Requirements at a glance
| Agency | West Virginia Contractor Licensing Board (Division of Labor); exams by Prov |
|---|---|
| When you need it | Contracting work of $5,000 or more residential or $25,000 or more commercial (W. Va. Code 30-42-3) |
| Exams | Plumbing contractor exam: 100 questions, 3 hours, 70%, plus the Contractor Licensing Act exam |
| Books allowed | IPC 2018, IFGC 2018, Plumbing Basics for Contractors 3rd Edition |
| Fees | $59.95 per Prov exam; $90 annual Board license fee (28 CSR 2, 5.5) |
Businesses applying to the Contractor Licensing Board for the plumbing contracting classification: installation, maintenance, extension and alteration of piping, fixtures, venting and water supply systems, including gas piping. This is separate from the Division of Labor master plumber exam.
Official links
- West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
- Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)
- Register for your exam with Prov (opens in a new tab)
- West Virginia Code 30-42 (Contractor Licensing Act) (opens in a new tab)
- 28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)
How to get licensed, step by step
Pick your classification
Every contractor passes the Contractor Licensing Act exam plus a trade exam where one exists. Check the classification definitions in 28 CSR 2.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)
Apply to the Board
Apply through the Contractor Licensing Board at the Division of Labor, (304) 558-7890.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
Take your exams with Prov
Register at provexam.com or call (866) 720-7768. 3 hours per exam, 70% to pass, score on the spot, no waiting period before a retake.
Register for your exam with Prov (opens in a new tab)Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)
Get licensed
Send your results and the license fee to the Board.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)West Virginia Code 30-42 (Contractor Licensing Act) (opens in a new tab)
How to prepare
- Same topics as the master plumber exam: isometrics (13), water supply (14) and drain, waste and vent (14) carry the most weight.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Plumbing Code (IPC), 2018 EditionEssential
Allowed in the exam room. The core of the plumber exams, including drainage, venting and water supply sizing.
ICC store (opens in a new tab)Read free (UpCodes, West Virginia) (opens in a new tab)
International Fuel Gas Code (IFGC), 2018 Edition
Allowed in the exam room. Fuel gas piping sizing and appliance venting.
ICC store (opens in a new tab)Read free (UpCodes, West Virginia) (opens in a new tab)
Plumbing Basics for Contractors, 3rd Edition, 2014 (Pearson)
Listed in the Board bulletin for the plumbing contractor exam (about 37%). The Division of Labor plumber exams list the 4th Edition.
Official reference list (as published by the testing agency)
- International Plumbing Code 2018 (ICC), about 53% of questions
- Plumbing Basics for Contractors, 3rd Edition, 2014 (Pearson), about 37%
- International Fuel Gas Code 2018 (ICC), about 10%
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 10 | |
| Fixtures & Fittings | 6 | |
| Storm Drainage | 5 | |
| Fuel Gas Systems | 10 | |
| Safety | 7 | |
| Isometrics | 13 | |
| Water Supply and Distribution | 14 | |
| Water Heaters | 7 | |
| Drain, Waste and Vent Systems | 14 | |
| Plumbing Math | 9 | |
| Plumbing Tools | 5 |
Exam day details
- Administered by Prov, Inc. for the West Virginia Contractor Licensing Board.
- Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
- 100 questions in 3 hours; 70% to pass.
- Pass the Contractor Licensing Act exam as well; every West Virginia contractor takes it.
- Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
- Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
- You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
- Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.
Note: The Board bulletin lists the 2018 IPC and IFGC (the editions in the West Virginia State Building Code) and the 3rd Edition (2014) of Plumbing Basics for Contractors; the Division of Labor plumber bulletin lists the 4th Edition. Questions follow the 2018 codes.
Frequently asked questions
What's on the West Virginia plumbing contractor exam?
100 questions: water supply and distribution 14, drain, waste and vent systems 14, isometrics 13, general knowledge 10, fuel gas systems 10, plumbing math 9, safety 7, water heaters 7, fixtures and fittings 6, storm drainage 5 and plumbing tools 5.
Is this the same as the master plumber exam?
The topics and question count match the master plumber exam, but this one is given for the Contractor Licensing Board classification and its bulletin lists the 3rd Edition of Plumbing Basics for Contractors.
Free questions with answers
Show all 10 free questions and answers
An unlicensed company takes a $60,000 contracting job in West Virginia that requires a license. In addition to the other penalties, what does Code 30-42-14(d) allow the board to assess?
Answer: An administrative penalty of up to $200 for each day of violation
Subsection (d) applies when the contract total on the project is $25,000 or more; the $60,000 job qualifies. The board may assess an additional administrative penalty not to exceed $200 per day for each day in violation.
Reference: West Virginia Code 30-42, 30-42-14(d)
A 4-inch horizontal building drain will run 40 feet from a cleanout to the point where it meets the sewer. Using the minimum slope in Table 704.1, how much total fall must the 40-foot run have?
Answer: 5 inches
Table 704.1 requires 1/8 inch per foot for 3- to 6-inch horizontal drainage piping. The fall is 40 ft x 1/8 in/ft = 5 inches. Using 1/4 inch per foot (the 2-1/2 inch and smaller slope) gives 10 inches, and 1/16 inch per foot (8 inch and larger) gives 2.5 inches.
Reference: 2018 International Plumbing Code, Table 704.1
A contractor roughs in a flushometer-valve water closet in a public restroom. According to Table 604.5, what is the minimum fixture supply pipe size?
Answer: 1 inch
Table 604.5 lists 1 inch for a flushometer-valve water closet. A tank-type water closet needs only 3/8 inch, a one-piece water closet 1/2 inch, and a flushometer-valve urinal 3/4 inch.
Reference: 2018 International Plumbing Code, Table 604.5
A 3/4-inch relief valve discharge pipe ends over a floor. Under Section 504.6, what is the minimum distance from the end of the pipe to the floor?
Answer: 1 1/2 inches
The discharge must end not more than 6 inches and not less than two times the discharge pipe diameter above the floor or flood level rim of the receptor. For 3/4-inch pipe, 2 x 3/4 = 1-1/2 inches is the minimum; 6 inches is the maximum, and one pipe diameter is too close.
Reference: 2018 International Plumbing Code, 504.6
A plumber runs a dedicated gas line to an outdoor grill, in a location not exposed to physical damage and approved by the inspector. What is the minimum burial depth under Section 404.12.1?
Answer: 8 inches
Underground gas piping normally needs 12 inches of cover under Section 404.12, but 404.12.1 allows individual lines to outdoor lights, grills and similar appliances to be 8 inches deep where approved and not subject to physical damage.
Reference: 2018 International Fuel Gas Code, 404.12.1
Two water closets are to be set side by side in an open row with no partition between them. The row is 60 inches wide, wall to wall. Using Section 405.3.1, which layout meets the code?
Answer: Each centerline 15 inches from its end wall, with 30 inches between centerlines
Closets need at least 15 inches from the center to a side wall and at least 30 inches center to center where nothing separates them. 15 + 30 + 15 = 60 inches, so the layout just fits. The 12-inch and 10-inch layouts violate the sidewall rule, and the 24-inch layout violates the spacing rule.
Reference: 2018 International Plumbing Code, 405.3.1
A plumber proposes tying a basement floor drain into the building storm drain to save a trench. What does Section 1104.2 say?
Answer: Floor drains must not be connected to a storm drain
Section 1104.2 flatly prohibits connecting floor drains to a storm drain. Conductor pipes also cannot serve as soil, waste or vent pipes under 1104.1.
Reference: 2018 International Plumbing Code, 1104.2
A non-self-supporting ladder has a working length of 16 feet, measured along the ladder from its foot to the top support at a roof edge. How far from the wall should the ladder's foot sit, under 29 CFR 1926.1053(b)(5)(i)?
Answer: About 4 feet
The horizontal distance from the top support to the foot of the ladder should be approximately one-quarter of the working length: 16 / 4 = 4 feet. The 2, 6 and 8 foot settings are not one-quarter of the working length.
Reference: OSHA 29 CFR 1926, 1926.1053(b)(5)(i)
A 45-degree offset in a 2-inch line has a travel of 40 inches center to center. What is the set?
Answer: 28.3 inches
For 45 degrees, set = travel / 1.414: 40 / 1.414 = 28.3 inches. Multiplying by 1.414 gives 56.6 inches, which is the mistake of using the formula the wrong direction.
Reference: General trade practice: offset travel with 45-degree fittings, Set = travel / 1.414
A water line has 65 feet of static head. What is the pressure at the bottom, using 0.433 psi per foot?
Answer: 28.1 psi
Pressure equals head times 0.433: 65 x 0.433 = 28.1 psi. Dividing 65 by 0.433 gives 150.1, which inverts the factor, and multiplying 65 by 2.31 gives about 150 as well.
Reference: General trade practice: plumbing math, Head x 0.433 = psi
Sources
- Prov: West Virginia Contractor Licensing Board Candidate Information Bulletin (CIB 2026.05.07) (opens in a new tab)
- West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
- Prov: register for West Virginia exams (opens in a new tab)
- West Virginia Code Chapter 30, Article 42 (Contractor Licensing Act) (opens in a new tab)
- 28 CSR 2: Contractor Licensing Board rule (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.