Florida licensing exam

Florida Residential Contractor Project Management Exam: Practice Test & Licensing Guide

The Project Management exam for Florida certified residential contractors: 45 questions on construction methods and materials, safety and reading plans. Open book, 70% to pass.

Questions
45
Time limit
4.5 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Methods, Materials, Tools, Equipment

A crew is placing a 28 ft by 32 ft slab-on-grade for a new single-family house. The slab is 4 inches thick and the supplier recommends ordering 10 percent extra for waste and spillage. How many cubic yards should be ordered?

Requirements at a glance

AgencyFlorida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams
ExperienceAbout 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR.
ExamsBusiness and Finance, Contract Administration and Project Management (45 questions, 4.5 hours, 70%)
Books allowedContractors Manual, AIA A201/A401/A701, Principles and Practices of Commercial Construction 11th Edition, 2023 Florida Building Code volumes and 29 CFR 1926
Fees$135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009

Candidates for CILB certification as a residential contractor, in addition to Business and Finance and Contract Administration.

How to get licensed, step by step

  1. Check the license type

    Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.

    Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)

  2. Apply to the CILB

    Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.

    Florida DBPR: construction examinations (CILB) (opens in a new tab)

  3. Register and schedule

    Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.

    Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)

How to prepare

  • The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
  • Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
  • Methods, materials, tools and equipment (64%) is nearly two thirds of the exam: tab the Florida Building Code, Residential and Building volumes.
  • Safety (18%) comes from 29 CFR 1926 and plans and specifications is another 18%.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Contractors Manual and the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Contractors Manual, Association of Builders and Contractors Institute (ABC)Essential

    On the Business and Finance, general contractor and electrical business reference lists. The 2025 edition is used from February 1, 2026.

  • Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential

    Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.

    ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)

  • 29 CFR 1926 (OSHA Construction Standards), sections on your reference list

    Trenching, scaffolds, fall protection and ladders. Print just the listed sections.

    Read free (eCFR) (opens in a new tab)

Official reference list (as published by the testing agency)
  • Contractors Manual, Association of Builders and Contractors Institute
  • AIA A201 (2017), A401 (2017) and A701 (2018)
  • Principles and Practices of Commercial Construction, 11th Edition
  • Florida Building Code 2023 (8th edition): Building, Residential, Existing Building, Accessibility and Energy Conservation
  • 29 CFR Part 1926 (OSHA construction)

What's on the exam

Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):

TopicQuestions
Methods, Materials, Tools, Equipment64
Safety18
Plans and Specifications18

The outline totals 100; the other items on the 45-question exam are unscored or unassigned.

Exam day details

  • Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
  • Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam ($40 more for Contract Administration). A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
  • 45 questions in 4.5 hours; 70% to pass.
  • Methods, materials, tools and equipment are almost two thirds of the exam.
  • The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
  • Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
  • Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
  • If you fail you may review the items you missed within 21 days. A retake needs a new application.
  • Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
  • Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.

Frequently asked questions

What is on the Florida residential contractor Project Management exam?

Methods, materials, tools and equipment 64%, safety 18% and plans and specifications 18%.

Which exams does a Florida residential contractor take?

Business and Finance, Contract Administration and Project Management, all with a 70% pass score.

Free questions with answers

Show all 10 free questions and answers
  1. A crew is placing a 28 ft by 32 ft slab-on-grade for a new single-family house. The slab is 4 inches thick and the supplier recommends ordering 10 percent extra for waste and spillage. How many cubic yards should be ordered?

    Answer: 12.2 cubic yards

    Volume = 28 x 32 x (4/12) = 896 sq ft x 0.3333 ft = 298.7 cu ft. Divide by 27 cu ft per cu yd: 298.7 / 27 = 11.06 cu yd. Add 10 percent: 11.06 x 1.10 = 12.2 cu yd. 11.1 leaves out the waste allowance, 13.3 adds 20 percent, and 10.0 subtracts 10 percent instead of adding it.

    Reference: General construction practice, Quantity takeoff: concrete volume with waste allowance

  2. A continuous wall footing for a residence is 16 inches wide, 8 inches thick and 120 ft long. How much concrete is needed before waste?

    Answer: 3.95 cubic yards

    Convert inches to feet: 16 in = 1.333 ft and 8 in = 0.667 ft. Volume = 1.333 x 0.667 x 120 = 106.7 cu ft. Divide by 27: 106.7 / 27 = 3.95 cu yd. 106.7 forgets to convert to cubic yards, 5.93 uses a 12 inch thickness, and 2.96 uses a 12 inch width.

    Reference: General construction practice, Quantity takeoff: footing concrete volume

  3. A homebuilder uses a soil-applied termiticide under a new house. Which of these correctly describes the required paperwork under Section R318.1?

    Answer: A licensed pest control company issues a Certificate of Compliance to the building department when the treatment is complete

    Section R318.1 requires registered termiticides or other approved methods and states that, once the protective treatment is complete, the licensed pest control company issues a Certificate of Compliance to the building department. The contractor does not self-certify and the inspector does not apply treatment.

    Reference: Florida Building Code, Residential, 8th Edition (2023), Section R318.1

  4. A column on a house carries 22,000 lb to a square spread footing on silty sand. No soil report is available, so the presumptive value in the Florida Building Code, Residential is used. What is the minimum footing side length?

    Answer: 3.3 ft

    Table R401.4.1 gives 2,000 psf for sand, silty sand, clayey sand, silty gravel and clayey gravel. Area = 22,000 / 2,000 = 11.0 sq ft. Side = square root of 11.0 = 3.3 ft. 2.7 ft uses the 3,000 psf gravel value (7.3 sq ft), 11.0 ft treats the area as the side, and 5.5 ft takes half of the area.

    Reference: Florida Building Code, Residential, 8th Edition (2023), Table R401.4.1

  5. A framing crew is erecting second-floor walls on a new single-family house. At what height above a lower level must a worker engaged in residential construction be protected from falling, unless an alternative method applies?

    Answer: 6 feet or more

    Section 1926.501(b)(13) requires each employee engaged in residential construction activities 6 feet or more above lower levels to be protected by guardrail systems, safety nets or personal fall arrest systems, unless another provision of paragraph (b) gives an alternative or a fall protection plan is permitted under 1926.502(k).

    Reference: 29 CFR Part 1926, 29 CFR 1926.501(b)(13)

  6. When there is no wall or parapet at least 21 inches high, what is the maximum opening width permitted in a guardrail system by the screens, mesh or other intermediate members under 1926.502(b)?

    Answer: 19 inches

    1926.502(b)(2) requires midrails, screens, mesh or intermediate structural members between the top edge and the walking surface when there is no wall or parapet at least 21 inches high. Under (b)(2)(iii) and (iv), balusters may be no more than 19 inches apart and other structural members must leave no opening more than 19 inches wide. A midrail is placed halfway between the top rail and the surface.

    Reference: 29 CFR Part 1926, 29 CFR 1926.502(b)(2)

  7. A crew will tear out old vinyl floor tile in a house built in 1974, and nobody has verified that it is free of asbestos. How must the employer treat the work under 1926.1101?

    Answer: As asbestos-containing material, with the specified work practices and trained employees

    1926.1101 covers asbestos work in construction, including removal of vinyl and asphalt flooring in buildings constructed no later than 1980 where the absence of ACM has not been verified. The employer must follow the work practices in the standard and train workers. The single-family nature of the house does not remove the employees' protection.

    Reference: 29 CFR Part 1926, 29 CFR 1926.1101(g)(8)

  8. A house floor plan is drawn at 1/4" = 1'-0". The living room's back wall scales 5-3/8 inches. How long is the wall?

    Answer: 21.5 ft

    At 1/4 inch per foot, each inch is 4 feet. 5.375 in x 4 = 21.5 ft. 43.0 ft uses the 1/8 inch scale, 10.75 ft uses a 1/2 inch scale, and 1.34 ft divides by 4 instead of multiplying.

    Reference: General construction practice, Reading drawings: architectural scales

  9. On a site plan drawn to an engineer's scale of 1 inch = 20 feet, the side property line measures 3.4 inches. What is its actual length?

    Answer: 68 ft

    Each inch is 20 ft, so 3.4 in x 20 ft = 68 ft. 6.8 ft and 680 ft are decimal slips (scales of 1 in = 2 ft and 1 in = 200 ft), and 17 ft uses 5 ft per inch instead of 20.

    Reference: General construction practice, Reading drawings: engineer's scale on site plans

  10. To check a rectangular slab layout of 28 ft by 45 ft for square, what should the diagonal measure between opposite corners?

    Answer: 53.0 ft

    The diagonal is the hypotenuse: the square root of (28 squared + 45 squared) = the square root of (784 + 2,025) = the square root of 2,809 = 53.0 ft. 73.0 ft adds the sides, and 2,809 forgets to take the square root. Both diagonals must match for the layout to be square.

    Reference: General construction practice, Basic math: right triangles and squaring a layout

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.