Requirements at a glance
| Agency | Florida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams |
|---|---|
| Experience | About 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR. |
| Exams | Business and Finance, Contract Administration (60 questions, 4.5 hours, 70%) and Project Management |
| Books allowed | Contractors Manual, AIA A201/A401/A701, Principles and Practices of Commercial Construction 11th Edition, 2023 Florida Building Code volumes and 29 CFR 1926 |
| Fees | $135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009 |
Candidates for CILB certification as a general contractor. Building and residential contractors take a version of the same exam.
Official links
How to get licensed, step by step
Check the license type
Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.
Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Apply to the CILB
Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.
Florida DBPR: construction examinations (CILB) (opens in a new tab)
Register and schedule
Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.
Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
- Project contracts (40%) and preconstruction activities (27%) are two thirds of the exam. Tab the AIA A201, A401 and A701 documents.
- Permits and approvals (20%) draw on the Florida Building Code administration chapters and Chapter 489.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Contractors Manual and the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Contractors Manual, Association of Builders and Contractors Institute (ABC)Essential
On the Business and Finance, general contractor and electrical business reference lists. The 2025 edition is used from February 1, 2026.
Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential
Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.
ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- Contractors Manual, Association of Builders and Contractors Institute
- AIA A201 (2017), A401 (2017) and A701 (2018)
- Principles and Practices of Commercial Construction, 11th Edition
- Florida Building Code 2023 (8th edition): Building, Residential, Existing Building, Accessibility and Energy Conservation
- 29 CFR Part 1926 (OSHA construction)
What's on the exam
Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Preconstruction Activities | 27 | |
| Project Contracts | 40 | |
| Obtaining Licenses, Permits and Approvals | 20 | |
| Construction Procedures and Operations | 13 |
The outline totals 100; the other items on the 60-question exam are unscored or unassigned.
Exam day details
- Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
- Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam ($40 more for Project Management). A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
- 60 questions in 4.5 hours; 70% to pass.
- General contractors take Business and Finance, Contract Administration and Project Management. Each passed part is valid for four years.
- The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
- If you fail you may review the items you missed within 21 days. A retake needs a new application.
- Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
- Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.
Frequently asked questions
What is on the Florida GC Contract Administration exam?
Project contracts 40%, preconstruction activities 27%, obtaining licenses, permits and approvals 20% and construction procedures and operations 13%.
Which exams does a Florida general contractor take?
Business and Finance, Contract Administration and Project Management, all with a 70% pass score.
Free questions with answers
Show all 10 free questions and answers
A contractor's estimated direct and indirect cost for a job is $120,000. The company adds a 15% markup on cost. What is the bid price?
Answer: $138,000
Markup is applied to cost: $120,000 x 0.15 = $18,000, and $120,000 + $18,000 = $138,000. Dividing cost by 0.85 ($141,176) treats 15% as a margin on selling price. Quoting only $18,000 stops before adding the markup to the cost.
Reference: General construction estimating practice, Markup on cost: bid price calculation
A contract calls for liquidated damages of $750 per calendar day. Substantial completion was due March 1 and was actually reached March 22 of the same year. What is the total assessed?
Answer: $15,750
March 1 to March 22 is 21 calendar days late. 21 x $750 = $15,750. Counting 22 days gives $16,500, counting 20 gives $15,000, and $2,250 charges only three days (one per week).
Reference: General construction estimating practice, Liquidated damages calculation
A general contractor receives three electrical quotes whose totals differ widely. What should be done first before choosing the low quote?
Answer: Compare each quote to the plans and specifications for scope, inclusions and exclusions
Subcontractor quotes often leave out items the contract documents require. The estimator levels the bids against the same scope (fixtures, permits, temporary power, alternates) before selecting one. Price alone, averaging, or assuming the highest is complete all skip that check.
Reference: General construction management practice, Obtaining and evaluating bids: leveling subcontractor quotes
A cost-plus contract with a fixed fee pays reimbursable costs plus a $48,000 fee. The contractor estimated costs at $640,000, but they finish at $700,000 with no change in scope. What is the total owed to the contractor?
Answer: $748,000
With a fixed fee the fee does not change when cost changes: $700,000 + $48,000 = $748,000. $688,000 uses the estimated cost, $700,000 omits the fee, and $752,500 incorrectly converts the fee to a 7.5% percentage of actual cost.
Reference: General construction management practice, Types of contracts: cost-plus with a fixed fee
A guaranteed maximum price (GMP) contract sets the GMP at $2,500,000. The cost of the work comes in at $2,350,000, and the contract splits savings 70% to the owner and 30% to the contractor. How much of the savings does the contractor receive?
Answer: $45,000
Savings = $2,500,000 - $2,350,000 = $150,000. The contractor's 30% share is $150,000 x 0.30 = $45,000. $105,000 is the owner's 70% share, $150,000 is the full savings, and $75,000 assumes a 50/50 split.
Reference: General construction management practice, Types of contracts: guaranteed maximum price
Quantities for a utility trench job cannot be known until the rock depth is exposed. Which contract type best matches that uncertainty?
Answer: A unit-price contract
A unit-price contract pays each unit actually installed at the stated rate, so the price follows the real quantity. A lump sum forces the contractor to guess the quantity and carry the risk, and the other forms address cost or delivery method rather than unknown quantities.
Reference: General construction management practice, Types of contracts: unit cost
A property owner acting as owner-builder under s. 489.103(7) wants to build a commercial building on the owner's land for the owner's own use. What is the maximum cost allowed under the exemption?
Answer: $75,000
The exemption covers farm outbuildings or one- or two-family residences for the owner's own use and not offered for sale or lease, and commercial buildings only at a cost not exceeding $75,000. The owner must also directly supervise all work not done by licensed contractors.
Reference: Florida Statutes (2025), s. 489.103(7)(a)1.
Under FBC Building s. 105.4.1, a permit becomes invalid if work is not started within a set period after issuance. What is that period?
Answer: 6 months
A permit is invalid unless work is commenced within 6 months after issuance, or if the work is suspended or abandoned for 6 months after it has begun. A new permit is then needed under 105.4.1.1.
Reference: Florida Building Code, Building, 8th Edition (2023), FBC Building 8th ed., s. 105.4.1
A project has four activities. A (3 days) must finish before B (5 days) and C (4 days) can start, and both B and C must finish before D (2 days) can start. What is the project duration and the total float of activity C?
Answer: 10 days duration; C has 1 day of float
Path A-B-D = 3 + 5 + 2 = 10 days. Path A-C-D = 3 + 4 + 2 = 9 days. The longest path (A-B-D) controls, so the duration is 10 days. Activity C can slip 10 - 9 = 1 day without delaying the end date.
Reference: General construction management practice, Critical Path Method: duration and float
A network has these activities: A (4 days, no predecessor); B (6 days, after A); C (3 days, after A); D (5 days, after B); E (2 days, after both C and D). What is the total float of activity C?
Answer: 8 days
Forward pass: A finishes day 4; B day 10; C day 7; D day 15; E starts day 15 and finishes day 17. Backward pass: E must start by day 15, so C must finish by day 15. Float of C = 15 - 7 = 8 days. Path A-B-D-E (17 days) is critical, so C's float is not zero.
Reference: General construction management practice, Critical Path Method: forward and backward pass
Sources
- Florida DBPR: construction examinations (CILB) (opens in a new tab)
- Professional Testing, Inc. (Florida construction exam registration) (opens in a new tab)
- Pearson VUE: Florida construction exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.