Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | At least 2 years as a licensed journeyperson in the specific area of the trade, or equivalent experience and training DCP accepts (CGS 20-334a(a)(1)); age 18 |
| Exams | PV-1 solar electric exam: 60 questions, 150 minutes, 70% (42 items), plus the Business and Law exam |
| Books allowed | NEC or NEC Handbook (2020 or 2023), Ugly's, Dunlap Photovoltaic Systems 3rd edition, Komp Practical Photovoltaics, Pieper and Barber solar guides and 29 CFR 1926 |
| Fees | $59 per PSI exam portion; DCP $150 application fee (CGS 20-333) and $150 initial license fee (CGS 20-335); renews yearly for $150 |
Contractors with at least 2 years as a licensed journeyperson (or experience DCP accepts) applying for a Connecticut PV-1 license from the Department of Consumer Protection.
Official links
How to get licensed, step by step
Confirm you qualify
Contractor licenses need at least 2 years as a licensed journeyperson (or equivalent experience and training DCP accepts), plus both the Business and Law exam and the trade exam.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass both exam portions with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Photovoltaic theory and photovoltaic installation are 10 questions each; know NEC Articles 690, 705 and 250 for PV grounding.
- General electrical knowledge (9), estimating and design (9), components (8) and safety (7) fill out the exam; wind power is 4 questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and Ugly's. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 Edition (or the NEC Handbook; 2023 also allowed)Essential
Allowed in the exam room. Connecticut adopts the 2020 NEC with state amendments. Tab Articles 100, 110, 210, 215, 220, 230, 240, 250, 310, 314, 430, 690 and Chapter 9.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References, 2020 or 2023 EditionEssential
Allowed in the exam room. Formulas for voltage drop, power, motors and transformers.
Photovoltaic Systems, 3rd Edition (James P. Dunlop; the PSI bulletin spells it Dunlap)
Allowed in the exam room. Source for the photovoltaics section.
Practical Photovoltaics: Electricity from Solar Cells (Komp, 2002); Easy Guide to Solar Electric (Pieper); Convert Your Home to Solar Energy (Barber)
All allowed in the exam room. Photovoltaic theory, components, installation and design.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- National Electrical Code or NEC Handbook, 2020 or 2023 edition (allowed in the exam room)
- Ugly's Electrical References, 2020 or 2023 (allowed in the exam room)
- Photovoltaic Systems, 3rd Edition (2012), James Dunlap (allowed in the exam room)
- Practical Photovoltaics: Electricity from Solar Cells (2002), Richard J. Komp (allowed in the exam room)
- The Easy Guide to Solar Electric Part II Installation Manual (2001), Adi Pieper, and Convert Your Home to Solar Energy, Barber and Provey (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
- Solar Photovoltaic Systems Installer Trainee Guide, NCCER, 2012 (recommended for study; NOT allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Photovoltaic Theory | 10 | |
| General Electrical Knowledge and Theory | 9 | |
| Batteries | 3 | |
| Components | 8 | |
| Photovoltaic Installation | 10 | |
| Estimating and Design | 9 | |
| Wind Power | 4 | |
| Safety | 7 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 60 questions in 2.5 hours; 70% to pass. Open book.
- The license covers photovoltaic and wind electric generation work up to the point inside or adjacent to the structure (RCSA 20-332).
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- Passing score is 70% (42 items).
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut PV-1 exam?
60 questions: photovoltaic theory 10, photovoltaic installation 10, general electrical knowledge and theory 9, estimating and design 9, components 8, safety 7, then batteries 3 and wind power 4.
Is the PV-1 open book?
Yes. You may bring the allowed references listed on the PSI bulletin, tabbed with permanent tabs, and use a silent, non-programmable calculator.
Do I also need the Business and Law exam?
Yes. Contractor licenses need both the Business and Law exam and the PV-1 trade exam.
Free questions with answers
Show all 10 free questions and answers
Three parallel strings each contain 11 modules in series. Each module has Vmp = 30.5 V and Imp = 9.2 A. What are the array's voltage and current at maximum power?
Answer: 335.5 V and 27.6 A
Voltage of the array equals the string voltage: 11 x 30.5 = 335.5 V. Parallel strings add current: 3 x 9.2 = 27.6 A. Multiplying 335.5 V by 3 or leaving the current at 9.2 A treats the array as all-series or ignores the parallel strings.
Reference: General practice (PV systems), Series-parallel array calculations
A module is rated 365 W at STC and its area is 1.75 m2. What is its efficiency?
Answer: 20.9 percent
Efficiency = Pmax / (1000 W/m2 x area) = 365 / (1000 x 1.75) = 0.2086, or about 20.9 percent. Dividing the other way (1.75 / 365) or forgetting the 1000 W/m2 gives wrong magnitudes.
Reference: General practice (PV systems), Module efficiency
A stand-alone home uses 6 kWh per day. A 48 V battery bank must provide 3 days of autonomy without discharging below 50 percent depth of discharge. Ignoring losses, what minimum bank capacity is required?
Answer: 750 Ah
Energy needed = 6,000 Wh x 3 days = 18,000 Wh. Dividing by the usable fraction (0.50) gives 36,000 Wh of nominal storage; 36,000 / 48 V = 750 Ah. 375 Ah forgets the depth-of-discharge limit, and 1,500 Ah applies it twice.
Reference: General practice (PV systems), Battery bank sizing
A 14 A load is fed at 240 V through 10 AWG copper (1.21 ohms per 1000 ft, Chapter 9 Table 8, uncoated solid) from a source 120 ft away (one way). What is the approximate percent voltage drop?
Answer: 1.7 percent
Round-trip length = 2 x 120 = 240 ft; R = 1.21 x 240 / 1000 = 0.290 ohm; drop = 14 x 0.290 = 4.07 V; 4.07 / 240 = 1.7 percent. Using one-way length gives 0.85 percent, and stating the 4.1 V without dividing by the voltage is not a percent.
Reference: 2020 National Electrical Code (NFPA 70), Chapter 9, Table 8
In a small stand-alone system with the array wired directly to a battery, what does a series blocking diode prevent?
Answer: Current flowing from the battery back through the array when array voltage drops below battery voltage
At night, or in heavy shade, array voltage falls below battery voltage and the battery could discharge into the array. A blocking diode stops that reverse current. It does not limit array current or voltage.
Reference: General practice (PV systems), Stand-alone system components: blocking diodes
Where must the PV system disconnecting means required by 690.13 be installed?
Answer: At a readily accessible location
690.13(A) requires the PV system disconnecting means to be installed at a readily accessible location. A disconnect that can be reached only by moving equipment or climbing is not readily accessible.
Reference: 2020 National Electrical Code (NFPA 70), 690.13(A)
Underground PV conductors run in rigid metal conduit (RMC) at a one-family dwelling, with no concrete cover and no special conditions. What minimum cover does Table 300.5 require?
Answer: 150 mm (6 in.)
Table 300.5 requires 6 in. of cover for rigid metal conduit and intermediate metal conduit. Direct-buried cables need 24 in. and listed PVC raceways need 18 in. under the same conditions.
Reference: 2020 National Electrical Code (NFPA 70), Table 300.5
A ground-mounted array at a commercial building uses modules with Voc = 49.6 V at STC, and the inverter maximum dc input is 1,000 V. The lowest expected ambient temperature is -22 degrees C. Using Table 690.7(A), how many modules may be placed in series?
Answer: 16
-22 degrees C falls in the -21 to -25 row, factor 1.20. Corrected Voc = 49.6 x 1.20 = 59.52 V. 1,000 / 59.52 = 16.8, so at most 16 modules (always round down). 20 uses the uncorrected Voc (1,000 / 49.6 = 20.2), 17 rounds up, and 14 is overly conservative.
Reference: 2020 National Electrical Code (NFPA 70), 690.7(A); Table 690.7(A)
A small wind turbine has a rotor diameter of 5 m. What is its swept area?
Answer: 19.6 square meters
Swept area A = pi x D squared / 4 = 3.1416 x 25 / 4 = 19.6 m2. 78.5 m2 is pi x D squared with the divide-by-four left out, and 15.7 m2 is the circumference.
Reference: DOE WINDExchange Small Wind Guidebook, Rotor swept area: A = pi D^2 / 4
At what height above a lower level must an employee on an unprotected roof edge be protected by a guardrail, safety net or personal fall arrest system under the OSHA construction standard?
Answer: 6 feet or more
1926.501(b)(1) requires fall protection for employees on a walking/working surface with an unprotected side or edge 6 feet (1.8 m) or more above a lower level. The 4-foot trigger belongs to general industry, not construction.
Reference: 29 CFR 1926, 1926.501(b)(1)
Sources
- PSI: Connecticut Electrical Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.