Alabama licensing exam

Alabama Building Contractor Exam (Under Four Stories): Practice Test & Licensing Guide

The PSI trade exam for an Alabama general contractor license in building construction under four stories: 90 open-book questions on sitework, concrete, masonry, carpentry, roofing, codes and OSHA. 70% to pass.

Questions
90
Time limit
3.8333333333333335 hours
Passing score
70%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Sitework, Footings and Foundation

Grading around a new building is being finished. Under the IBC site grading rule, how much total fall is needed over the 10 feet measured perpendicular to the foundation wall when the standard 5-percent slope is used?

Requirements at a glance

AgencyAlabama Licensing Board for General Contractors (LBGC); exam by PSI
Exam90 scored questions, 230 minutes, 70% (63 correct) to pass, open book
Books allowed2021 IBC and IRC, 2018 IECC, 29 CFR 1926, Feirer's Carpentry and Building Construction, ACI 318 and 530, and the other references on PSI's list
Fee$96 to PSI per exam registration
RetakesUnlimited within your 1-year eligibility; PSI fee each time

Contractors applying for an Alabama general contractor license for commercial work of $50,000 or more (building construction under four stories) from the Licensing Board for General Contractors.

How to get licensed, step by step

  1. Apply to the Board

    Submit your application to the Licensing Board for General Contractors. Your eligibility is valid for 1 year from the date the state receives the application.

    Alabama Licensing Board for General Contractors (opens in a new tab)

  2. Schedule with PSI

    Register at test-takers.psiexams.com/alcon or call (855) 257-1619. The fee is $96 per exam registration.

    Schedule with PSI (Alabama general contractors) (opens in a new tab)

  3. Take the exam

    Bring your open-book references (highlighting, underlining and permanent tabs are allowed; no writing, loose papers or sticky notes) and a silent, non-programmable calculator. You see your result on screen right away.

    Schedule with PSI (Alabama general contractors) (opens in a new tab)

How to prepare

  • General code and construction knowledge (20) and carpentry (16) are over a third of the exam. Tab the IBC and IRC and your Feirer book.
  • Roofing (10) and associated trades (10) are broad: know truss bracing from the BCSI guide and basic mechanical, electrical and gypsum work.
  • Code questions use only the listed editions (2021 IBC and IRC, 2018 IECC).
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • International Building Code (IBC), 2021 edition (allowed in the exam room)
    • International Residential Code (IRC), 2021 edition (allowed in the exam room)
    • International Energy Conservation Code (IECC), 2018 edition (allowed in the exam room)
    • 29 CFR Part 1926 (OSHA construction standards) (allowed in the exam room)
    • Carpentry and Building Construction, 2010 or 2016, Feirer (allowed in the exam room)
    • ACI 318-11 or 318-14 and ACI 530/530.1-11 or -13 (allowed in the exam room)
    • BCSI: Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses, 2018 (allowed in the exam room)
    • Contractor's Guide to Quality Concrete Construction, 3rd Edition; Modern Masonry, 8th Edition; Pipe and Excavation Contracting; Gypsum Construction Handbook, 7th Edition; SJI Technical Digest No. 9; SDI Manual of Construction with Steel Deck (allowed in the exam room)

    What's on the exam

    Official content outline from PSI Services (number of questions per topic):

    TopicQuestions
    Sitework, Footings and Foundation8
    Concrete and Concrete Reinforcement8
    Metals5
    Masonry6
    Carpentry16
    Roofing10
    General Code and Construction Knowledge20
    Associated Trades10
    OSHA Safety7

    Exam day details

    • Administered by PSI Services for the Alabama Licensing Board for General Contractors.
    • Fee: $96 to PSI per exam registration. Board application and license fees are separate.
    • 90 scored questions in 230 minutes; 63 correct (70%) to pass.
    • Code questions are based only on the edition listed (2021 IBC and IRC, 2018 IECC); for other references later editions are fine.
    • PSI gives the exam for the Alabama Licensing Board for General Contractors (LBGC). Eligibility is valid for 1 year from the date the state receives your application; you can test an unlimited number of times in that year, paying the PSI fee each time.
    • PSI may add one to ten unscored experimental questions (about 10% of the exam), which count against your time.
    • Open book. Bring your own references: you may highlight, underline and index them, but not write in them or add papers; only permanent tabs are allowed. PSI does not provide them in the exam center. A silent, non-printing, non-programmable calculator is allowed.
    • You see your result on screen right after the exam; a failing candidate also gets a diagnostic report by subject area.

    Frequently asked questions

    What's on the Alabama building contractor exam?

    90 questions: general code and construction knowledge 20, carpentry 16, roofing 10, associated trades 10, sitework, footings and foundation 8, concrete 8, OSHA safety 7, masonry 6 and metals 5.

    How many questions do I need to pass?

    63 of 90 (70%).

    Do I also need the business and law exam?

    Yes. PSI's bulletin lists the Business and Law exam as required of all general contractors.

    Free questions with answers

    Show all 10 free questions and answers
    1. Grading around a new building is being finished. Under the IBC site grading rule, how much total fall is needed over the 10 feet measured perpendicular to the foundation wall when the standard 5-percent slope is used?

      Answer: 6 inches

      Section 1804.4 requires the ground next to the foundation to slope away at not less than 1 unit vertical in 20 horizontal (5 percent) for 10 feet. 10 ft x 12 in/ft = 120 in; 120 / 20 = 6 inches of fall. 2.5 inches is the fall for the reduced 1:48 slope permitted where soil or climate warrant, not the standard rule.

      Reference: 2021 International Building Code, 1804.4

    2. What is the minimum thickness of a concrete floor slab supported directly on the ground under the IBC minimum slab provisions?

      Answer: 3-1/2 inches

      Section 1907.1 requires slabs on ground to be not less than 3-1/2 inches thick, with a 6-mil polyethylene vapor retarder lapped 6 inches under the slab unless an exception applies. The 4-inch figure often quoted is the usual base course thickness, not the slab thickness.

      Reference: 2021 International Building Code, 1907.1

    3. An ironworker is walking a beam with an unprotected edge during steel erection. At what height above a lower level must fall protection generally be provided under the steel erection standard?

      Answer: More than 15 feet

      29 CFR 1926.760(a)(1) requires protection for employees on a walking/working surface with an unprotected side or edge more than 15 feet above a lower level, using guardrails, nets, personal fall arrest, positioning or fall restraint. The general construction trigger of 6 feet in Subpart M does not apply to steel erection.

      Reference: 29 CFR 1926 Subpart R (Steel Erection), 29 CFR 1926.760(a)(1)

    4. A masonry wall designed by allowable stress design uses the IBC alternative lap splice provision. Regardless of the computed bar stress, what is the shortest lap splice permitted for a No. 5 bar (diameter 0.625 inch)?

      Answer: 25 inches

      Section 2107.2.1 says the lap length is not less than 12 inches and not less than 40 bar diameters. For No. 5: 40 x 0.625 = 25 inches, which is greater than 12, so 25 inches is the floor. The 12-inch figure ignores the 40-diameter minimum.

      Reference: 2021 International Building Code, 2107.2.1

    5. A framer is setting studs on a sole plate for a bearing wall built with 2x6 studs. What does the IBC require of the bottom plate?

      Answer: A 2-inch nominal plate at least as wide as the studs

      Section 2304.3.1 says studs must have full bearing on a 2-inch-thick (1-1/2 inch actual) or larger plate or sill whose width is not less than the width of the studs. A 2x4 plate under 2x6 studs would not give full bearing.

      Reference: 2021 International Building Code, 2304.3.1

    6. Asphalt shingles are being installed on a 3:12 slope. What extra underlayment treatment does the IBC require?

      Answer: Double underlayment application

      Section 1507.2.2 requires a double underlayment application per Section 1507.1.1 for slopes from 2:12 up to 4:12. A 3:12 roof is in that range, so a single layer is not enough.

      Reference: 2021 International Building Code, 1507.2.2

    7. A guardrail system is built around an open-sided floor. What top rail height does OSHA require?

      Answer: 42 inches, plus or minus 3 inches

      29 CFR 1926.502(b)(1) requires the top edge of the top rail to be 42 inches plus or minus 3 inches above the walking/working level, which is 39 to 45 inches. Midrails go midway between the top edge and the surface.

      Reference: 29 CFR 1926 Subpart M (Fall Protection), 29 CFR 1926.502(b)(1)

    8. A new office building has an interior stairway serving an occupant load of 200. Under the IBC means of egress provisions, what are the maximum riser height and minimum tread depth (rectangular treads)?

      Answer: 7 inches maximum and 11 inches minimum

      Section 1011.5.2 sets a 7-inch maximum riser (4-inch minimum) and 11-inch minimum tread depth. The 7-3/4 inch riser and 10-inch tread apply only in Group R-3, within R-2 dwelling units, and accessory Group U, per the exception.

      Reference: 2021 International Building Code, 1011.5.2

    9. What minimum clear opening width must a required egress door opening provide, measured with the door open 90 degrees?

      Answer: 32 inches

      Section 1010.1.1 requires each door opening in the means of egress to provide a minimum clear opening width of 32 inches, measured between the face of the door and the stop with the door open 90 degrees.

      Reference: 2021 International Building Code, 1010.1.1

    10. A copper water supply piping system is being tested with air instead of water. What is the minimum air pressure and hold time under the IPC?

      Answer: 50 psi held for at least 15 minutes

      Section 312.5 requires the water supply system to be proved tight at not less than the working pressure of the system, or, for piping other than plastic, by an air test of not less than 50 psi, held for at least 15 minutes. The 5 psi figure is the drainage air test.

      Reference: 2021 International Plumbing Code, 312.5

    Sources

    Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.