Requirements at a glance
| Agency | Wisconsin Department of Safety and Professional Services (DSPS) |
|---|---|
| Experience | 4 years of 1,000 hours of HVAC work, or equivalent school |
| Exam | 100 questions, 4 hours, 70% to pass |
| Books allowed | One binder (SPS 320 to 325, 341, 345, notes), SMACNA duct standards (2020), ASHRAE Fundamentals (2013), NFPA 54 (2021, gas piping parts), IBC, IECC, IMC, IFGC and IEBC |
| Fees | $95 at Pearson VUE, plus the credential fee ($60 plus $15 application, 4-year term, no continuing education) |
People qualifying an HVAC contracting business in Wisconsin, with 4 years of 1,000 hours of HVAC work or equivalent school.
Official links
- Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 364 (HVAC) (opens in a new tab)
- DSPS permitted trades exam materials (PDF) (opens in a new tab)
How to get licensed, step by step
Apply to DSPS
Apply in LicensE with proof of your HVAC experience or schooling. DSPS issues exam instructions once your qualifications are met.
Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)
Schedule your exam
Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
Take the exam
100 questions, 4 hours, 70% to pass. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.
Wisconsin Admin. Code chapter SPS 364 (HVAC) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)
Results and licensing
After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.
How to prepare
- DSPS notes HVAC code changes effective 10/1/2025, so confirm the current references list before you test.
- Know the IMC and IFGC as Wisconsin changes them in SPS 364 and 365, plus duct construction and heating and cooling load basics.
- Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
- DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from SPS 364. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Wisconsin Admin. Code SPS 320 to 325, 341, 345 and 361 to 366Essential
The Wisconsin HVAC rules and the changes to the international building, mechanical, fuel gas and existing-building codes.
Official reference list (as published by the testing agency)
- One binder with Wis. Admin. Code SPS 320 to 325, 341 and 345 and your notes
- 2020 SMACNA HVAC Duct Construction Standards and 2013 ASHRAE Handbook: Fundamentals
- 2021 NFPA 54 (gas piping parts only)
- International Building Code, International Energy Conservation Code, International Mechanical Code, International Fuel Gas Code and International Existing Building Code (SPS 361.05 adopts the 2021 editions with Wisconsin changes in SPS 361 to 366)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Wisconsin HVAC Licensing and Administration (SPS 305, SPS 320, SPS 361) | 10 | |
| Construction and Energy Standards (SPS 321, SPS 322, IBC, IECC) | 10 | |
| Heating, Ventilating and Air Conditioning (SPS 323, IMC) | 24 | |
| Fuel Gas Appliances and Gas Piping (SPS 365, IFGC, NFPA 54) | 14 | |
| Ductwork and Duct Construction (SMACNA) | 12 | |
| Boilers and Pressure Vessels (SPS 341) | 8 | |
| Load, Airflow and Psychrometric Calculations (ASHRAE Fundamentals) | 14 | |
| Existing Buildings and Electrical Standards (SPS 366, SPS 324) | 8 |
Exam day details
- Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
- Fee: $95 at Pearson VUE. The credential application fee is separate.
- 100 questions in 4 hours (DSPS exam table, not checked against Pearson); open book; 70% to pass.
- DSPS notes HVAC code changes effective 10/1/2025; check the current references list before you test.
- Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
- You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
- The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
- DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
- DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.
Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.
Frequently asked questions
Which codes are on the Wisconsin HVAC Qualifier exam?
SPS 320 to 325, 341 and 345, plus the IBC, IECC, IMC, IFGC and IEBC as adopted with Wisconsin changes in SPS 361 to 366, and NFPA 54 gas piping.
Where do I take it?
Only at Pearson VUE centers in Wisconsin.
Is there continuing education?
DSPS lists no continuing education for the HVAC Qualifier.
Free questions with answers
Show all 10 free questions and answers
Under SPS 305.70(1), which of these people is NOT required to hold an HVAC contractor registration?
Answer: An individual who installs a furnace in the dwelling where he will live after the work is finished
SPS 305.70(1)(a) requires registration for anyone who installs or services heating, ventilating or air conditioning equipment, with exceptions in par. (b). One exception covers installing or servicing equipment within a dwelling owned by the person in which that person resides or will reside. Work for customers, tenants or landlords stays inside the registration requirement.
Reference: Wis. Admin. Code SPS 305, SPS 305.70(1)(a) and (b)2.
A utility room in a new one-family dwelling will hold an 80,000 Btu/h furnace and a 40,000 Btu/h water heater, both drawing combustion and dilution air from the room. Using the inside-air method of SPS 323.06(3), what is the minimum volume of the room, or of the rooms connected by permitted openings?
Answer: 6,000 cubic feet
SPS 323.06(3)(a)1 requires a space of not less than 50 cubic feet per 1,000 Btu/h of the combined input of all fuel-burning appliances drawing air from the space. Combined input 80,000 + 40,000 = 120,000 Btu/h; 120 x 50 = 6,000 cubic feet. Counting only the furnace gives 4,000, which is a common slip.
Reference: Wis. Admin. Code SPS 323, SPS 323.06(3)(a)1
Which standard governs the installation of fuel gas piping in a Wisconsin public building under SPS 365.0400, in place of IFGC chapter 4?
Answer: NFPA 54, National Fuel Gas Code
SPS 365.0400 substitutes for the requirements and exceptions of IFGC chapter 4: all gas piping and gas piping installations shall comply with NFPA 54, National Fuel Gas Code. SPS 365.0800 adds ANSI Z223.1/NFPA 54-2021 to the standards incorporated by reference into chs. SPS 361 to 366.
Reference: Wis. Admin. Code SPS 365, SPS 365.0400
Under SPS 365.0303(1), what is required when the air entering the heat exchanger of gas-fired equipment is 30 degrees F or lower?
Answer: The heat exchanger and burners must be built of corrosion-resistive materials
SPS 365.0303(1) adds to IFGC 303.1: if the air entering the heat exchanger of any gas-fired equipment is 30 degrees F or lower, the heat exchanger and burners must be constructed of corrosion-resistive materials. This protects against condensation damage in cold return air or mixed air conditions common in Wisconsin.
Reference: Wis. Admin. Code SPS 365, SPS 365.0303(1)
How often must a non-exempt low-pressure steam boiler or hot-water heating boiler receive a regular internal or external inspection by a certified inspector under SPS 341.17?
Answer: At least once every 36 months
SPS 341.17(3) sets 36 months for low-pressure steam boilers and hot-water heating boilers, and (2) sets 36 months for pressure vessels. Power boilers, miniature boilers and organic- or synthetic-fluid heat-transfer boilers are inspected at least every 12 months under (1). Exempt equipment is listed in s. SPS 341.18.
Reference: Wis. Admin. Code SPS 341, SPS 341.17(1) to (3)
A supply fan delivers 1,200 cfm of air that is heated through a 20 degree F temperature rise across the coil. Using the standard sensible heat equation for air, what is the sensible heat added?
Answer: 25,920 Btu/h
Sensible heat Q = 1.08 x cfm x delta T = 1.08 x 1,200 x 20 = 25,920 Btu/h. The 1.08 factor is 0.075 lb/ft3 x 0.24 Btu/lb-F x 60 min/h for standard air. Dropping the 1.08 (1,200 x 20 = 24,000) or using too small a factor (1.08 x 1,200 x 20 read as 21,600) are the usual slips.
Reference: General HVAC practice, Sensible heat equation for standard air: Q = 1.08 x cfm x delta T
A room has a design sensible heating load of 32,400 Btu/h and is supplied with air at a temperature 20 degrees F above room temperature. What supply airflow is needed?
Answer: 1,500 cfm
cfm = Q / (1.08 x delta T) = 32,400 / (1.08 x 20) = 32,400 / 21.6 = 1,500 cfm. Dividing by delta T alone (32,400 / 20) gives 1,620 cfm, and using a 15 degree split (32,400 / (1.08 x 15)) gives 2,000 cfm.
Reference: General HVAC practice, Sensible heat equation for standard air solved for airflow: cfm = Q / (1.08 x delta T)
Which tape may NOT be used to seal dwelling duct joints under SPS 322.43?
Answer: Standard cloth duct tape with a rubber-based adhesive
SPS 322.43(6) says tapes with rubber-based adhesives may not be used, and the note points out that standard duct tape (duck tape) has a rubber-based adhesive and does not comply. Sealing may use welds, gaskets, mastics, mastic-plus-fabric systems or tapes installed per manufacturer's instructions (322.43(2)), with UL 181A or 181B listing as required by the duct type.
Reference: Wis. Admin. Code SPS 322, SPS 322.43(2) and (6)
Under IMC 603.5.1, gypsum board may form an air shaft (duct) only under which condition?
Answer: In return air systems where air temperature does not exceed 125 degrees F and the board surface stays above the airstream dew point
IMC 603.5.1 limits gypsum board ducts to return air systems with air temperatures not over 125 degrees F, with the gypsum surface temperature kept above the dew point of the airstream. Supply ducts of gypsum board cannot be used with direct evaporative cooling. The 250 degree F limit in 603.5 is for nonmetallic ducts generally.
Reference: 2021 International Mechanical Code, IMC 603.5.1
SPS 366.0902 requires boiler and furnace equipment rooms adjacent to or within certain occupancies to be enclosed per IBC 509. Which list of occupancy groups does it name?
Answer: Groups I-1, I-2, I-4, R-1, R-2 and R-4
SPS 366.0902 substitutes wording for IEBC 902.2: boiler and furnace equipment rooms adjacent to or within Groups I-1, I-2, I-4, R-1, R-2 and R-4 occupancies shall be enclosed in compliance with the IBC section 509 heating equipment enclosure requirements. The list covers institutional and residential groups with sleeping occupants.
Reference: Wis. Admin. Code SPS 366, SPS 366.0902
Sources
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 364 (heating, ventilating and air conditioning) (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.