Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | A completed registered apprenticeship with at least 4 years of experience in the trade, or equivalent experience and training DCP accepts (CGS 20-334a; RCSA 20-332); age 18 |
| Exams | E-2 electrical exam: 80 questions, 3.5 hours, 70% |
| Books allowed | NEC or NEC Handbook (2020 or 2023), Ugly's, NFPA 72 (2013), Dunlop Photovoltaic Systems 3rd edition, NESC 2012 and 29 CFR 1926 |
| Fees | $59 at PSI; DCP $90 application fee (CGS 20-333) and $120 initial license fee (CGS 20-335); renews yearly for $120 |
Electricians with a registered apprenticeship and at least 4 years of experience applying for a Connecticut E-2 unlimited electrical journeyperson license.
Official links
How to get licensed, step by step
Confirm you qualify
Journeyperson licenses need a completed registered apprenticeship with at least 4 years of experience (or equivalent experience and training DCP accepts), then the trade exam only.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass the trade exam with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Raceways and boxes (8) is the largest section: NEC Chapter 3 and Chapter 9 for boxes, conduit fill and bending.
- Overcurrent protection (6) and grounding and bonding (6) come from Articles 240 and 250.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and Ugly's. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 Edition (or the NEC Handbook; 2023 also allowed)Essential
Allowed in the exam room. Connecticut adopts the 2020 NEC with state amendments. Tab Articles 100, 110, 210, 215, 220, 230, 240, 250, 310, 314, 430, 690 and Chapter 9.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References, 2020 or 2023 EditionEssential
Allowed in the exam room. Formulas for voltage drop, power, motors and transformers.
NFPA 72: National Fire Alarm Code, 2013
Allowed in the exam room. Fire detection and alarm questions.
Photovoltaic Systems, 3rd Edition (James P. Dunlop; the PSI bulletin spells it Dunlap)
Allowed in the exam room. Source for the photovoltaics section.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code or NEC Handbook, 2020 or 2023 edition (allowed in the exam room)
- Ugly's Electrical References, 2020 or 2023 (allowed in the exam room)
- NFPA 72: National Fire Alarm Code, 2013 (allowed in the exam room)
- Photovoltaic Systems, 3rd edition, James Dunlop (allowed in the exam room)
- National Electrical Safety Code, 2012 edition (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Electrical Knowledge | 7 | |
| Service, Feeders, and Branch Circuits | 7 | |
| Grounding and Bonding | 6 | |
| Conductors and Cables | 7 | |
| Raceways and Boxes | 8 | |
| Special Occupancies and Equipment | 5 | |
| Electrical Power | 4 | |
| Motors | 5 | |
| Low Voltage | 2 | |
| Lighting | 3 | |
| Illuminated Signs | 2 | |
| Fire Detection and Alarm Systems | 5 | |
| Safety Information | 5 | |
| Overcurrent Protection | 6 | |
| High Voltage | 2 | |
| Photovoltaics | 6 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 80 questions in 3.5 hours; 70% to pass.
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- Journeyperson applicants take only the trade exam; there is no Business and Law portion.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut E-2 exam?
80 questions: raceways and boxes 8, general electrical knowledge 7, service, feeders and branch circuits 7, conductors and cables 7, grounding and bonding 6, overcurrent protection 6, photovoltaics 6, then smaller sections on special occupancies, motors, fire alarm, safety, electrical power, lighting, low voltage, signs and high voltage.
Does the E-2 journeyperson exam include Business and Law?
No. Journeyperson applicants take only the trade exam.
What experience do I need for the E-2?
A registered Connecticut Department of Labor apprenticeship and at least 4 years of experience, as set out in CGS 20-334a. Confirm current requirements with DCP.
Free questions with answers
Show all 10 free questions and answers
A 208Y/120-volt panelboard is installed in an electrical room with its front facing a grounded concrete wall across the aisle (exposed live parts on one side of the working space, grounded parts on the other). What is the minimum depth of clear working space in front of the panelboard?
Answer: 3 feet (36 inches)
Table 110.26(A)(1) is read by nominal voltage to ground. A 208Y/120-volt system is 120 volts to ground, which falls in the 0 to 150 volt row, where Conditions 1, 2 and 3 all require 3 ft. The 3 1/2 ft and 4 ft depths are the Condition 2 and Condition 3 values for 151 to 600 volts (for example 480Y/277 V), and 30 in. is the minimum width of working space, not its depth.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, Table 110.26(A)(1)
Overhead 120/240-volt service conductors pass over a residential driveway on a one-family lot. What is the minimum clearance above the driveway?
Answer: 12 feet
Section 230.24(B)(2) requires 12 ft over residential property and driveways, and over commercial areas not subject to truck traffic, where the voltage does not exceed 300 volts to ground. The 10 ft value applies only at the point of attachment over sidewalks or areas accessible only to pedestrians, 15 ft is for other land, and 18 ft is for streets and truck-traffic areas.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 230.24(B)(2)
A 500 kcmil copper service has a grounding electrode conductor whose only connection is to a single driven ground rod. Under 250.66(A), what is the largest copper size this conductor is required to be?
Answer: 6 AWG
Table 250.66 would require 1/0 AWG copper for a 500 kcmil service, but 250.66(A) says that the part of the grounding electrode conductor that is the sole connection to rod, pipe or plate electrodes is not required to be larger than 6 AWG copper. The 4 AWG limit belongs to concrete-encased electrodes in 250.66(B), and 2 AWG is the table value for a smaller service.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 250.66(A)
A feeder supplies 60 amperes of continuous load and 50 amperes of noncontinuous load through 75 C terminals. The overcurrent device is not rated for 100 percent continuous duty. Using copper THWN conductors, what is the smallest size permitted?
Answer: 1 AWG
Section 215.2(A)(1) requires 125 percent of the continuous load plus 100 percent of the noncontinuous load: (60 x 1.25) + 50 = 75 + 50 = 125 A. In the 75 C column of Table 310.16, 2 AWG is 115 A (too small) and 1 AWG is 130 A (adequate). 2 AWG would result from adding the loads at 100 percent (110 A), and 1/0 AWG from taking 125 percent of the whole 110 A (137.5 A).
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 215.2(A)(1) and Table 310.16
A single-gang box contains two 12-2 NM cables with ground (four insulated 12 AWG conductors and two bare equipment grounding conductors), one duplex receptacle and internal cable clamps. Each 12 AWG conductor allowance is 2.25 cubic inches. What is the minimum required box volume?
Answer: 18.0 cubic inches
Under 314.16(B), count 4 conductors (4 x 2.25 = 9.0), all equipment grounding conductors together as one (2.25), all internal clamps together as one (2.25), and the device yoke as two (2 x 2.25 = 4.5). The total is 9.0 + 2.25 + 2.25 + 4.5 = 18.0 in3. Omitting the clamp allowance gives 15.75, omitting both clamps and grounds gives 13.5, and counting each ground separately gives 20.25.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 314.16(B) and Table 314.16(B)
A 10-horsepower, 230-volt, 3-phase squirrel-cage motor has a nameplate current of 26.4 amperes. Using Table 430.250, what is the minimum ampacity of the branch-circuit conductors for a continuous-duty motor?
Answer: 35 amperes
Section 430.6(A)(1) requires table full-load current values, not nameplate current, to size conductors. Table 430.250 shows 28 A for a 10-hp, 230-volt motor, and 430.22 requires 125 percent: 28 x 1.25 = 35 A. 33 A uses the nameplate current (26.4 x 1.25), 28 A omits the 125 percent factor, and 42 A uses 150 percent.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 430.6(A)(1), 430.22 and Table 430.250
Under the Connecticut amendment to 517.13, which items in patient care spaces may be connected to an equipment grounding return path that complies with either 517.13(A) or 517.13(B), rather than both?
Answer: Luminaires over 7 1/2 ft above the floor and switches outside the vicinity
The Connecticut-amended 517.13 requires patient care space wiring to meet both 517.13(A) (metal raceway or metal-armored cable that qualifies as an equipment grounding conductor) and 517.13(B) (an insulated copper equipment grounding conductor). Exception No. 1 lets luminaires more than 2.3 m (7 1/2 ft) above the floor and switches located outside the patient care vicinity use a return path complying with either (A) or (B). Receptacles, metal faceplates and fixed equipment over 100 volts are listed in 517.13(B)(1) and must be connected to the insulated conductor.
Reference: 2022 Connecticut State Building Code, Amendments to the 2020 NFPA 70, 517.13(A) (Connecticut amendment, 2022 CSBC)
Which of these is NOT a standard ampere rating for fuses and inverse-time circuit breakers listed in 240.6(A)?
Answer: 65 amperes
Section 240.6(A) lists 60, 70, 80, 90, 100, 110, 125, 150, 175, 200 and so on, but not 65 A. This is the reason the next higher standard rating matters under 240.4(B) when a conductor ampacity does not match a standard value.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 240.6(A)
Twelve crystalline-silicon PV modules are connected in series. Each module has an open-circuit voltage of 37.4 volts at 25 C, no manufacturer temperature coefficient is provided, and the lowest expected ambient temperature is -12 C. Using Table 690.7(A), what is the maximum PV system voltage?
Answer: 520.6 volts
The series Voc at 25 C is 12 x 37.4 = 448.8 V. Table 690.7(A) gives a correction factor of 1.16 for -11 to -15 C, so the maximum system voltage is 448.8 x 1.16 = 520.6 V. The 448.8 V choice applies no correction, 493.7 V uses the 1.10 factor for 0 to 4 C, and 511.6 V uses the 1.14 factor for -6 to -10 C.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 690.7(A) and Table 690.7(A)
A non-power-limited fire alarm circuit uses 16 AWG copper conductors. Under 760.43, what is the maximum overcurrent protection permitted?
Answer: 10 amperes
Section 760.43 limits overcurrent protection for NPLFA circuits to 7 A for 18 AWG and 10 A for 16 AWG conductors; 14 AWG and larger are protected according to their ampacity without adjustment or correction factors. The 7 A value belongs to 18 AWG, and 15 A and 20 A are general branch-circuit values that do not apply to 16 AWG fire alarm conductors.
Reference: NFPA 70, National Electrical Code (NEC), 2020 edition, 760.43
Sources
- PSI: Connecticut Electrical Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.