Requirements at a glance
| Agency | D.C. Board of Industrial Trades, Department of Licensing and Consumer Protection (DLCP); exam by PSI |
|---|---|
| Exam | 100 multiple-choice questions, 4 hours (exam ID 304); Pass score not published; PSI reports PASS or FAIL |
| Experience | 8 years (16,000 work hours) (DLCP chart) |
| Books | Open book: bound references only, permanent tabs, notes in ink or highlighting in code sections only; no writing during the exam |
| Fees | $52 to PSI per exam; D.C. application and license fees are separate |
Plumbers applying to the Board of Industrial Trades for a D.C. master plumbing and gasfitting license. The DLCP chart lists 8 years (16,000 work hours) of experience.
Official links
How to get licensed, step by step
Meet the experience requirement
The DLCP chart lists 8 years (16,000 work hours) of experience, with tax records and an employment verification letter signed off by the master.
Apply to the District
Submit the online application and fees to the Board of Industrial Trades. Approved candidates receive a notice of eligibility.
Register with PSI
Register by phone at (855) 557-0616 or online, giving the exam ID and title. Pay the $52 exam fee by credit or debit card when you book.
Register with PSI: plumber exams (opens in a new tab)PSI: Washington D.C. Candidate Information Bulletin (8/25/2022) (opens in a new tab)
Take the exam
Bring your listed references and matching ID. You see PASS or FAIL right after the exam. To retest you must reapply with the District first.
PSI: Washington D.C. Candidate Information Bulletin (8/25/2022) (opens in a new tab)
How to prepare
- Gas is 20% of the exam (2012 IFGC: pipe sizing tables, appliance venting, combustion air), on top of the IPC areas.
- The PSI bulletin (8/25/2022) lists older editions than the District's adopted 2017 DC Construction Codes (2014 NEC, 2015 ICC codes). Confirm the current reference list with PSI (855-557-0616) or the DLCP before you buy books.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2012 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2012 International Plumbing Code (IPC), ICCEssential
The edition on the PSI bulletin (8/25/2022). Confirm the current list with PSI or the DLCP.
2012 International Fuel Gas Code (IFGC), ICC
The edition on the PSI bulletin for the gas exams (8/25/2022). Confirm the current list with PSI or the DLCP.
Official reference list (as published by the testing agency)
- 2012 International Plumbing Code (IPC)
- 2012 International Fuel Gas Code (IFGC)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Plumbing Fixtures and Terminology | 7 | |
| Plumbing Fundamentals | 13 | |
| Traps, Cleanouts, and Interceptors | 7 | |
| Special Requirements | 6 | |
| Drainage Requirements | 8 | |
| Vent Requirements | 9 | |
| Water Distribution | 7 | |
| Plan and Analysis | 23 | |
| Gas | 20 |
Exam day details
- Administered by PSI Services for the District of Columbia Board of Industrial Trades (DLCP).
- Fee: $52 to PSI per computer-based exam. D.C. application and license fees are separate.
- PSI exam ID 304: 100 multiple-choice questions, open book, 4 hours. The content outline is the PSI bulletin's.
- The bulletin's plumbing references are the 2012 IPC (and the 2012 IFGC for the gas exams); the District's adopted construction codes are newer (2015 ICC codes). Confirm the current list with PSI or the DLCP.
- The DLCP plumbing and gasfitting instructions say licenses expire March 31 of even-numbered years.
- You apply to the Board online and pay the application fees first. Approved candidates get a notice of eligibility, then register with PSI at (855) 557-0616 or on PSI's D.C. pages using the exam ID and title.
- Open book: bring only the references the bulletin lists. They must be bound (original, three-ring binder or stapled); photocopies of copyrighted material are not allowed. Notes in ink or highlighting are allowed in code sections only, and tabs must be permanently attached.
- You may not write or mark in your references during the exam. PSI gives you a whiteboard, markers and scratch paper. Bring a battery-operated, non-programmable calculator without a printer.
- Your name on the reservation must match your ID or you cannot test and forfeit the fee. Restroom breaks are limited to 5 minutes and the clock keeps running.
- You see your result right after the exam. Passing candidates are told PASS with no numeric score; candidates who fail get diagnostic feedback by content area.
- To retest you must reapply with the District before each attempt. The bulletin recommends allowing time to study before registering again.
Note: The PSI bulletin (updated 8/25/2022) lists the 2011 NEC and the 2012 IPC, IFGC and IMC, while the District's adopted construction codes are the 2017 DC Construction Codes (2014 NEC and 2015 ICC codes with D.C. amendments, effective May 29, 2020). We follow the editions on the bulletin. Confirm the current reference list with PSI (855-557-0616) or the DLCP before you buy books. No pass score is published.
Frequently asked questions
How many questions are on the D.C. master plumber with gas exam?
PSI lists 100 multiple-choice questions in 4 hours (exam ID 304), open book. The biggest areas are Plan and Analysis (23%), Gas (20%), Plumbing Fundamentals (13%).
What is the passing score?
Neither PSI nor the Board of Industrial Trades publishes a passing score. PSI shows PASS or FAIL right after the exam, with no numeric score for passing candidates and diagnostic feedback for those who fail.
Which code edition does the exam use?
PSI's bulletin lists the 2012 International Plumbing Code (and the 2012 IFGC for gas). The District has since adopted the 2015 ICC codes in the 2017 DC Construction Codes, so confirm the current reference list with PSI or the DLCP before you buy books.
Free questions with answers
Show all 10 free questions and answers
Under the 2012 IFGC, what is the minimum depth below grade for an underground gas piping system, other than an individual line to an outside appliance?
Answer: 12 inches
Section 404.12 sets the minimum burial depth for underground gas piping at 12 inches below grade. Section 404.12.1 allows only individual lines to outside lights, grills and similar appliances to be shallower (8 inches), and only where approved and not subject to physical damage. The 18- and 24-inch values are not in this section.
Reference: 2012 International Fuel Gas Code, 404.12
A coin-operated laundry has several automatic clothes washers. What is the minimum outlet diameter for the floor drains that must serve the washer room under the 2012 IPC?
Answer: 3 inches
Section 412.4 requires the rooms containing automatic clothes washers in public coin-operated laundries and in central washing facilities of multiple-family dwellings to have floor drains located to drain the entire floor, with an outlet of at least 3 inches. The ordinary 2-inch floor drain outlet of Section 412.3 does not apply to this occupancy.
Reference: 2012 International Plumbing Code, 412.4
A 2-inch trap is proposed for a fixture whose drain is 1 1/2 inches. Under Section 1002.5 of the 2012 IPC, what is the rule on trap size relative to the drain pipe?
Answer: A trap shall not be larger than the drainage pipe it discharges into
Section 1002.5 requires the trap to be large enough to drain the fixture rapidly and not smaller than the size in Table 709.1, and it also says a trap shall not be larger than the drainage pipe into which it discharges. A 2-inch trap into a 1 1/2-inch drain violates that limit.
Reference: 2012 International Plumbing Code, 1002.5
A floor drain inside a walk-in cooler at a restaurant is not protected by a backwater valve. Under Section 802.1.2 of the 2012 IPC, how must it connect to the sanitary drainage system?
Answer: Indirectly, through an air gap
Section 802.1.2 requires floor drains inside walk-in refrigerators and freezers in food service and food establishments to be indirectly connected to the sanitary drainage system by an air gap. If the drain is in an area subject to freezing, the waste line must not be trapped. Where protected by a backwater valve, an air break or air gap may be used.
Reference: 2012 International Plumbing Code, 802.1.2
Cast-iron soil pipe is installed in 10-foot lengths. Under Table 308.5 and its footnote, what is the maximum horizontal hanger spacing?
Answer: 10 feet
Table 308.5 gives 5 feet maximum horizontal spacing for cast-iron pipe. Footnote a increases that to 10 feet where 10-foot lengths of pipe are installed. The 15-foot figure is the vertical spacing for cast iron.
Reference: 2012 International Plumbing Code, 308.5; Table 308.5 note a
Two buildings on one lot are to be served by the public sewer. Under Section 701.3 of the 2012 IPC, may they share one building sewer?
Answer: Yes, multiple buildings on the same lot may connect to a common building sewer
Section 701.3 requires a building on premises abutting a public sewer to have a separate connection with the sewer, but adds that where multiple buildings are on the same lot they are not prohibited from connecting to a common building sewer that connects to the public sewer.
Reference: 2012 International Plumbing Code, 701.3
A fixture drain is 2 inches in diameter. Under Section 909.2 of the 2012 IPC, what is the most that the pipe slope may drop the fixture drain between the trap weir and the vent connection?
Answer: 2 inches, one pipe diameter
Section 909.2 says the total fall in a fixture drain due to pipe slope shall not exceed the diameter of the fixture drain, and the vent connection to a fixture drain (except for water closets) shall not be below the weir of the trap. A 2-inch fixture drain may fall at most 2 inches.
Reference: 2012 International Plumbing Code, 909.2
Underground water service pipe outside a building in a district with 120 psi street pressure must have what minimum working pressure rating under Section 605.3 of the 2012 IPC?
Answer: 160 psi at 73.4 degrees F
Section 605.3 requires water service pipe or tubing installed underground and outside of the structure to have a working pressure rating of at least 160 psi at 73.4 degrees F. Where the water pressure exceeds 160 psi, the material must be rated for not less than the highest available pressure. At 120 psi the 160 psi rating governs.
Reference: 2012 International Plumbing Code, 605.3
An office building drain laid at 1/4 inch per foot serves 12 public water closets (1.6 gpf), 8 lavatories, 4 urinals rated 1 gallon per flush or less, 2 service sinks and 3 floor drains. Using Tables 709.1 and 710.1(1), what is the smallest building drain?
Answer: 4 inches
Water closets 12 x 4 = 48, lavatories 8 x 1 = 8, urinals 4 x 2 = 8, service sinks 2 x 2 = 4 and floor drains 3 x 2 = 6, for 74 dfu. At 1/4 inch per foot a 3-inch drain carries only 42 dfu, while a 4-inch drain carries 216 dfu, so 4 inches is the smallest size.
Reference: 2012 International Plumbing Code, Table 709.1; Table 710.1(1)
A floor drain has a 3-inch trap and a fixture drain sloped 1/8 inch per foot. Using Table 909.1, what is the maximum developed length from the trap weir to the vent fitting?
Answer: 12 feet
Table 909.1 allows 5 feet for a 1 1/4-inch trap, 6 feet for 1 1/2 inches, 8 feet for 2 inches (all at 1/4 inch per foot), 12 feet for 3 inches and 16 feet for 4 inches (both at 1/8 inch per foot). The fall over 12 feet at 1/8 inch per foot is 1.5 inches, which is also within the one-diameter limit of Section 909.2.
Reference: 2012 International Plumbing Code, Table 909.1; 909.2
Sources
- PSI: Washington D.C. Contractor/Trades Examinations Candidate Information Bulletin (updated 8/25/2022) (opens in a new tab)
- D.C. Board of Industrial Trades (DLCP) (opens in a new tab)
- D.C. online license application (opens in a new tab)
- D.C. Department of Buildings: DC Construction Codes (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.