Florida licensing exam

Florida General Contractor Project Management Exam: Practice Test & Licensing Guide

The Project Management exam for Florida certified general contractors: 60 questions on construction methods and materials, safety and reading plans. Open book, 70% to pass.

Questions
60
Time limit
4.5 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Construction Methods, Materials, Tools, and Equipment

A 36 ft by 24 ft garage slab is to be placed 5 inches thick. How many cubic yards of concrete are needed before any waste allowance?

Requirements at a glance

AgencyFlorida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams
ExperienceAbout 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR.
ExamsBusiness and Finance, Contract Administration and Project Management (60 questions, 4.5 hours, 70%)
Books allowedContractors Manual, AIA A201/A401/A701, Principles and Practices of Commercial Construction 11th Edition, 2023 Florida Building Code volumes and 29 CFR 1926
Fees$135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009

Candidates for CILB certification as a general contractor. Building and residential contractors take a version of the same exam.

How to get licensed, step by step

  1. Check the license type

    Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.

    Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)

  2. Apply to the CILB

    Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.

    Florida DBPR: construction examinations (CILB) (opens in a new tab)

  3. Register and schedule

    Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.

    Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)

How to prepare

  • The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
  • Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
  • Construction methods, materials, tools and equipment (63%) is nearly two thirds of the exam: tab the Florida Building Code, Building and Residential volumes.
  • Safety (20%) comes from 29 CFR 1926. Plan reading (17%) means takeoffs, details and specifications.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Contractors Manual and the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Contractors Manual, Association of Builders and Contractors Institute (ABC)Essential

    On the Business and Finance, general contractor and electrical business reference lists. The 2025 edition is used from February 1, 2026.

  • Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential

    Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.

    ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)

  • 29 CFR 1926 (OSHA Construction Standards), sections on your reference list

    Trenching, scaffolds, fall protection and ladders. Print just the listed sections.

    Read free (eCFR) (opens in a new tab)

Official reference list (as published by the testing agency)
  • Contractors Manual, Association of Builders and Contractors Institute
  • AIA A201 (2017), A401 (2017) and A701 (2018)
  • Principles and Practices of Commercial Construction, 11th Edition
  • Florida Building Code 2023 (8th edition): Building, Residential, Existing Building, Accessibility and Energy Conservation
  • 29 CFR Part 1926 (OSHA construction)

What's on the exam

Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):

TopicQuestions
Construction Methods, Materials, Tools, and Equipment63
Safety20
Reading Plans and Specifications17

The outline totals 100; the other items on the 60-question exam are unscored or unassigned.

Exam day details

  • Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
  • Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam ($40 more for Contract Administration). A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
  • 60 questions in 4.5 hours; 70% to pass.
  • Construction methods, materials, tools and equipment are almost two thirds of the exam.
  • The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
  • Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
  • Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
  • If you fail you may review the items you missed within 21 days. A retake needs a new application.
  • Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
  • Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.

Frequently asked questions

What is on the Florida GC Project Management exam?

Construction methods, materials, tools and equipment 63%, safety 20% and reading plans and specifications 17%.

Is the Project Management exam the same for building and residential contractors?

The content areas are the same, but the percentages differ slightly and the building and residential versions have their own exams, which this site also covers.

Free questions with answers

Show all 10 free questions and answers
  1. A 36 ft by 24 ft garage slab is to be placed 5 inches thick. How many cubic yards of concrete are needed before any waste allowance?

    Answer: 13.3 cubic yards

    Volume = 36 ft x 24 ft x (5 in / 12) = 864 sq ft x 0.4167 ft = 360 cubic ft. Divide by 27 cubic ft per cubic yard: 360 / 27 = 13.3 cu yd. 160 results from leaving the thickness in inches, 40 from dividing by 9 instead of 27, and 16 from rounding 5 inches to 0.5 ft.

    Reference: General construction practice, Quantity takeoff: concrete volume (cubic yards)

  2. A basement excavation is 60 ft by 40 ft and 6 ft deep, measured in place (bank volume). The soil swells 25 percent when excavated, and each truck hauls 12 loose cubic yards. How many truckloads are needed to haul all of it away?

    Answer: 56 loads

    Bank volume = 60 x 40 x 6 = 14,400 cu ft / 27 = 533.3 bank cu yd. Loose volume = 533.3 x 1.25 = 666.7 loose cu yd. 666.7 / 12 = 55.6, so 56 loads. 45 loads ignores swell (533.3 / 12), 34 wrongly shrinks the soil by 25 percent, and 67 applies 50 percent swell.

    Reference: General construction practice, Earthwork: cut and fill, swell factor

  3. The earthwork specification requires fill to be compacted to at least 95 percent of maximum dry density. The Proctor test gives a maximum dry density of 120 pcf, and a field density test on a lift shows 108 pcf dry density. What is the relative compaction, and does the lift pass?

    Answer: 90 percent; it fails and must be recompacted

    Relative compaction = field dry density / maximum dry density = 108 / 120 = 0.90, or 90 percent. That is below the 95 percent requirement, so the lift is reworked and retested. Dividing the other way (120 / 108 = 111 percent) is a common slip, and subtracting the densities (12 pcf) is not a percentage at all.

    Reference: General construction practice, Earthwork quality control: field density versus Proctor maximum

  4. Under Section 1609.1.2, a glazed opening in a wind-borne debris region is located 20 feet above grade. Which missile test must the opening protection meet?

    Answer: The large missile test of ASTM E1996

    Glazed openings within 30 feet of grade must meet the large missile test of ASTM E1996, because debris is heavier at low levels. Above 30 feet, the small missile test applies. A 20 foot opening is below the 30 foot threshold.

    Reference: Florida Building Code, Building, 8th Edition (2023), Section 1609.1.2

  5. At what height above a lower level must construction employees on an unprotected side or edge of a walking/working surface be protected from falling under the general OSHA rule?

    Answer: 6 feet

    29 CFR 1926.501(b)(1) requires fall protection for each employee on a walking/working surface with an unprotected side or edge that is 6 feet or more above a lower level. The 4 foot figure is the general industry rule and 10 feet applies to scaffolds.

    Reference: 29 CFR Part 1926, 29 CFR 1926.501(b)(1)

  6. A floor opening 8 feet above the level below is covered with a plywood sheet. Under OSHA's rules for covers, what must be true of the cover?

    Answer: It is secured, supports at least twice the expected load, and is marked HOLE or COVER

    Section 1926.502(i) requires covers to support at least twice the weight of employees, equipment and materials that may be imposed at one time, to be secured against displacement by wind, equipment or employees, and to be color coded or marked 'HOLE' or 'COVER'.

    Reference: 29 CFR Part 1926, 29 CFR 1926.502(i)

  7. Where scaffold planks are overlapped to form a long platform and are not otherwise restrained, what is the minimum overlap, and where must it occur?

    Answer: 12 inches, over a support

    Section 1926.451(b)(7) says that overlapped platforms must overlap only over supports, by not less than 12 inches unless nailed together or otherwise restrained against movement.

    Reference: 29 CFR Part 1926, 29 CFR 1926.451(b)(7)

  8. A wall on a plan drawn at a scale of 1/4 inch = 1 foot scales 9-1/2 inches long. What is the actual length of the wall?

    Answer: 38 feet

    At 1/4 inch per foot, each inch represents 4 feet. 9.5 in x 4 ft/in = 38 ft. 19 feet uses 2 feet per inch, 76 feet uses 8 feet per inch, and 2.4 feet divides by 4 instead of multiplying.

    Reference: General construction practice, Reading drawings: architectural scales

  9. A site plan is drawn at 1 inch = 20 feet. Two corner stakes scale 3.5 inches apart on the plan. What is the distance between them on the ground?

    Answer: 70 feet

    3.5 in x 20 ft/in = 70 ft. 17.5 divides by 20, 23.5 adds 3.5 to 20, and 7 is the result of dividing 70 by 10.

    Reference: General construction practice, Reading drawings: engineer's scale on site plans

  10. A building corner is being checked for square. One side measures 24 ft and the adjacent side measures 32 ft. What should the diagonal measure between the two points?

    Answer: 40 feet

    This is a 3-4-5 right triangle multiplied by 8 (24-32-40). Using the Pythagorean theorem, the diagonal = square root of (24 squared + 32 squared) = square root of (576 + 1,024) = square root of 1,600 = 40 ft. 56 adds the sides, and the other values are not the hypotenuse.

    Reference: General construction practice, Basic math: right triangles and squaring a layout

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.