Requirements at a glance
| Agency | Florida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams |
|---|---|
| Experience | About 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR. |
| Exams | Business and Finance plus Mechanical Contractor trade knowledge (130 questions, 7.5 hours, 70%) |
| Books allowed | The Air Conditioning reference list plus NFPA 99 (2021) and the Florida Building Code Fuel Gas 2023 |
| Fees | $135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009 |
Candidates for CILB certification as a mechanical contractor, in addition to Business and Finance.
Official links
How to get licensed, step by step
Check the license type
Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.
Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Apply to the CILB
Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.
Florida DBPR: construction examinations (CILB) (opens in a new tab)
Register and schedule
Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.
Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
- Installation of mechanical systems and mechanical equipment (14% each) are the largest sections, followed by HVAC installation (12%).
- Tab the FBC Mechanical and Fuel Gas chapters, NFPA 99 chapters 3 and 5 and the SMACNA duct standards.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential
Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.
ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- Florida Building Code, Mechanical, 2023 (8th edition)
- Florida Building Code, Energy Conservation, 2023 (8th edition)
- NFPA 90A (2015), NFPA 90B (2024) and NFPA 96 (2021)
- SMACNA Fibrous Glass Duct Construction Standards, 8th Edition; HVAC Duct Construction Standards, 4th Edition; Energy Systems Analysis and Management, 2nd Edition; and the Trane Ductulator
- Refrigeration and Air Conditioning Technology, 9th Edition
- Air Conditioning and Refrigeration Troubleshooting Handbook, 2nd Edition; Pipefitters Handbook, 3rd Edition; Energy Efficient Building Construction in Florida (2024); Contractors Manual (2025); 29 CFR Part 1926
- NFPA 99 (2021), chapters 3 and 5 and Annexes A and C
- Florida Building Code, Fuel Gas, 2023 (8th edition)
What's on the exam
Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Pre-Installation and Design Engineering | 9 | |
| Ductwork and HVAC Materials | 9 | |
| Installation of Refrigeration and HVAC Systems | 12 | |
| Installation of Mechanical Systems | 14 | |
| Installation of Refrigeration and HVAC Equipment and Components | 9 | |
| Installation of Mechanical Equipment and Components | 14 | |
| Maintenance Analysis | 9 | |
| Maintenance Service | 5 | |
| Safety and Equipment | 9 | |
| Excavating | 2 | |
| Energy Management | 5 | |
| Indoor Air Quality | 3 |
The outline totals 100; the other items on the 130-question exam are unscored or unassigned.
Exam day details
- Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
- Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam. A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
- 130 questions in 7.5 hours; 70% to pass.
- Mechanical systems and equipment installation (28%) is weighted alongside HVAC installation (21%).
- The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
- If you fail you may review the items you missed within 21 days. A retake needs a new application.
- Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
- Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.
Frequently asked questions
What is on the Florida mechanical contractor exam?
Installation of mechanical systems and mechanical equipment and components 14% each, installation of refrigeration and HVAC systems 12%, pre-installation and design engineering, ductwork and materials, HVAC equipment and components, maintenance analysis and safety 9% each, maintenance service and energy management 5%, indoor air quality 3% and excavating 2%.
How is the mechanical exam different from Air Conditioning Class A?
It has the same 130 questions and 7.5 hours, adds mechanical systems and equipment, excavating and design engineering, and its reference list adds NFPA 99 and the Florida Building Code, Fuel Gas.
Free questions with answers
Show all 10 free questions and answers
A domestic dryer exhaust run has 20 feet of straight 4-inch duct and two 4-inch-radius mitered 90-degree elbows, and the dryer manufacturer gives no fitting equivalent lengths. Using the Table 504.9.4.1 values and the 35-foot specified-length method, what is the maximum additional straight duct that may be added?
Answer: 5 feet
Each mitered 90-degree elbow counts as 5 feet of equivalent length (Table 504.9.4.1). Two elbows = 10 feet, so 20 + 10 = 30 feet of the 35-foot maximum (Section 504.9.4.1) is used, leaving 5 feet. 15 feet ignores the elbows entirely (35 - 20), and 10 feet counts only the elbows.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 504.9.4.1 and Table 504.9.4.1
Where must the midpoint of a steam boiler's water-gauge glass be located?
Answer: At the normal boiler water level
Section 1010.2.1 requires the gauge glass to be installed so its midpoint is at the normal boiler water level, so an operator can see a drop or rise from normal.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 1010.2.1
A refrigerant line is run exposed across a warehouse aisle that workers walk through, hung below the roof framing rather than tight to the ceiling. What is the lowest it may be above the floor?
Answer: 7 feet 3 inches
Section 1107.2 requires piping across an open passageway to be at least 7 feet 3 inches above the floor unless it is located against the ceiling of that space. (Section 1109.2.1 in the 9th ed., which keeps 7 feet 3 inches but drops the against-the-ceiling wording.)
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 1107.2
A mechanical dial gauge is used to measure a gas piping test at 10 psig. What is the highest full-scale reading the code allows for the gauge?
Answer: 50 psig
Section 406.4 requires the highest end of a mechanical gauge scale to be not greater than five times the test pressure: 5 x 10 = 50 psig.
Reference: 2023 Florida Building Code, Fuel Gas (8th edition), Section 406.4
Custom-designed lifting accessories such as hooks, grabs and clamps for lifting prefabricated mechanical modules must be marked with their safe working load. What additional step does OSHA require before use?
Answer: Proof-testing to 125 percent of the rated load
29 CFR 1926.251(a)(4) requires special custom-designed grabs, hooks, clamps and similar lifting accessories to be marked with safe working loads and proof-tested prior to use to 125 percent of their rated load.
Reference: 29 CFR 1926 (July 1, 2025), 29 CFR 1926.251(a)(4)
An air handler moves 2,500 cfm and removes 18 degrees F of sensible heat; the humidity ratio of the air drops 25 grains per pound. Using Qs = 1.08 x cfm x delta T and QL = 0.68 x cfm x delta W (grains/lb), what is the sensible heat factor?
Answer: 0.53
Qs = 1.08 x 2,500 x 18 = 48,600 Btu/h. QL = 0.68 x 2,500 x 25 = 42,500 Btu/h. Total = 91,100 Btu/h and SHF = 48,600 / 91,100 = 0.53. 0.47 is the latent fraction; 1.14 is sensible divided by latent.
Reference: Trade engineering practice (standard HVAC design formula), Sensible and latent heat equations; SHF = Qs / Qtotal
A 24-inch by 10-inch rectangular supply duct carries 2,400 cfm. What is the average air velocity?
Answer: 1,440 fpm
Area = 24 x 10 / 144 = 1.667 square feet. Velocity = cfm / area = 2,400 / 1.667 = 1,440 fpm. Using 20 square feet (dividing the inch dimensions by 12 only) gives 120 fpm.
Reference: Trade engineering practice (standard HVAC design formula), Velocity = cfm / area
Three-phase supply voltages at a 208-volt chiller disconnect are measured at 205, 208 and 214 volts. What is the percent voltage imbalance, using maximum deviation from the average divided by the average?
Answer: About 2.4 percent
Average = (205 + 208 + 214) / 3 = 209 V. The largest deviation from the average is 214 - 209 = 5 V (205 is 4 V away). 5 / 209 x 100 = 2.39 percent. 4.3 percent uses the 9 V spread, 1.4 percent uses 3 V, and 0.5 percent uses only the smallest deviation (1 V).
Reference: Trade practice (standard HVAC service formula), Voltage imbalance = max deviation / average x 100
A belt on a blower has a 24-inch span between pulley centers. Using the common rule of 1/64 inch of deflection per inch of span, how much deflection under moderate thumb pressure indicates correct tension?
Answer: About 3/8 inch
24 inches x 1/64 inch = 0.375 inch, or 3/8 inch. The belt maker's data takes priority where it is available.
Reference: Trade practice (standard HVAC service formula), V-belt tension deflection rule
Under the commercial energy provisions, what minimum deadband must zone thermostatic controls be capable of providing where they control both heating and cooling?
Answer: At least 5 degrees F
Section C403.2.4.1.2 requires a temperature range or deadband of at least 5 degrees F within which heating and cooling energy to the zone can be shut off or reduced to a minimum, unless a listed exception applies.
Reference: 2023 Florida Building Code, Energy Conservation (8th edition), Section C403.2.4.1.2
Sources
- Florida DBPR: construction examinations (CILB) (opens in a new tab)
- Professional Testing, Inc. (Florida construction exam registration) (opens in a new tab)
- Pearson VUE: Florida construction exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.