Hawaii licensing exam

Hawaii B General Building Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Hawaii's B general building contractor classification: 80 questions on plan reading, sitework, concrete, carpentry, associated trades, roofing and safety. Closed book, 4 hours.

Questions
80
Time limit
4 hours
Passing score
75%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Plan Reading and Estimating

A concrete block wall is 40 ft long and 8 ft high. It has two 3 ft by 7 ft door openings and one 4 ft by 4 ft window opening. Using 1.125 standard 8 x 16 in. blocks per square foot of wall, about how many blocks are needed?

Requirements at a glance

AgencyHawaii Contractors License Board (DCCA PVL); exams by PSI
ExperienceAt least 4 years of supervisory experience (foreman, supervising employee or contractor) in the classification within the past 10 years (HAR 16-77-18); the Board may accept equivalent training or experience
ExamsB General Building Contractor: 80 questions, 4 hours, 75%, plus the Business and Law exam for new applicants
Books allowedNone; closed book
Fees$80 to PSI per exam ($85 for B and A), plus the Board's application and license fees and required insurance

Qualifiers for a Hawaii B general building contractor license from the Contractors License Board, in addition to the Business and Law exam.

How to get licensed, step by step

  1. Apply to the Board

    Send the Contractors License Board your application. You can't register with PSI until the Board approves it and sends a letter of approval.

    Contractors License Board (opens in a new tab)Hawaii Administrative Rules 16-77 (contractors) (opens in a new tab)

  2. Schedule Business and Law and the B exam with PSI

    Register online or call PSI at 833-333-4754. Your approval is good for 6 months and you can test as often as you like in that time. After 6 months you need a new application.

    Schedule with PSI (Hawaii trade exams) (opens in a new tab)

  3. Pass both exams

    Each exam needs 75%. If you already hold a Hawaii license and add a classification, you take only the new trade exam.

    Schedule with PSI (Hawaii trade exams) (opens in a new tab)

  4. Get licensed

    Send the Board your results and proof of the insurance (workers' compensation and liability) the license requires.

    Contractors License Board (opens in a new tab)Hawaii Revised Statutes chapter 444 (contractors) (opens in a new tab)

How to prepare

  • Hawaii's trade exams are PSI exams on specific editions: the 2020 NEC, the 2018 UPC, IMC, IFGC and IBC. Hawaii's state electrical code is older than the 2020 NEC, so study to the editions on PSI's bulletin, and check the bulletin again before test day.
  • Contractor exams are closed book except C-13, where PSI provides the NEC. Electrician exams provide the NEC too. Plumber and other contractor exams allow no reference books.
  • Concrete (16) and associated trades (16) are 32 of the 80 questions; carpentry is 14.
  • Concrete covers only C-31a cement concrete, and roofing covers only metal and wood shingles.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

  • 2018 International Building Code (IBC), ICC

    On PSI's outline, closed book.

  • Carpentry and Building Construction, 2016 Student Edition, Feirer and Feirer, McGraw-HillEssential

    On PSI's outline, closed book. Carpentry, finishes and associated trades.

  • Modern Masonry: Brick, Block, Stone, 9th Edition (2020), Goodheart-Willcox

    On PSI's outline, closed book.

  • Contractor's Guide to Quality Concrete Construction, 4th Edition (2018), ACI

    On PSI's outline, closed book. Concrete questions.

  • 29 CFR Part 1926 (OSHA construction standards)

    On PSI's outline, closed book. Safety questions.

    Read free (eCFR) (opens in a new tab)

Official reference list (as published by the testing agency)
  • International Building Code (IBC), 2018 edition, ICC (not allowed in the exam room)
  • Carpentry and Building Construction, 2016 student edition, Feirer and Feirer, McGraw-Hill (not allowed)
  • Modern Masonry: Brick, Block, Stone, 9th edition (2020), Goodheart-Willcox (not allowed)
  • Contractor's Guide to Quality Concrete Construction, 4th edition, 2018, ACI (not allowed)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Plan Reading and Estimating8
Sitework and Foundations8
Concrete16
Carpentry14
Associated Trades16
Roofing6
Safety OSHA6
Thermal and Moisture Protection6

Exam day details

  • Administered by PSI Services for the Hawaii Contractors License Board.
  • Fee: $85 to PSI. The Contractors License Board's application and license fees are separate.
  • 80 scored questions in 4 hours; 60 correct (75%) to pass. The exam is closed book.
  • Concrete covers only C-31a cement concrete; roofing covers only C-42a metal shingles and C-42b wood shingles and shakes.
  • The Board must approve your application before you can register with PSI. Your eligibility lasts 6 months, and you can test as often as you like within it.
  • PSI may add up to 10 unscored pretest questions; they do not count against your time.
  • Closed-book and open-book rules are on each exam page. PSI provides an online calculator, or you can bring a silent, non-programmable one.

Frequently asked questions

What's on the Hawaii B general building exam?

80 scored questions: concrete 16, associated trades (finishes, windows and doors) 16, carpentry 14, plan reading and estimating 8, sitework and foundations 8, roofing 6, safety OSHA 6 and thermal and moisture protection 6.

Which code edition is on the exam?

The 2018 International Building Code, with the textbooks on PSI's outline.

Do I also take Business and Law?

Yes, if you are a new applicant.

Free questions with answers

Show all 10 free questions and answers
  1. A concrete block wall is 40 ft long and 8 ft high. It has two 3 ft by 7 ft door openings and one 4 ft by 4 ft window opening. Using 1.125 standard 8 x 16 in. blocks per square foot of wall, about how many blocks are needed?

    Answer: 295 blocks

    Gross wall = 40 x 8 = 320 sq ft. Openings = 2 x 21 + 16 = 58 sq ft. Net = 320 - 58 = 262 sq ft. 262 x 1.125 = 294.75, round up to 295. 360 ignores the openings, 262 forgets to convert area to block count, and 342 deducts only the window.

    Reference: General practice: masonry unit takeoff, Block count per square foot of wall

  2. The finished grade next to a foundation wall must slope away from the building. What is the minimum fall required in the first 10 feet measured perpendicular to the wall, in the standard case?

    Answer: 6 inches

    Section 1804.4 requires a slope of at least 1 unit in 20 (5 percent) for 10 feet. 10 ft = 120 in, and 120 x 0.05 = 6 in. Twelve inches would be a 10 percent slope; 2.4 in is a 2 percent slope, which applies only to swales and where the section's exceptions allow it.

    Reference: 2018 International Building Code, Section 1804.4

  3. For a Group R-3 building not more than three stories above grade, what is the minimum specified compressive strength for concrete in foundation walls and other vertical surfaces exposed to the weather, per the exception in Section 1904.1?

    Answer: 3,000 psi

    The exception to Section 1904.1 sets f'c of not less than 3,000 psi for basement walls, foundation walls, exterior walls and other vertical surfaces exposed to weather in Group R-2 and R-3 occupancies of three stories or less. The 2,500 psi value is the minimum for Class F0 nonstructural concrete in Section 1904.2.

    Reference: 2018 International Building Code, Section 1904.1, Exception

  4. Shotcrete is cured under Section 1908.9. For how long must final curing continue if ordinary cement is used and no earlier strength test shows the specified strength has been reached?

    Answer: 7 days

    Section 1908.9.2 requires final curing to continue for seven days after shotcreting, or three days where high-early-strength cement is used, or until the specified strength is obtained. Shotcrete is kept above 40 degrees F and moist during these periods.

    Reference: 2018 International Building Code, Section 1908.9.2

  5. What is the largest notch permitted in a 2 x 4 stud (3 1/2 inches actual width) in an exterior bearing wall of conventional light-frame construction?

    Answer: 7/8 inch (25 percent of the width)

    Section 2308.5.9 permits notches up to 25 percent of the stud width in exterior and bearing walls: 3.5 x 0.25 = 0.875 in. The 40 percent figure (1.4 in) applies only to nonbearing partitions carrying no load other than their own weight.

    Reference: 2018 International Building Code, Section 2308.5.9

  6. What is the minimum clear opening width of a door that is part of a required means of egress under Section 1010.1.1, in the general case?

    Answer: 32 inches, measured with the door open 90 degrees

    Section 1010.1.1 requires a minimum clear opening width of 32 inches, measured between the face of the door and the stop with the door open 90 degrees. A standard 3-foot door usually meets this, while a 2-foot-8 door often does not once hinge and stop dimensions are deducted.

    Reference: 2018 International Building Code, Section 1010.1.1

  7. What is the minimum headroom clearance for a stairway, measured vertically from a line connecting the nosings, in the general case under Section 1011.3?

    Answer: 80 inches

    Section 1011.3 requires at least 80 inches (6 feet 8 inches) of continuous headroom above the stairway, measured from the line connecting the nosing edges. Spiral stairways may have 78 inches.

    Reference: 2018 International Building Code, Section 1011.3

  8. What is the minimum roof slope for installing metal roof shingles under Section 1507.5.2?

    Answer: 3 units vertical in 12 units horizontal

    Section 1507.5.2 does not permit metal roof shingles on slopes below 3:12 (25 percent slope). The 2:12 and 1/4:12 values are low-slope figures for other coverings (asphalt shingles with double underlayment, and metal roof panels), not metal shingles; 4:12 is the minimum for wood shakes.

    Reference: 2018 International Building Code, Section 1507.5.2

  9. The same 1,200-square-foot crawl space has its ground surface covered by a Class I vapor retarder. What minimum net area of ventilation openings applies?

    Answer: 0.8 square foot

    Section 1202.4.1.2 reduces the under-floor ventilation requirement to 1 square foot per 1,500 square feet of crawl space when the ground surface is covered with a Class I vapor retarder: 1,200 / 1,500 = 0.8 sq ft. Using 1/150 (Section 1202.4.1.1, uncovered earth) gives 8 sq ft, and 1.2 and 12 sq ft come from dividing by 1,000 and 100.

    Reference: 2018 International Building Code, Section 1202.4.1.2

  10. Each employee on a scaffold must be protected from falling to a lower level when the platform is more than what height above the lower level, under 29 CFR 1926.451(g)(1)?

    Answer: 10 feet

    Section 1926.451(g)(1) requires fall protection for employees on a scaffold more than 10 feet above a lower level. This is different from the 6-foot trigger for other construction work in 1926.501(b)(1).

    Reference: 29 CFR Part 1926, 29 CFR 1926.451(g)(1)