Requirements at a glance
| Agency | Florida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams |
|---|---|
| Experience | About 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR. |
| Exams | Business and Finance plus Air Conditioning Class A trade knowledge (130 questions, 7.5 hours, 70%) |
| Books allowed | Florida Building Code Mechanical and Energy Conservation 2023, NFPA 90A/90B/96, SMACNA duct standards, Refrigeration and Air Conditioning Technology 9th Edition and the Trane Ductulator |
| Fees | $135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009 |
Candidates for CILB certification as a Class A air conditioning contractor, in addition to Business and Finance.
Official links
How to get licensed, step by step
Check the license type
Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.
Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Apply to the CILB
Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.
Florida DBPR: construction examinations (CILB) (opens in a new tab)
Register and schedule
Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.
Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
- Installation of systems (23%) and equipment components (14%) are the biggest sections, followed by pre-installation and maintenance service (14% each).
- Practice duct sizing with the Ductulator and know the FBC Mechanical chapters on ducts, refrigeration and equipment.
- The 9th edition of the Florida Building Code takes effect December 31, 2026, and the 2027 lists move Mechanical and Energy to 2026 editions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential
Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.
ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- Florida Building Code, Mechanical, 2023 (8th edition)
- Florida Building Code, Energy Conservation, 2023 (8th edition)
- NFPA 90A (2015), NFPA 90B (2024) and NFPA 96 (2021)
- SMACNA duct standards and the Trane Ductulator
- Refrigeration and Air Conditioning Technology, 9th Edition
- Air Conditioning and Refrigeration Troubleshooting Handbook, 2nd Edition; Pipefitters Handbook, 3rd Edition; 29 CFR Part 1926
What's on the exam
Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Pre-Installation | 14 | |
| Sheet Metal Ducts | 9 | |
| Installation of Refrigeration and HVAC Systems | 23 | |
| Installation of Refrigeration and HVAC Equipment Components | 14 | |
| Maintenance Analysis | 9 | |
| Maintenance Service | 14 | |
| Safety and Equipment | 9 | |
| Energy Management | 5 | |
| Indoor Air Quality | 3 |
The outline totals 100; the other items on the 130-question exam are unscored or unassigned.
Exam day details
- Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
- Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam. A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
- 130 questions in 7.5 hours; 70% to pass.
- Installation of systems and equipment components are 37% of the exam.
- The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
- If you fail you may review the items you missed within 21 days. A retake needs a new application.
- Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
- Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.
Frequently asked questions
What is on the Florida Class A air conditioning exam?
Installation of refrigeration and HVAC systems 23%, pre-installation 14%, equipment components 14%, maintenance service 14%, sheet metal ducts 9%, maintenance analysis 9%, safety and equipment 9%, energy management 5% and indoor air quality 3%.
What is the difference between Class A and Class B?
Class B is a separate CILB exam with 80 questions and slightly different topic weights; see our Class B page. Class B covers systems up to 25 tons of cooling and 500,000 Btu of heating.
Free questions with answers
Show all 10 free questions and answers
An attic contains an air handler that must be reached through an access passageway. What is the maximum length of that passageway, measured along its centerline from the opening to the appliance, when the standard passageway requirements apply (no exception for a taller passageway)?
Answer: 20 feet
Section 306.3 limits the attic passageway to 20 feet, with at least 30 inches of height, 22 inches of width and continuous solid flooring 24 inches wide. The 50-foot limit applies only under the exception where the passageway is unobstructed, at least 6 feet high and 22 inches wide for its entire length.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 306.3
Using the minimum sheet metal thickness table for ducts in single dwelling units, what is the minimum galvanized steel thickness for a 16-inch round duct operating at 1-inch water gage static pressure?
Answer: 0.019 inch
Table 603.4 lists round ducts 15 to 17 inches in diameter at 1-inch water gage as 0.019 inch galvanized (0.027 inch aluminum). The 0.016 inch value is the same size range at 1/2-inch water gage, and 0.024 inch is the 18 to 20 inch size at 1 inch.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Table 603.4
Refrigerant piping crosses an open space in a commercial building that people use as a passageway. What is the minimum height above the floor, unless the piping is against the ceiling?
Answer: 7 feet 3 inches
Section 1107.2 requires refrigerant piping that crosses an open space affording passageway to be at least 7 feet 3 inches above the floor unless it is located against the ceiling. Piping may also not be placed in elevator or dumbwaiter shafts or in enclosed stairways and means of egress. (Section 1109.2.1 in the 9th ed., which keeps 7 feet 3 inches but drops the against-the-ceiling wording.)
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 1107.2
A technician pressure tests a new field-erected split system with high-pressure and low-pressure sides. Which test medium does the mechanical code allow?
Answer: Dry nitrogen
Section 1108.2 requires tests to use an inert dried gas such as nitrogen or carbon dioxide. Oxygen, air, combustible gases and mixtures containing them are not permitted, except that air is allowed for ammonia systems that are evacuated before charging. (Section 1110.3 in the 9th ed., which still lists nitrogen but limits carbon dioxide to R-744 systems.)
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 1108.2
Where must stop valves go on a system with over 6.6 pounds of refrigerant and positive-displacement compressors, when no exception applies?
Answer: At each compressor inlet and at each compressor, condensing unit and receiver discharge
Section 1107.8 requires stop valves at the inlet of each compressor, compressor unit or condensing unit and at the discharge outlet of each compressor, compressor unit, condensing unit and liquid receiver. Exceptions include self-contained systems and those with pumpdown or recovery provisions.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Section 1107.8
A portable ladder is used to reach an upper landing. How far must the ladder side rails extend above the upper landing surface?
Answer: At least 3 feet
Section 1926.1053(b)(1) requires side rails of a portable ladder to extend at least 3 feet above the upper landing surface, or the ladder must be secured at its top to a rigid support with a grasping device such as a grabrail provided.
Reference: 29 CFR Part 1926 (July 1, 2025), 1926.1053(b)(1)
An R-410A evaporator operates with a measured suction line temperature of 55 degrees F at the service valve. The evaporator saturation temperature, read from the suction pressure, is 40 degrees F. What is the superheat?
Answer: 15 degrees F
Superheat = suction line temperature - evaporator saturation temperature = 55 - 40 = 15 degrees F. Adding the two gives 95, and 40 is just the saturation temperature read from the gauge.
Reference: Standard HVAC/R service calculation, Superheat = suction line temperature - saturation temperature
A system has been evacuated to 500 microns, then the vacuum pump valve is closed. The micron gauge rises quickly and levels off at about 2,500 microns. What does this typically indicate?
Answer: Moisture still in the system (it levels off), not a leak
A rise that levels off at a value well above the target points to boiling moisture or refrigerant dissolved in oil, which means further evacuation (possibly with a nitrogen break) is needed. A leak causes the reading to keep rising toward atmospheric pressure (760,000 microns). A system is considered dry only when it holds near the target.
Reference: Standard HVAC/R service practice, Vacuum decay test interpretation
A supply fan motor draws 10 horsepower at full speed. A variable frequency drive reduces fan speed to 80 percent. Using the fan affinity law (power varies with the cube of speed), what is the new power?
Answer: About 5.1 horsepower
Power ratio = (0.80)^3 = 0.512, so power = 10 x 0.512 = 5.12 hp. 8.0 hp assumes power is proportional to speed, 6.4 hp uses the square of speed (0.64), and 2.0 hp is not derived from any relationship.
Reference: Standard HVAC energy relationships, Fan affinity law: power varies with the cube of speed
Under the dwelling-unit local exhaust table, what are the minimum rates for a kitchen and for a bathroom if the fans run intermittently?
Answer: Kitchen 100 cfm; bathroom 50 cfm
Table 403.3.2.3 requires kitchens to have 100 cfm intermittent or 25 cfm continuous, and bathrooms and toilet rooms 50 cfm intermittent or 20 cfm continuous, for Group R-2, R-3 and R-4 occupancies three stories and less. The 25 and 20 cfm values apply to continuous operation.
Reference: 2023 Florida Building Code, Mechanical (8th edition), Table 403.3.2.3
Sources
- Florida DBPR: construction examinations (CILB) (opens in a new tab)
- Professional Testing, Inc. (Florida construction exam registration) (opens in a new tab)
- Pearson VUE: Florida construction exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.