Requirements at a glance
| Agency | Florida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams |
|---|---|
| Experience | About 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR. |
| Exams | Business and Finance, Contract Administration and Project Management (50 questions, 4.5 hours, 70%) |
| Books allowed | Contractors Manual, AIA A201/A401/A701, Principles and Practices of Commercial Construction 11th Edition, 2023 Florida Building Code volumes and 29 CFR 1926 |
| Fees | $135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009 |
Candidates for CILB certification as a building contractor, in addition to Business and Finance and Contract Administration.
Official links
How to get licensed, step by step
Check the license type
Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.
Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Apply to the CILB
Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.
Florida DBPR: construction examinations (CILB) (opens in a new tab)
Register and schedule
Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.
Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
- Methods, materials, tools and equipment (64%) is nearly two thirds of the exam: tab the Florida Building Code, Building and Residential volumes.
- Safety (20%) comes from 29 CFR 1926. Plans and specifications (16%) means takeoffs, details and specifications.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Contractors Manual and the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Contractors Manual, Association of Builders and Contractors Institute (ABC)Essential
On the Business and Finance, general contractor and electrical business reference lists. The 2025 edition is used from February 1, 2026.
Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential
Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.
ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- Contractors Manual, Association of Builders and Contractors Institute
- AIA A201 (2017), A401 (2017) and A701 (2018)
- Principles and Practices of Commercial Construction, 11th Edition
- Florida Building Code 2023 (8th edition): Building, Residential, Existing Building, Accessibility and Energy Conservation
- 29 CFR Part 1926 (OSHA construction)
What's on the exam
Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Methods, Materials, Tools, Equipment | 64 | |
| Safety | 20 | |
| Plans and Specifications | 16 |
The outline totals 100; the other items on the 50-question exam are unscored or unassigned.
Exam day details
- Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
- Fee: $135 to Professional Testing, Inc. when you register, plus $40 to Pearson VUE when you schedule this exam ($40 more for Contract Administration). A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
- 50 questions in 4.5 hours; 70% to pass.
- Methods, materials, tools and equipment are almost two thirds of the exam.
- The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
- If you fail you may review the items you missed within 21 days. A retake needs a new application.
- Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
- Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.
Frequently asked questions
What is on the Florida building contractor Project Management exam?
Methods, materials, tools and equipment 64%, safety 20% and plans and specifications 16%.
Which exams does a Florida building contractor take?
Business and Finance, Contract Administration and Project Management, all with a 70% pass score.
Free questions with answers
Show all 10 free questions and answers
A commercial building has a 60 ft by 45 ft slab on grade placed 6 inches thick. The contractor orders 5 percent extra concrete for waste and spillage. How many cubic yards should be ordered?
Answer: 52.5 cubic yards
Volume = 60 x 45 x (6/12) = 1,350 cu ft; 1,350 / 27 = 50.0 cu yd. Add 5 percent waste: 50.0 x 1.05 = 52.5 cu yd. 50.0 omits the waste allowance, 47.6 divides by 1.05 instead of multiplying, and 157.5 divides by 9 instead of 27 before adding waste.
Reference: General construction practice, Quantity takeoff: concrete volume with waste allowance
A column on a 3-story office building delivers a service load of 90,000 lb to a square spread footing bearing on silty sand (SM). The geotechnical report gives no bearing value, so the presumptive value in the Florida Building Code is used. What is the smallest square footing side that works, rounded up to the next 0.1 ft?
Answer: 6.8 ft
Table 1806.2 class 4 (sand, silty sand, clayey sand, silty gravel, clayey gravel) allows 2,000 psf. Area = 90,000 / 2,000 = 45 sq ft; side = square root of 45 = 6.708 ft, which rounds up to 6.8 ft. 6.7 ft rounds down and leaves the footing slightly overstressed. 5.5 ft uses 3,000 psf (class 3) and 7.8 ft uses 1,500 psf (class 5).
Reference: Florida Building Code, Building, 8th Edition (2023), Table 1806.2
Under Section 1807.2.3, what minimum safety factor must a retaining wall provide against overturning and against sliding?
Answer: 1.5 for each
Section 1807.2.3 requires retaining walls to resist the lateral action of the soil with a minimum safety factor of 1.5 for both sliding and overturning, using 1.0 times the nominal loads. A factor of 1.0 gives no margin, and the code does not use 2.0 or a split value.
Reference: Florida Building Code, Building, 8th Edition (2023), Section 1807.2.3
A basement for a retail building is 80 ft by 50 ft and 8 ft deep, measured in place. The soil swells 30 percent when excavated and each dump truck hauls 14 loose cubic yards. How many truckloads are needed to haul all the spoil off site, rounded up?
Answer: 111 loads
Bank volume = 80 x 50 x 8 = 32,000 cu ft / 27 = 1,185.2 bank cu yd. Loose volume = 1,185.2 x 1.30 = 1,540.7 loose cu yd. Loads = 1,540.7 / 14 = 110.05, so 111 loads. 85 ignores swell, 60 shrinks the soil by 30 percent instead of swelling it, and 1,541 forgets to divide by the truck size.
Reference: General construction practice, Earthwork: bank volume, swell and haul loads
A worker will cross an unprotected floor opening on a building under construction. At what height above a lower level does the OSHA rule require protection from falling through the hole (including skylights)?
Answer: More than 6 feet
29 CFR 1926.501(b)(4)(i) requires employees to be protected from falling through holes, including skylights, more than 6 feet above a lower level, using personal fall arrest systems, covers or guardrail systems. The 4 foot figure is the trench egress depth, and 10 feet is the scaffold threshold.
Reference: 29 CFR Part 1926, 29 CFR 1926.501(b)(4)(i)
What is the required top edge height of a top rail in a guardrail system on a walking/working surface?
Answer: 42 inches plus or minus 3 inches
29 CFR 1926.502(b)(1) sets the top edge height of top rails at 42 inches plus or minus 3 inches above the walking/working level, so 39 to 45 inches. 36 inches and 30 inches are below that range, and 48 inches is above it.
Reference: 29 CFR Part 1926, 29 CFR 1926.502(b)(1)
A trench 7 feet deep and 4 feet wide at the bottom is cut in Type B soil with simple slope sides at the maximum allowable slope of 1:1 (horizontal to vertical). How wide is the trench at the top?
Answer: 18 feet
Type B soil allows a 1H:1V slope (Appendix B, Table B-1). Each side runs back 7 ft x 1 = 7 ft, so top width = 4 + 7 + 7 = 18 ft. 11 feet counts one side only, 25 feet uses Type C (1.5:1), and 14.5 feet uses Type A (3/4:1).
Reference: 29 CFR Part 1926, 29 CFR 1926 Subpart P, Appendix B, Table B-1
A wall on a plan drawn at a scale of 1/4 inch = 1 foot measures 7-3/4 inches. What is the actual length of the wall?
Answer: 31 feet
At 1/4 inch per foot, each inch is 4 feet: 7.75 x 4 = 31 feet. 19 ft 4 in. uses 2.5 ft per inch, 15 ft 6 in. uses 2 ft per inch, and 62 feet uses a 1/8 inch scale.
Reference: General construction practice, Reading drawings: architect's scale
A site plan is drawn at 1 inch = 30 feet. Two property pins scale 4.5 inches apart. What is the actual distance between them?
Answer: 135 feet
Distance = 4.5 in x 30 ft per in = 135 feet. 90 feet uses 20 feet per inch, 150 feet uses 5 inches at 30, and 6.7 feet divides by 30 instead of multiplying.
Reference: General construction practice, Reading drawings: engineer's scale on site plans
A building corner is checked for square by measuring 15 ft along one wall and 20 ft along the other from the corner. What must the diagonal between those two points measure for the corner to be square?
Answer: 25 ft
A square corner forms a right triangle, so diagonal = square root of (15 squared + 20 squared) = square root of 625 = 25 ft (a 3-4-5 triangle scaled by 5). 35 ft adds the two sides, 30 ft is an arbitrary value, and 18 ft is not tied to the legs.
Reference: General construction practice, Reading drawings: squaring corners, 3-4-5 rule
Sources
- Florida DBPR: construction examinations (CILB) (opens in a new tab)
- Professional Testing, Inc. (Florida construction exam registration) (opens in a new tab)
- Pearson VUE: Florida construction exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.