West Virginia licensing exam

West Virginia Master Plumber Exam: Practice Test & Licensing Guide

The Prov exam for West Virginia master plumbers: 100 open-book questions with extra weight on isometrics, water supply and drain, waste and vent systems.

Questions
100
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge

A 4-inch cast-iron drain pipe installed in 10-foot lengths runs horizontally across a basement ceiling. Using Table 308.5 and its footnotes, what is the maximum horizontal spacing of hangers?

Requirements at a glance

AgencyWest Virginia Division of Labor (plumber licensing); exams by Prov
ExamMaster plumber exam: 100 questions, 3 hours, 70%
Books allowedIPC 2018, IFGC 2018, Mathematics for Plumbers and Pipefitters 8th Edition, Plumbing Basics for Contractors 4th Edition
Fees$59.95 per Prov exam; $75 master or journeyman license, renewed annually (42 CSR 32, 9.1)

Plumbers applying to the West Virginia Division of Labor for a master plumber license, which covers piping, fixtures, venting, water supply and gas piping work.

How to get licensed, step by step

  1. Check which license you need

    The Division of Labor licenses master and journeyman plumbers; plumbers-in-training take no exam. Call (304) 558-7890 if you are unsure which exam applies; Prov cannot refund the wrong exam.

    Division of Labor candidate bulletin (Prov) (opens in a new tab)West Virginia Code 21-14 (Plumbers) (opens in a new tab)

  2. Register with Prov

    Register at provexam.com or call (866) 720-7768. Test at a Prov center or at home with remote proctoring.

    Register for your exam with Prov (opens in a new tab)Division of Labor candidate bulletin (Prov) (opens in a new tab)

  3. Take the exam

    3 hours, 70% to pass, and you see your score at the end. There is no waiting period before a retake.

    Division of Labor candidate bulletin (Prov) (opens in a new tab)

  4. Get licensed

    Send your result and the license fee to the Division of Labor.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)

How to prepare

  • The bulletin lists the 2018 IPC and IFGC. Tab the drain, waste and vent, water supply and fuel gas chapters.
  • Isometrics is 13 questions: practice adding fixture units from a riser diagram and sizing drain and vent from the tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code 2018 (ICC)
  • International Fuel Gas Code 2018 (ICC)
  • Mathematics for Plumbers and Pipefitters, 8th Edition (Delmar/Cengage)
  • Plumbing Basics for Contractors, 4th Edition, 2021 (Pearson)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
General Knowledge10
Fixtures & Fittings6
Storm Drainage5
Fuel Gas Systems10
Safety7
Isometrics13
Water Supply and Distribution14
Water Heaters7
Drain, Waste and Vent Systems14
Plumbing Math9
Plumbing Tools5

Exam day details

  • Administered by Prov, Inc. for the West Virginia Division of Labor.
  • Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
  • 100 questions in 3 hours; 70% to pass.
  • Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
  • Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
  • You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
  • Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.

Note: The Prov bulletin lists the 2018 IPC and IFGC, the editions in the West Virginia State Building Code (87 CSR 4). Questions follow the 2018 editions.

Frequently asked questions

What's on the West Virginia master plumber exam?

100 questions: water supply and distribution 14, drain, waste and vent systems 14, isometrics 13, general knowledge 10, fuel gas systems 10, plumbing math 9, safety 7, water heaters 7, fixtures and fittings 6, storm drainage 5 and plumbing tools 5.

How is the master exam different from the journeyman exam?

It has 100 questions instead of 80 and adds Mathematics for Plumbers and Pipefitters to the reference list. Both are 3 hours and 70% to pass.

Free questions with answers

Show all 10 free questions and answers
  1. A 4-inch cast-iron drain pipe installed in 10-foot lengths runs horizontally across a basement ceiling. Using Table 308.5 and its footnotes, what is the maximum horizontal spacing of hangers?

    Answer: 10 feet

    Table 308.5 gives 5 feet for cast-iron pipe, but footnote a increases the maximum horizontal spacing to 10 feet where 10-foot lengths of pipe are installed. Steel pipe at 12 feet is a different row.

    Reference: 2018 International Plumbing Code, Table 308.5, footnote a

  2. What is the minimum thickness of a plastic water closet floor flange?

    Answer: 0.25 inch

    IPC 405.4.1 sets 0.125 inch for copper alloy flanges and 0.25 inch for plastic flanges. Cast iron or malleable iron flanges are also 0.25 inch with at least a 2-inch caulking depth.

    Reference: 2018 International Plumbing Code, 405.4.1

  3. In a one-family dwelling, which fixture is NOT required by IPC 606.2 to have a shutoff valve on its supply?

    Answer: A bathtub

    IPC 606.2 requires a shutoff valve on the supply to each fixture other than bathtubs and showers in one- and two-family dwellings. Sillcocks also need a shutoff on the supply pipe.

    Reference: 2018 International Plumbing Code, 606.2

  4. A water heater is installed in an attic that is reached through an opening and passageway. What are the passageway minimums in IPC 502.3?

    Answer: 30 inches high, 22 inches wide and no more than 20 feet long to the heater

    IPC 502.3 requires an opening and unobstructed passageway large enough to remove the heater, not less than 30 inches high and 22 inches wide and not more than 20 feet long measured along the centerline, with continuous solid flooring.

    Reference: 2018 International Plumbing Code, 502.3

  5. What is the minimum slope for a 4-inch horizontal drainage pipe under Table 704.1?

    Answer: 1/8 inch per foot

    Table 704.1 gives 1/4 inch per foot for 2 1/2 inch and smaller, 1/8 inch per foot for 3 to 6 inch, and 1/16 inch per foot for 8 inch and larger. Piping upstream of a grease interceptor must be at least 1/4 inch per foot (704.1).

    Reference: 2018 International Plumbing Code, Table 704.1

  6. What does IPC 1101.3 say about storm water draining into sewers?

    Answer: Storm water may not be drained into sewers intended for sewage only

    IPC 1101.3 prohibits draining storm water into sewers intended for sewage only. Combined sewers are covered in 1103 and 1109.

    Reference: 2018 International Plumbing Code, 1101.3

  7. A gas piping system has a maximum working pressure of 5 psig. What is the minimum test pressure under IFGC 406.4.1?

    Answer: 7.5 psig

    IFGC 406.4.1 requires a test pressure of not less than 1 1/2 times the proposed maximum working pressure, but not less than 3 psig: 1.5 x 5 = 7.5 psig. Three psig is the floor for low-pressure systems, not the answer here.

    Reference: 2018 International Fuel Gas Code, 406.4.1

  8. A plumber works in a trench 5 feet deep with no stairway nearby. What does 29 CFR 1926.651(c)(2) require for means of egress?

    Answer: A ladder, stairway or ramp so no worker travels more than 25 feet laterally

    Section 1926.651(c)(2) requires a stairway, ladder, ramp or other safe egress in trench excavations 4 feet or more deep, located so no more than 25 feet of lateral travel is needed.

    Reference: 29 CFR 1926 (OSHA construction standards), 1926.651(c)(2)

  9. Two 45-degree elbows are used to offset a pipe run by 20 inches. Using the 1.414 constant, what is the length of the diagonal piece, center to center of the fittings?

    Answer: 28.28 inches

    For 45-degree fittings the travel equals the offset times 1.414: 20 x 1.414 = 28.28 inches. Dividing by 1.414 gives 14.14 inches, a common slip.

    Reference: General trade practice: isometric drawing and offset geometry, Offset travel = offset / sin(angle); 45 degrees = 1.414

  10. A rectangular tank is 4 feet long, 3 feet wide and 2 feet deep. How many gallons does it hold when full? Use 7.48 gallons per cubic foot.

    Answer: About 180 gallons

    The volume is 4 x 3 x 2 = 24 cubic feet, and 24 x 7.48 = 179.5 gallons, or about 180 gallons.

    Reference: General trade practice: plumbing math, Volume of a rectangular solid x 7.48 gal/ft3

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.