Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | At least 2 years as a licensed unlimited journeyperson in the trade, or at least 6 years of equivalent experience and training DCP accepts (CGS 20-334a; RCSA 20-332); age 18 |
| Exams | E-1 electrical exam: 100 questions, 4 hours, 70%, plus the Business and Law exam |
| Books allowed | NEC or NEC Handbook (2020 or 2023), Ugly's, NFPA 72 (2013), Dunlop Photovoltaic Systems 3rd edition, NESC 2012 and 29 CFR 1926 |
| Fees | $59 per PSI exam portion; DCP $150 application fee (CGS 20-333) and $150 initial license fee (CGS 20-335); renews yearly for $150 |
Electricians with at least 2 years as a journeyperson applying for a Connecticut E-1 unlimited electrical contractor license from the Department of Consumer Protection.
Official links
How to get licensed, step by step
Confirm you qualify
Contractor licenses need at least 2 years as a licensed journeyperson (or equivalent experience and training DCP accepts), plus both the Business and Law exam and the trade exam.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass both exam portions with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Photovoltaics is 10 of the 100 questions. Know NEC Article 690, plus Articles 705 and 250 for grounding.
- Tab Articles 210, 215, 220, 230, 240, 250, 310, 314, 430, 450 and Chapter 9 and your Ugly's formulas.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and Ugly's. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 Edition (or the NEC Handbook; 2023 also allowed)Essential
Allowed in the exam room. Connecticut adopts the 2020 NEC with state amendments. Tab Articles 100, 110, 210, 215, 220, 230, 240, 250, 310, 314, 430, 690 and Chapter 9.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References, 2020 or 2023 EditionEssential
Allowed in the exam room. Formulas for voltage drop, power, motors and transformers.
NFPA 72: National Fire Alarm Code, 2013
Allowed in the exam room. Fire detection and alarm questions.
Photovoltaic Systems, 3rd Edition (James P. Dunlop; the PSI bulletin spells it Dunlap)
Allowed in the exam room. Source for the photovoltaics section.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code or NEC Handbook, 2020 or 2023 edition (allowed in the exam room)
- Ugly's Electrical References, 2020 or 2023 (allowed in the exam room)
- NFPA 72: National Fire Alarm Code, 2013 (allowed in the exam room)
- Photovoltaic Systems, 3rd edition, James Dunlop (allowed in the exam room)
- National Electrical Safety Code, 2012 edition (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Electrical Knowledge | 6 | |
| Service, Feeders, and Branch Circuits | 10 | |
| Grounding and Bonding | 7 | |
| Conductors and Cables | 10 | |
| Raceways and Boxes | 8 | |
| Special Occupancies and Equipment | 9 | |
| Electrical Power | 6 | |
| Motors | 6 | |
| Low Voltage | 2 | |
| Lighting | 3 | |
| Illuminated Signs | 2 | |
| Fire Detection and Alarm Systems | 5 | |
| Safety Information | 6 | |
| Overcurrent Protection | 6 | |
| High Voltage | 4 | |
| Photovoltaics | 10 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 100 questions in 4 hours; 70% to pass.
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- The bulletin also lists other allowed books on solar installation; see the PSI bulletin for the full reference list.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut E-1 exam?
100 questions: service, feeders and branch circuits 10, conductors and cables 10, photovoltaics 10, special occupancies and equipment 9, raceways and boxes 8, grounding and bonding 7, then smaller sections including overcurrent protection, motors, electrical power, safety information, general knowledge, fire alarm, high voltage, lighting, low voltage and signs.
Which NEC edition is on the Connecticut electrical exams?
The bulletin allows the 2020 or 2023 NEC. Connecticut's 2022 State Building Code adopts the 2020 NEC with Connecticut amendments, and our questions are written against the 2020 edition.
Do I also need the Business and Law exam?
Yes. Contractor licenses need both the Business and Law exam and the E-1 trade exam.
Free questions with answers
Show all 10 free questions and answers
A branch-circuit calculation for a new dwelling shows a 20-ampere circuit supplying only receptacles in a kitchen. Under the 2020 NEC as adopted in Connecticut, which statement about AFCI protection for this circuit is correct?
Answer: AFCI protection is required, because 210.12(A) in the 2020 edition lists kitchens and laundry areas among the dwelling spaces
Section 210.12(A) of the 2020 NEC requires AFCI protection on all 120-volt, single-phase, 15- and 20-ampere branch circuits supplying outlets or devices in dwelling unit kitchens, laundry areas, family rooms, dining rooms, living rooms, bedrooms, closets, hallways and similar rooms. Connecticut does not amend 210.12. GFCI (210.8) and AFCI (210.12) are separate requirements, so a kitchen countertop circuit typically needs both; neither is limited by the 15- versus 20-ampere rating.
Reference: NFPA 70, National Electrical Code, 2020, 210.12(A)
A service has 4/0 AWG copper ungrounded conductors and the grounding electrode conductor connects to a metal underground water pipe electrode. Using Table 250.66, what is the minimum copper grounding electrode conductor size?
Answer: 2 AWG
Table 250.66 lists 2 AWG copper for ungrounded service conductors over 3/0 AWG through 350 kcmil copper, and 4/0 AWG falls in that row. 4 AWG is for 2/0 and 3/0 AWG, 1/0 AWG is for over 350 through 600 kcmil, and 6 AWG is for 1 AWG and 1/0 AWG conductors.
Reference: NFPA 70, National Electrical Code, 2020, Table 250.66
A 4 AWG copper Type NM-B cable with 90 degrees C conductors is installed in a dwelling with no ampacity adjustment or correction needed. What is the maximum ampacity permitted for the cable?
Answer: 70 amperes
Section 334.80 limits the ampacity of NM cable to the 60 degrees C column of Table 310.16, even though the conductors are rated 90 degrees C. 4 AWG copper is 70 A at 60 degrees C. The 90 degrees C value (95 A) and the 75 degrees C value (85 A) may be used only as starting points for adjustment and correction calculations.
Reference: NFPA 70, National Electrical Code, 2020, 334.80; Table 310.16
Under the Connecticut addition 300.4.1(A)(3), what is the maximum notch depth in a 3 1/2 inch wide stud in an exterior wall?
Answer: 0.875 inches, which is 25 percent of the stud width
Any stud in an exterior wall or interior bearing partition may be cut or notched to a depth not exceeding 25 percent of its width: 3.5 x 0.25 = 0.875 in. Studs in nonbearing interior partitions may be notched to 40 percent of a single stud width. Bored holes are limited to 40 percent of the width (60 percent with Exception No. 1).
Reference: NFPA 70, National Electrical Code, 2020, 300.4.1(A)(3) (Connecticut addition, 2022 CSBC)
A 40-hp, 460-volt, 3-phase squirrel-cage motor has a Table 430.250 full-load current of 52 amperes and a nameplate current of 49 amperes. What is the minimum ampacity of the branch-circuit conductors for this continuous-duty motor?
Answer: 65 amperes
Section 430.22 requires branch-circuit conductors for a single motor to be at least 125 percent of the full-load current from Table 430.250, not the nameplate: 52 x 1.25 = 65 A. 61.3 A uses the nameplate (49 x 1.25), 52 A leaves out the 125 percent, and 78 A applies 150 percent.
Reference: NFPA 70, National Electrical Code, 2020, 430.22(A); Table 430.250
An electric vehicle supply equipment (EVSE) charger is rated 7,200 VA at 240 volts, single phase, and is a continuous load. What is the smallest standard branch-circuit rating permitted?
Answer: 40 amperes
Current = 7,200 / 240 = 30 A. Section 625.41 requires EVSE branch-circuit overcurrent protection and conductors to be rated at not less than 125 percent of the maximum load of the equipment: 30 x 1.25 = 37.5 A. The next standard rating at or above 37.5 A is 40 A (240.6(A)); 35 A is below the 37.5 A minimum. 30 A omits the continuous-load factor and 50 A is two sizes up.
Reference: NFPA 70, National Electrical Code, 2020, 625.41; 240.6(A)
A 3-phase, 4-wire feeder has an unbalanced neutral load of 320 amperes consisting of linear loads. Using 220.61(B), what is the maximum neutral load to which the neutral conductor must be sized?
Answer: 284 amperes
Section 220.61(B)(2) permits an additional 70 percent demand factor on the portion of the unbalanced (neutral) load in excess of 200 A for a 4-wire, 3-phase system: 200 + (120 x 0.70) = 200 + 84 = 284 A. 320 A applies no reduction, 224 A applies 70 percent to the whole load, and 296 A uses an 80 percent factor. Under 220.61(C), no reduction is allowed for the portion of the neutral load made up of nonlinear loads on a 3-phase, 4-wire wye system.
Reference: NFPA 70, National Electrical Code, 2020, 220.61(B)(2)
A circuit has been de-energized for work. Under 29 CFR 1926.417(b), what must be done with the equipment or circuit?
Answer: It must be rendered inoperative and have tags attached at all points where it can be energized
Section 1926.417(b) requires equipment or circuits that are de-energized to be rendered inoperative and to have tags attached at all points where the equipment or circuits can be energized. Section 1926.417(c) adds that tags must plainly identify the equipment or circuits being worked on. Controls that are to be deactivated are tagged under 1926.417(a).
Reference: 29 CFR 1926 (OSHA construction standards), 29 CFR 1926.417(b)
A 20-ampere current flows through a 6-ohm resistance. How much power is dissipated as heat?
Answer: 2,400 watts
Power = I squared x R = 20 x 20 x 6 = 400 x 6 = 2,400 W. 120 W is I x R (which is volts, not watts), 400 W is only I squared, and 4,800 W is twice the correct value.
Reference: General electrical theory (Ohm's law and power formulas), Power formula, P = I squared x R
Under the 2020 NEC rapid shutdown rule, what is the voltage limit for controlled conductors located outside the array boundary, and within what time after initiation must it be reached?
Answer: 30 volts within 30 seconds
Section 690.12(B)(1) requires controlled conductors outside the array boundary to be limited to not more than 30 V within 30 seconds of rapid shutdown initiation. The 80 V limit applies to conductors inside the array boundary (690.12(B)(2)), also within 30 seconds. The 10-second and 60-second times are not in the rule.
Reference: NFPA 70, National Electrical Code, 2020, 690.12(B)(1)
Sources
- PSI: Connecticut Electrical Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.