District of Columbia licensing exam

District of Columbia Journeyman Plumber with Gas Exam: Practice Test & Licensing Guide

The PSI exam for the District of Columbia journeyman plumber with gas license: 70 multiple-choice questions on the 2012 IPC and 2012 IFGC, with a 20% gas section. Open book, 4 hours.

Questions
70
Time limit
4 hours
Passing score
Not published by District of Columbia

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Gas

Exposed gas piping other than steel must be identified by a yellow label marked "Gas". What is the maximum spacing of the markings?

Requirements at a glance

AgencyD.C. Board of Industrial Trades, Department of Licensing and Consumer Protection (DLCP); exam by PSI
Exam70 multiple-choice questions, 4 hours (exam ID 310); Pass score not published; PSI reports PASS or FAIL
Experience4 years (8,000 work hours); a nationally certified apprenticeship can waive the exam (DLCP chart)
BooksOpen book: bound references only, permanent tabs, notes in ink or highlighting in code sections only; no writing during the exam
Fees$52 to PSI per exam; D.C. application and license fees are separate

Plumbers applying to the Board of Industrial Trades for a D.C. journeyman plumbing and gasfitting license. The DLCP chart lists 4 years (8,000 work hours) of experience; a nationally certified apprenticeship can waive the exam.

How to get licensed, step by step

  1. Meet the experience requirement

    The DLCP chart lists 4 years (8,000 work hours) of experience, with tax records and an employment verification letter signed off by the master.

    D.C. Board of Industrial Trades (DLCP) (opens in a new tab)

  2. Apply to the District

    Submit the online application and fees to the Board of Industrial Trades. Approved candidates receive a notice of eligibility.

    D.C. online license application (opens in a new tab)

  3. Register with PSI

    Register by phone at (855) 557-0616 or online, giving the exam ID and title. Pay the $52 exam fee by credit or debit card when you book.

    Register with PSI: plumber exams (opens in a new tab)PSI: Washington D.C. Candidate Information Bulletin (8/25/2022) (opens in a new tab)

  4. Take the exam

    Bring your listed references and matching ID. You see PASS or FAIL right after the exam. To retest you must reapply with the District first.

    PSI: Washington D.C. Candidate Information Bulletin (8/25/2022) (opens in a new tab)

How to prepare

  • Gas is 20% of the exam (2012 IFGC), alongside drainage, venting and plan reading from the 2012 IPC.
  • The PSI bulletin (8/25/2022) lists older editions than the District's adopted 2017 DC Construction Codes (2014 NEC, 2015 ICC codes). Confirm the current reference list with PSI (855-557-0616) or the DLCP before you buy books.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2012 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2012 International Plumbing Code (IPC), ICCEssential

    The edition on the PSI bulletin (8/25/2022). Confirm the current list with PSI or the DLCP.

    ICC (opens in a new tab)

  • 2012 International Fuel Gas Code (IFGC), ICC

    The edition on the PSI bulletin for the gas exams (8/25/2022). Confirm the current list with PSI or the DLCP.

    ICC (opens in a new tab)

Official reference list (as published by the testing agency)
  • 2012 International Plumbing Code (IPC)
  • 2012 International Fuel Gas Code (IFGC)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Plumbing Fixtures and Terminology5
Plumbing Fundamentals13
Traps, Cleanouts, and Interceptors4
Special Requirements4
Drainage Requirements14
Venting Requirements14
Water Distribution12
Plan Reading14
Gas20

The outline totals 100; the other items on the 70-question exam are unscored or unassigned.

Exam day details

  • Administered by PSI Services for the District of Columbia Board of Industrial Trades (DLCP).
  • Fee: $52 to PSI per computer-based exam. D.C. application and license fees are separate.
  • PSI exam ID 310: 70 multiple-choice questions, open book, 4 hours. The content outline is the PSI bulletin's.
  • The bulletin's plumbing references are the 2012 IPC (and the 2012 IFGC for the gas exams); the District's adopted construction codes are newer (2015 ICC codes). Confirm the current list with PSI or the DLCP.
  • The DLCP plumbing and gasfitting instructions say licenses expire March 31 of even-numbered years.
  • You apply to the Board online and pay the application fees first. Approved candidates get a notice of eligibility, then register with PSI at (855) 557-0616 or on PSI's D.C. pages using the exam ID and title.
  • Open book: bring only the references the bulletin lists. They must be bound (original, three-ring binder or stapled); photocopies of copyrighted material are not allowed. Notes in ink or highlighting are allowed in code sections only, and tabs must be permanently attached.
  • You may not write or mark in your references during the exam. PSI gives you a whiteboard, markers and scratch paper. Bring a battery-operated, non-programmable calculator without a printer.
  • Your name on the reservation must match your ID or you cannot test and forfeit the fee. Restroom breaks are limited to 5 minutes and the clock keeps running.
  • You see your result right after the exam. Passing candidates are told PASS with no numeric score; candidates who fail get diagnostic feedback by content area.
  • To retest you must reapply with the District before each attempt. The bulletin recommends allowing time to study before registering again.

Note: The PSI bulletin (updated 8/25/2022) lists the 2011 NEC and the 2012 IPC, IFGC and IMC, while the District's adopted construction codes are the 2017 DC Construction Codes (2014 NEC and 2015 ICC codes with D.C. amendments, effective May 29, 2020). We follow the editions on the bulletin. Confirm the current reference list with PSI (855-557-0616) or the DLCP before you buy books. No pass score is published.

Frequently asked questions

How many questions are on the D.C. journeyman plumber with gas exam?

PSI lists 70 multiple-choice questions in 4 hours (exam ID 310), open book. The biggest areas are Gas (20%), Drainage Requirements (14%), Venting Requirements (14%).

What is the passing score?

Neither PSI nor the Board of Industrial Trades publishes a passing score. PSI shows PASS or FAIL right after the exam, with no numeric score for passing candidates and diagnostic feedback for those who fail.

Which code edition does the exam use?

PSI's bulletin lists the 2012 International Plumbing Code (and the 2012 IFGC for gas). The District has since adopted the 2015 ICC codes in the 2017 DC Construction Codes, so confirm the current reference list with PSI or the DLCP before you buy books.

Free questions with answers

Show all 10 free questions and answers
  1. Exposed gas piping other than steel must be identified by a yellow label marked "Gas". What is the maximum spacing of the markings?

    Answer: 5 feet

    Section 401.5 requires a yellow label marked "Gas" in black letters on exposed non-steel gas piping, spaced at intervals not exceeding 5 feet. The marking is not required on pipe located in the same room as the appliance served.

    Reference: 2012 International Fuel Gas Code, Section 401.5

  2. A gas line is run underground to a grill on a patio. The installation is approved and is in a location not susceptible to physical damage. What is the minimum depth below finished grade for this individual outdoor appliance line?

    Answer: 8 inches

    Section 404.12 sets 12 inches as the general minimum burial depth for underground gas piping, but 404.12.1 allows individual lines to outside lights, grills and similar appliances to be 8 inches below finished grade when approved and not subject to damage. The 12-inch answer is the general rule, not the exception.

    Reference: 2012 International Fuel Gas Code, Section 404.12.1

  3. What are the minimum width and depth of a compartment for a floor-mounted water closet?

    Answer: 30 inches wide by 60 inches deep

    Section 405.3.1: water closet compartments must be at least 30 inches wide and 60 inches deep for floor-mounted water closets. The 56-inch depth is allowed only for wall-hung water closets.

    Reference: 2012 International Plumbing Code, Section 405.3.1

  4. What range of liquid seal depth must each fixture trap provide?

    Answer: Not less than 2 inches and not more than 4 inches

    Section 1002.4 requires a liquid seal of not less than 2 inches and not more than 4 inches (deeper only for special designs for accessible fixtures). Traps subject to evaporation need a trap seal primer valve connected above the level of the seal.

    Reference: 2012 International Plumbing Code, Section 1002.4

  5. A repair garage installs an oil separator. What minimum water seal must the separator's outlet opening have if it is designed under Section 1003.4.2.1?

    Answer: 18 inches

    Section 1003.4.2.1: oil separators must be at least 2 feet deep below the invert of the discharge drain and the outlet opening must have not less than an 18-inch water seal. A 6-inch seal is the sand interceptor requirement in Section 1003.5.

    Reference: 2012 International Plumbing Code, Section 1003.4.2.1

  6. What is the minimum slope for a horizontal 3-inch drainage pipe?

    Answer: 1/8 inch per foot

    Table 704.1 gives 1/4 inch per foot for pipe 2-1/2 inches or smaller, 1/8 inch per foot for 3 to 6 inch pipe, and 1/16 inch per foot for 8-inch and larger pipe.

    Reference: 2012 International Plumbing Code, Table 704.1

  7. A drainage stack has five branch intervals. What does the IPC require regarding venting?

    Answer: A vent stack

    Section 904.2 requires a vent stack for every drainage stack with five branch intervals or more. A stack vent alone is not enough once the stack reaches five intervals.

    Reference: 2012 International Plumbing Code, Section 904.2

  8. What is the minimum horizontal separation between a water service pipe and a building sewer in undisturbed or compacted earth (when no exception applies)?

    Answer: 5 feet

    Section 603.2 requires water service pipe and the building sewer to be separated by not less than 5 feet of undisturbed or compacted earth. Exceptions apply when the water pipe is at least 12 inches above the sewer, when both share a trench with an approved sewer material, or when the water pipe is sleeved at a crossing.

    Reference: 2012 International Plumbing Code, Section 603.2

  9. An air test is used on a cast-iron drainage system. What is the required test pressure and duration?

    Answer: 5 psi for 15 minutes

    Section 312.3: the air test uses a uniform gauge pressure of 5 psi (or enough to balance a 10-inch column of mercury), held at least 15 minutes. Plastic piping shall not be tested with air.

    Reference: 2012 International Plumbing Code, Section 312.3

  10. A plan shows a three-bath house: 3 bathroom groups (1.6 gpf closets), a kitchen sink with dishwasher, an automatic clothes washer (residential) and one basement floor drain, all on a single building drain laid at 1/4 inch per foot. Using Tables 709.1 and 710.1(1), what is the minimum building drain size?

    Answer: 3 inches

    Load = 3 x 5 (bathroom groups) + 2 (kitchen sink with dishwasher) + 2 (washer) + 2 (floor drain) = 21 DFU. Table 710.1(1) at 1/4 in/ft allows 21 DFU on a 2-inch drain and 24 on 2-1/2 inch, but note a requires any building drain serving a water closet to be at least 3 inches. The 3-inch drain (42 DFU at 1/4 in/ft) is the minimum.

    Reference: 2012 International Plumbing Code, Tables 709.1 and 710.1(1), note a

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.