Alabama Home Builder Skill Exam: Practice Test & Licensing Guide

The Prov skill exam for an unlimited Alabama residential home builder license: 80 open-book questions on plan reading, foundations, concrete, masonry, carpentry, roofing, finishes and OSHA. 66% to pass.

Questions
80
Time limit
4 hours
Passing score
66%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Plan Reading

What minimum uniformly distributed live load does Table R301.5 assign to sleeping rooms in a dwelling?

Requirements at a glance

AgencyAlabama Home Builders Licensure Board (HBLB); exam by Prov
Exam80 questions, 4 hours, 66% to pass, open book
Books allowed2015 IRC and the Residential Home Builder Study Guide (Pearson), or the substitutes listed in the bulletin
Fee$80 to Prov; scores are valid 3 years

Residential home builders applying for an unlimited license from the Alabama Home Builders Licensure Board. Some residential licensees from TN, SC, MS, LA and NC may have the skill exam waived.

How to get licensed, step by step

  1. Meet the eligibility requirement

    The Skill exam is required for an unlimited home builder license; Business and Law is required for every license. Some residential licensees from TN, SC, MS, LA and NC may have the skill exam waived.

    Alabama Home Builders Licensure Board (opens in a new tab)

  2. Apply to the board

    Apply to the Home Builders Licensure Board for approval to test.

    Alabama Home Builders Licensure Board (opens in a new tab)

  3. Schedule with Prov

    Pay Prov the $80 exam fee when you register; you can test at a site or remotely. Prov grades the exam right away and sends your result to the board. If you fail, wait 30 days before retesting.

    Schedule with Prov (opens in a new tab)

  4. Bring your references

    All of these exams are open book. Bring the exact books the bulletin lists; permanent tabs and pen highlighting are allowed, sticky notes and loose notes are not.

    Prov bookstore (reference books) (opens in a new tab)

How to prepare

  • Carpentry is 20 of 80 questions. Tab the 2015 IRC framing, floor, wall and roof chapters.
  • Plan reading (10) and sitework and foundations (10) come next; practice quantity takeoffs and footing requirements.
  • The bulletin still uses the 2015 IRC, not the newer editions other Alabama exams use.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • International Residential Code (IRC), 2015 edition (allowed in the exam room)
    • Residential Home Builder Study Guide, Pearson (allowed in the exam room; substitutes are listed in the bulletin)

    What's on the exam

    Official content outline from Prov, Inc. (number of questions per topic):

    TopicQuestions
    Plan Reading10
    Sitework and Foundations10
    Concrete and Reinforcement7
    Masonry6
    Carpentry20
    Roofing7
    Interior Finish4
    Exterior Finish5
    Associated Trades6
    OSHA5

    Exam day details

    • Administered by Prov, Inc. for the Alabama Home Builders Licensure Board.
    • Fee: $80 to Prov per exam. Board application and license fees are separate.
    • 80 questions in 4 hours; 66% to pass.
    • The bulletin still lists the 2015 IRC for this exam.
    • Prov (provexam.com, (801) 733-4455) gives the exam for the Alabama Home Builders Licensure Board (HBLB). The exam fee is paid to Prov when you register, and you can test at a site or remotely through Examroom.
    • You may retest an unlimited number of times, waiting 30 days after a fail. A passing result stays valid for 3 years.
    • Home builders need the Business and Law exam; the Skill exam is required for an unlimited license.

    Frequently asked questions

    What's on the Alabama home builder skill exam?

    80 questions: carpentry 20, plan reading 10, sitework and foundations 10, concrete and reinforcement 7, roofing 7, masonry 6, associated trades 6, exterior finish 5, OSHA 5 and interior finish 4.

    Which IRC edition does it use?

    The 2015 International Residential Code, per the Prov bulletin.

    Do I need the skill exam?

    It is required for an unlimited license; Business and Law is required for all home builder licenses.

    Free questions with answers

    Show all 10 free questions and answers
    1. What minimum uniformly distributed live load does Table R301.5 assign to sleeping rooms in a dwelling?

      Answer: 30 pounds per square foot

      Table R301.5 lists sleeping rooms at 30 psf and rooms other than sleeping rooms at 40 psf. The 40 psf value is the tempting wrong answer because it applies to living areas, kitchens and similar rooms.

      Reference: 2015 International Residential Code (Alabama viewer text), Table R301.5

    2. Where lot lines prevent the 6 inch fall in 10 feet, impervious surfaces within 10 feet of the foundation must slope at least how much away from the building?

      Answer: 2 percent

      Section R401.3 requires impervious surfaces within 10 feet of the building foundation to slope a minimum of 2 percent away from the building when the standard fall cannot be provided.

      Reference: 2015 International Residential Code (Alabama viewer text), R401.3

    3. Table R402.2 lists what minimum strength for garage floor slabs in a severe weathering region?

      Answer: 3,500 psi

      Table R402.2 lists porches, carport slabs, steps and garage floor slabs at 2,500 psi (negligible), 3,000 psi (moderate) and 3,500 psi (severe weathering), with air entrainment in the moderate and severe regions.

      Reference: 2015 International Residential Code (Alabama viewer text), Table R402.2

    4. Unless drawings say otherwise, head and bed joints in masonry are what thickness?

      Answer: 3/8 inch

      Section R606.3.1 sets head and bed joints at 3/8 inch unless the drawings require otherwise. The starting course bed joint over a foundation is allowed from 1/4 to 3/4 inch.

      Reference: 2015 International Residential Code (Alabama viewer text), R606.3.1

    5. What minimum bearing must the end of a floor joist have on a wood or metal support under R502.6?

      Answer: 1 1/2 inches

      Section R502.6 requires 1 1/2 inches of bearing on wood or metal and 3 inches on masonry or concrete, unless hangers or a ribbon strip are used. The 3-inch figure is the masonry value.

      Reference: 2015 International Residential Code (Alabama viewer text), R502.6

    6. A roof has a 3:12 slope and will receive asphalt shingles. What underlayment treatment does R905.2.2 require?

      Answer: Double underlayment application

      A slope from 2:12 up to 4:12 requires double underlayment under R905.2.2. A slope below 2:12 may not receive asphalt shingles at all.

      Reference: 2015 International Residential Code (Alabama viewer text), R905.2.2

    7. What is the minimum ceiling height for habitable space under R305.1?

      Answer: 7 feet

      Section R305.1 requires habitable space, hallways and portions of basements containing them to have at least 7 feet of ceiling height; bathrooms, toilet rooms and laundry rooms need 6 feet 8 inches.

      Reference: 2015 International Residential Code (Alabama viewer text), R305.1

    8. A weep screed on stucco must be placed at least how far above earth and above paved areas under R703.7.2.1?

      Answer: 4 inches above earth and 2 inches above paved areas

      Section R703.7.2.1 requires a corrosion-resistant weep screed at or below the foundation plate line placed not less than 4 inches above earth or 2 inches above paved areas.

      Reference: 2015 International Residential Code (Alabama viewer text), R703.7.2.1

    9. Which bathroom receptacles must have GFCI protection under E3902.1?

      Answer: All 125-volt, 15- and 20-ampere receptacles

      Section E3902.1 requires GFCI protection for personnel on all 125-volt, single-phase, 15- and 20-ampere receptacles installed in bathrooms, regardless of distance from the fixtures.

      Reference: 2015 International Residential Code (Alabama viewer text), E3902.1

    10. Employees on a scaffold must be protected from falls when more than what height above a lower level?

      Answer: 10 feet

      Section 1926.451(g)(1) requires fall protection for each employee on a scaffold more than 10 feet above a lower level. The 6-foot rule applies to general construction work under 1926.501.

      Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.451(g)(1)

    Sources

    Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.