAC 18-1.6), which Indianapolis enforces on permitted work.
- Open book: bring the references the Prov bulletin lists as open book (codes, ACCA Manual J and N, the Trane or ACCA ductulator and the Pearson study guides).
- To be approved to test you need at least 5 years of practical heating and cooling experience, or a mix of school and experience totaling 5 years (Revised Code 875-309). Send the Board of Heating and Cooling Examiners the exam application, a resume, employer letters on letterhead verifying the 5 years, three reference letters from people in the HVACR industry, your EPA certification card and a copy of your driver's license at least 10 business days before its monthly meeting (second Monday). You then interview with the Board.
- Once approved, you schedule with Prov, at one of its 17 Indiana testing centers or remotely from home.
- Prov's bulletin says to wait 30 days after a fail and get a new approval before retesting. Under the Board's 2026 policy, a score of 60% to 69% allows one retest without going back before the Board; under 60% you must reappear with evidence you have improved; after a second failure you wait one year.
- Reschedule or cancel at least 3 days before your appointment, or you forfeit the exam fee.
- After you pass, you go back before the Board for orientation, then send the City a $5,000 surety bond, a general liability certificate ($500,000 per occurrence, naming the City as additional insured) and workers' compensation proof with the license application (Revised Code 875-315 and 875-316).
- City license holder fee (2026-2027 term): $377 if you apply January to June 2026, $283 July to December 2026, $189 in 2027; $247 to renew. A business license is also needed ($247 for a full term, prorated the same way; not charged to sole proprietors). Licenses expire December 31 of odd-numbered years.
- EPA certification: the Board requires both Type I and Type II for the Air Conditioning "B" license.
Frequently asked questions
What's on the Indianapolis Air Conditioning "B" exam?
100 questions: maintenance 23, systems and sizing 20, piping 19, general knowledge 18, equipment 15 and plan reading 5.
What are the limits of the "B" license?
Central air conditioning, heating and ventilating within a complete system limited to 25 tons of cooling and 500,000 Btu/h of heating, with no water boiler rated above 30 psi.
Which codes does the exam use?
The 2018 International Mechanical, Fuel Gas, Energy Conservation and Building codes, plus ACCA Manual J (2025) and Manual N (2008), the ductulator and the Pearson study guides.
Free questions with answers
Show all 10 free questions and answers
A duct smoke detector in a return air system is in a building that must have a fire alarm system, and the building is monitored by a supervising station. How must actuation of the duct detector be reported under the 2018 IMC?
Answer: As a supervisory signal only, not as a fire alarm
Section 606.4.1 requires duct detectors to connect to the fire alarm system where one is required, and in facilities monitored by a supervising station they report only as a supervisory signal. The detector must also shut down the air distribution system per Section 606.4. Reporting as a full alarm is the common wrong assumption.
Reference: 2018 International Mechanical Code, 606.4.1
Under the 2018 IMC, how must supply and return ducts in a 12,000 square foot retail building (not a dwelling unit) be sized?
Answer: By the ASHRAE Handbook of Fundamentals or another equivalent computation procedure
Section 603.2 requires Manual D, the manufacturer's instructions or another approved method only for ducts within a single dwelling unit. Ducts in all other buildings are sized by the ASHRAE Handbook of Fundamentals or an equivalent computation. There is no table of minimum duct sizes in Section 603.
Reference: 2018 International Mechanical Code, 603.2
A gas-fired unit heater is hung from the ceiling along the wall of a vehicle repair garage, away from the drive aisle so no vehicle passes beneath it. Under IMC 304.6, what is the minimum mounting height above the floor, unless the unit is protected from vehicle impact?
Answer: 8 feet above the floor
Section 304.6 requires appliances in public garages, repair garages and other areas frequented by motor vehicles to be at least 8 feet above the floor, and where vehicles can pass under, at least 1 foot higher than the tallest garage door opening. The 6-foot figure is the private garage rule in Section 304.7.
Reference: 2018 International Mechanical Code, 304.6
A variable air volume system serves a floor of offices and is not a 100-percent outdoor air system. What does IMC 403.3.1.4 require of its controls?
Answer: Controls that keep outdoor airflow at or above the required rate over the whole range of supply air rates
Section 403.3.1.4 requires VAV systems (other than those supplying only 100-percent outdoor air) to have controls that regulate outdoor air to maintain not less than the Section 403.3 rate across the entire range of supply air operating rates. Without it, outdoor air falls as the boxes throttle.
Reference: 2018 International Mechanical Code, 403.3.1.4
A chilled water loop for a 20-ton system has a maximum design pressure of 90 psi. What minimum hydrostatic test pressure and duration does IMC 1208.1 require?
Answer: 135 psi for at least 15 minutes
Section 1208.1 requires hydronic piping to be tested at 1.5 times the maximum design pressure, but not less than 100 psi, for at least 15 minutes. 1.5 x 90 = 135 psi, which is above the 100 psi floor. 100 psi alone ignores the multiplier, and 180 psi doubles the pressure.
Reference: 2018 International Mechanical Code, 1208.1
A glycol-based transfer fluid will be used in a hydronic loop with a maximum system operating temperature of 220 degrees F. What minimum flash point does IMC 1207.1 require for the fluid?
Answer: 270 degrees F
Section 1207.1 requires the flash point of the transfer fluid to be not less than 50 degrees F above the maximum system operating temperature: 220 + 50 = 270 degrees F. 250 adds only 30 and 220 adds none.
Reference: 2018 International Mechanical Code, 1207.1
A maintenance contractor replaces media-type air filters in a commercial air handler. Under IMC 605.2, what must these filters be?
Answer: Listed and labeled, and the media type must comply with UL 900
Section 605.2 requires media-type and electrostatic-type filters to be listed and labeled, with media types complying with UL 900, HEPA filters UL 586 and electrostatic filters UL 867. Filters in dwelling units are not required to be listed and labeled.
Reference: 2018 International Mechanical Code, 605.2
During annual service of a steam boiler, a technician tests the low-water cutoff. What must the control do under IMC 1007.2 when the water level drops below the lowest safe level?
Answer: Automatically stop combustion operation of the appliance
Section 1007.2 requires the low-water cutoff to automatically stop the combustion operation when the water level falls below the lowest safe level set by the manufacturer. An alarm alone or a low-fire hold does not meet the section.
Reference: 2018 International Mechanical Code, 1007.2
Who must furnish the apparatus, material and labor needed for required pressure or leak tests of a mechanical system under IMC 107.3.2?
Answer: The permit holder
Section 107.3.2 requires the apparatus, material and labor for testing to be furnished by the permit holder. Where work fails, 107.3.3 requires correction and resubmittal for inspection and testing.
Reference: 2018 International Mechanical Code, 107.3.2
On a mechanical floor plan drawn at 1/8 inch = 1 foot, a supply duct run measures 4-1/2 inches. How long is the actual duct run?
Answer: 36 feet
At 1/8 inch per foot, one inch represents 8 feet, so 4.5 inches x 8 = 36 feet. 18 feet uses a 1/4 inch scale, and 72 feet doubles the result.
Reference: General HVAC practice, Architectural scale (inches on drawing per foot of actual length)
Sources
- Prov: Marion County Candidate Information Bulletin (air conditioning) (opens in a new tab)
- City of Indianapolis (Business and Neighborhood Services): contractor licenses (opens in a new tab)
- Revised Code of Indianapolis and Marion County, Chapter 875 (contractors and skilled trades) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.