Requirements at a glance
| Agency | Alaska Department of Labor and Workforce Development, Mechanical Inspection (state-run exam, not PSI) |
|---|---|
| Experience | 8,000 hours as an Alaska trainee in commercial or residential plumbing (at most 1,000 classroom, 500 utility and 2,000 gas hours) (8 AAC 90.130) |
| Exam | Open book, 70% to pass, 4-hour maximum; the number of questions and topic weights are not published |
| Books allowed | 2018 Uniform Plumbing Code (open book) |
| Fees | $50 non-refundable application fee, then a $200 certificate fee when issued |
Plumber trainees in Alaska with 8,000 hours of plumbing installation who apply to Mechanical Inspection for a journeyman certificate of fitness.
Official links
How to get licensed, step by step
Hold a trainee certificate
Alaska counts experience only while you hold a trainee certificate of fitness in the trade, and only in a registered program.
Apply to Mechanical Inspection
Send the application packet, fees and experience verification forms. Processing takes 7 to 10 business days before you can schedule.
Take the journeyman plumber exam
The Department tests in Anchorage, Juneau and Fairbanks on the first and third Wednesday of each month; job centers, union halls and approved proctors cover other places. Bring a government photo ID.
Mechanical Inspection: testing information and study guides (opens in a new tab)
Retest if needed
If you fail, wait 30 days from the date of your last exam. Results are emailed to you.
Mechanical Inspection: testing information and study guides (opens in a new tab)
How to prepare
- The state publishes no blueprint. Our questions are a balanced mix of the code book on the Department's study guide list, so use them to learn where things are in the book.
- The exam is open book, so practice finding answers quickly in a tabbed copy of the code. Confirm the books and format with Mechanical Inspection at 907-269-4925.
- Alaska revises UPC 612.2 and 1210.2.3.1 (8 AAC 63.010); read those sections as amended.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- Uniform Plumbing Code (UPC), 2018 edition, with Alaska revisions (open book, per the Mechanical Inspection study guide list)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| General UPC 2018: Definitions and Administration | 6 | |
| General UPC 2018: Fixtures | 8 | |
| General UPC 2018: Water Supply and Distribution | 12 | |
| General UPC 2018: Drainage | 12 | |
| General UPC 2018: Vents | 10 | |
| General UPC 2018: Special Wastes and Storm Drainage | 6 | |
| General UPC 2018: Fuel Gas Piping | 6 |
Exam day details
- Administered by State of Alaska Department of Labor and Workforce Development, Mechanical Inspection (not PSI).
- Fee: No separate exam fee is listed. Mechanical Inspection charges a $50 non-refundable application fee and a $200 certificate fee when issued.
- Journeyman certificate (8 AAC 90.130): 8,000 hours as a trainee (at most 1,000 classroom hours, 500 utility hours and 2,000 gas hours), exam, $50 application fee and $200 certificate fee. The certificate lasts 2 years.
- If you fail, wait 30 days from the date of your last exam before retesting.
- State-run, open book, 70% to pass, 4-hour maximum. The Department publishes no question count or topic weights.
- Mechanical Inspection tests in Anchorage, Juneau and Fairbanks on the first and third Wednesday of each month; job centers, union halls and approved proctors cover other places. Approval of your application packet takes 7 to 10 business days before you can schedule.
Note: The Alaska Department of Labor does not publish the number of questions or topic weights for certificate of fitness exams. Our topic split and 60-question practice length are estimates, and a TODO(verify) remains on the exact books and scope. Check with Mechanical Inspection at 907-269-4925.
Frequently asked questions
How many questions are on the Alaska journeyman plumber exam?
The Department of Labor does not publish a question count or topic weights. The limit is 4 hours and the pass score is 70%.
Which plumbing code does it use?
The 2018 UPC; Alaska revises sections 612.2 and 1210.2.3.1 (8 AAC 63.010).
Free questions with answers
Show all 10 free questions and answers
An inspector needs to inspect an occupied building to enforce the code. Before entering, what must the Authority Having Jurisdiction do under the right-of-entry section?
Answer: Present credentials to the occupant and request entry
Section 103.4 lets the AHJ enter at reasonable times to inspect, but for an occupied building the AHJ must present credentials to the occupant and request entry. If entry is refused, the AHJ has recourse to every remedy provided by law. Written notice with a waiting period, a stop order or a new permit are not what the right-of-entry section requires.
Reference: 2018 Uniform Plumbing Code, Section 103.4
A site-built shower receptor has a finished dam. Which pair of limits applies to the depth of the dam or threshold, measured from its top to the top of the drain, under Section 408.5?
Answer: Not less than 2 inches and not more than 9 inches
Section 408.5 says the dam or threshold must be at least 1 inch lower than the sides and back of the receptor, and in no case less than 2 inches or more than 9 inches in depth measured to the top of the drain. The receptor also needs an integral nailing flange.
Reference: 2018 Uniform Plumbing Code, Section 408.5
Under Section 608.1, what residual water pressure triggers the requirement for a tank and pump or other means to boost pressure?
Answer: Less than 15 psi after friction and other losses
Section 608.1 requires a tank and pump or other means where the supply cannot provide a residual pressure of at least 15 psi after allowing for friction and other pressure losses. Fixtures needing more than 15 psi must be given the higher residual pressure they require.
Reference: 2018 Uniform Plumbing Code, Section 608.1
A T&P relief valve discharge pipe terminates outdoors. Which termination height above the ground complies with Section 608.5?
Answer: Between 6 inches and 2 feet, pointing downward
Section 608.5 requires the relief valve discharge to be unvalved, full size, and to discharge by gravity through an air gap with the pipe end not more than 2 feet and not less than 6 inches above the ground, pointing downward. The terminal end may not be threaded, and no part may be trapped.
Reference: 2018 Uniform Plumbing Code, Section 608.5
What is the minimum uniform slope for horizontal drainage piping under Section 708.1?
Answer: 1/4 inch per foot (2 percent)
Section 708.1 requires a uniform slope of not less than 1/4 inch per foot (2 percent) toward the point of disposal. The 1/8 inch per foot slope is an exception only for piping of 4 inches or larger where it is impractical to get 1/4 inch and the AHJ first approves.
Reference: 2018 Uniform Plumbing Code, Section 708.1
Which clearance in front of a cleanout is required for a cleanout on a 3 inch drain under Section 707.9?
Answer: 24 inches by 24 inches
Section 707.9 requires 18 inches by 18 inches clearance in front of cleanouts in piping 2 inches or less and 24 inches by 24 inches for piping exceeding 2 inches. A 3 inch drain exceeds 2 inches, so 24 x 24 applies.
Reference: 2018 Uniform Plumbing Code, Section 707.9
A vent stack terminates through a pitched roof. What are the minimum clearances under Section 906.1?
Answer: 6 inches above the roof and 1 foot from a vertical surface
Section 906.1 requires each vent to extend through its flashing and terminate vertically not less than 6 inches above the roof and not less than 1 foot from a vertical surface. The 2 foot value belongs to chimney and gas vent termination rules, not plumbing vents.
Reference: 2018 Uniform Plumbing Code, Section 906.1
What is the minimum height above the roof that a frost-protected vent terminal must extend under Section 906.7, unless the AHJ directs otherwise?
Answer: 10 inches
Section 906.7 says the enlarged terminal extends not less than 10 inches above the roof, or in accordance with the AHJ. The ordinary 6 inch height in Section 906.1 is for conventional terminals, and snow depth is why the cold-climate rule is taller.
Reference: 2018 Uniform Plumbing Code, Section 906.7
What is the minimum vertical air gap for a drainage air gap required by the code, measured from the lowest point of the indirect waste pipe to the flood-level rim of the receptor (Section 801.2)?
Answer: 1 inch
Section 801.2 says that where a drainage air gap is required, the minimum vertical distance from the lowest point of the indirect waste pipe or fixture outlet to the flood-level rim of the receptor is not less than 1 inch. This is separate from the potable water supply air gap rule in Section 603.4.4.
Reference: 2018 Uniform Plumbing Code, Section 801.2
Where may plastic gas piping be installed according to Section 1210.1.7?
Answer: Outdoors, underground only
Section 1210.1.7 limits plastic piping to outdoors underground. Connections between metallic and plastic piping use fittings meeting Section 1210.1.7.1, and an electrically continuous corrosion-resistant tracer must be buried with the plastic pipe (1210.1.7.2).
Reference: 2018 Uniform Plumbing Code, Section 1210.1.7
Sources
- Alaska DOLWD Mechanical Inspection: testing information (opens in a new tab)
- Alaska DOLWD Labor Standards and Safety: Mechanical Inspection (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.