West Virginia licensing exam

West Virginia HVAC Technician Exam: Practice Test & Licensing Guide

The Prov exam for West Virginia HVAC technicians working on residential and commercial systems: 80 open-book questions, with 47 on air distribution and venting.

Questions
80
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Air Distribution and Venting

A bedroom receives 110 cfm of supply air from a central system. According to IMC 601.5, what is the most return air that may be taken from that room?

Requirements at a glance

AgencyWest Virginia Division of Labor (HVAC technician licensing); exams by Prov
ExperienceAt least 2,000 hours of HVAC-related work, training and experience (W. Va. Code 21-16-2; 42 CSR 34, 6.3)
ExamHVAC technician exam: 80 questions, 3 hours, 70%
Books allowedOpen book with the references in the Prov bulletin (older or newer editions are allowed). Highlighting and permanent tabs only; no handwritten notes or sticky notes. Simple 4-function calculator.
Fees$59.95 per Prov exam; $75 annual license fee (42 CSR 34, 10.1)

Technicians applying to the West Virginia Division of Labor for an HVAC technician license covering residential and commercial heating, ventilating and air conditioning work.

How to get licensed, step by step

  1. Check which license you need

    Residential technicians work on residential systems only; HVAC technicians work on residential and commercial systems. Call the Division of Labor at (304) 558-7890 if unsure.

    Division of Labor candidate bulletin (Prov) (opens in a new tab)West Virginia Code 21-16 (HVAC technicians) (opens in a new tab)

  2. Register with Prov

    Register at provexam.com or call (866) 720-7768. Test at a Prov center or at home with remote proctoring.

    Register for your exam with Prov (opens in a new tab)

  3. Take the exam

    3 hours, 70% to pass, with your score on the spot. No waiting period before a retake.

    Division of Labor candidate bulletin (Prov) (opens in a new tab)

  4. Get licensed

    Send your result and the license fee to the Division of Labor.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)

How to prepare

  • Air distribution and venting is 47 of the 80 questions. Spend most of your time on IMC Chapters 4 to 8, duct construction and sizing.
  • Manual N (commercial load calculations) is on the reference list for this exam; know its basic method.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Mechanical Code 2018 (ICC), and the 2015 edition
  • Modern Refrigeration and Air Conditioning, 21st Edition (Goodheart-Wilcox)
  • Refrigeration and Air Conditioning Technology, 9th Edition (Cengage)
  • Sheet Metal Level 2 and Level 3, 2020 (Pearson)
  • SMACNA HVAC Duct Construction Standards, Metal and Flexible, 4th Edition
  • SMACNA Residential Comfort System Installation Standards Manual, 2016
  • Manual N: Commercial Load Calculations, 2008 (ACCA)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
General Knowledge8
Refrigerants and Oils5
Controls5
Air Distribution and Venting47
Piping5
Equipment5
Installation and Maintenance Practices5

Exam day details

  • Administered by Prov, Inc. for the West Virginia Division of Labor.
  • Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
  • 80 questions in 3 hours; 70% to pass.
  • The HVAC technician license requires at least 2,000 hours of HVAC-related work, training and experience (W. Va. Code 21-16-2; 42 CSR 34, 6.3).
  • Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
  • Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
  • You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
  • Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.

Frequently asked questions

What's on the West Virginia HVAC technician exam?

80 questions: air distribution and venting 47, general knowledge 8, refrigerants and oils 5, controls 5, piping 5, equipment 5 and installation and maintenance practices 5.

Which books can I bring?

The IMC 2018, Modern Refrigeration and Air Conditioning 21st Edition, Refrigeration and Air Conditioning Technology 9th Edition, Sheet Metal Levels 2 and 3, the SMACNA duct standard and residential manual and ACCA Manual N, with highlighting and permanent tabs only.

Free questions with answers

Show all 10 free questions and answers
  1. A bedroom receives 110 cfm of supply air from a central system. According to IMC 601.5, what is the most return air that may be taken from that room?

    Answer: No more than 110 cfm

    The amount of return air taken from any room or space may not be greater than the supply airflow delivered to that room, so the limit here is 110 cfm. Taking more would depressurize the room and draw in air from outside the conditioned space. A transfer grille does not lift the limit.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 601.5

  2. A listed, coated duct is run under a slab and must drain to an access point 40 feet away. Using the minimum slope in IMC 603.8.1, what is the least total drop over the 40-foot run?

    Answer: 5 inches

    IMC 603.8.1 requires a minimum slope of 1/8 inch per foot for underground ducts. 40 ft x 1/8 in/ft = 5 inches of total drop. 3 1/3 inches comes from using 1/12 in/ft, 2 1/2 inches from 40 x 1/16, and 10 inches from doubling the slope, none of which match the code.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 603.8.1

  3. How much HVAC-related work, training and experience does W. Va. Code 21-16-2 say a person must have to be an HVAC technician rather than a technician in training?

    Answer: At least 2,000 hours

    W. Va. Code 21-16-2(c) defines an HVAC technician as a person with at least 2,000 hours of HVAC-related work, training and experience, and 21-16-2(f) defines a technician in training as someone with less than 2,000 hours. The 6,000-hour figure appears only in the 2016 grandfathering provision of 21-16-5.

    Reference: W. Va. Code 21-16 (Regulation of Heating, Ventilating, and Cooling Work), 21-16-2(c) and (f)

  4. Under 42 CSR 34-3.8, which of the following is NOT included in the rule's definition of "HVAC work"?

    Answer: Work on refrigeration lines, steam lines or hydronics

    42 CSR 34-3.8 defines HVAC work as heating, ventilating and air conditioning or cooling work, but expressly does not include work on refrigeration lines, steam lines or hydronics. Installing, repairing and replacing forced-air heating and cooling equipment and ductwork are HVAC work.

    Reference: W. Va. Code R. 42-34 (Division of Labor HVAC rule, 42 CSR 34), 42-34-3.8

  5. Which refrigerant may be used in a system, according to IMC 1102.2?

    Answer: The refrigerant the equipment was designed to use or was converted to use

    IMC 1102.2 says the refrigerant shall be the one the equipment or appliance was designed to utilize or converted to utilize. Refrigerants not identified in Table 1103.1 must be approved before use. Safety group alone does not make a substitute acceptable.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 1102.2

  6. Which refrigerant is listed in IMC Table 1103.1 with a safety classification of A3, meaning higher flammability and lower toxicity?

    Answer: R-290 (propane)

    Table 1103.1 lists R-290 (propane) as A3. R-134a and R-22 are A1 (lower toxicity, no flame propagation) and R-717 ammonia is B2 (higher toxicity, lower flammability). The first letter shows toxicity class and the number shows flammability.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), Table 1103.1

  7. A combustion air duct passes through a fire-rated wall and has a fire damper. Which control requirement applies to the damper under IMC 701.2?

    Answer: The damper must be interlocked with the appliance firing cycle to prevent operation when it is closed

    IMC 701.2 says volume, smoke or fire dampers in combustion air openings must be interlocked with the firing cycle so no appliance drawing room air can operate with a damper closed. Manual dampers are not permitted in combustion air ducts.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 701.2

  8. Refrigerant piping crosses an open space that is a passageway in a building and is not against the ceiling. What is the minimum height above the floor under IMC 1107.2?

    Answer: 7 feet 3 inches

    IMC 1107.2 requires refrigerant piping that crosses an open space affording passageway to be at least 7 feet 3 inches above the floor, unless the piping is located against the ceiling of the space. The section also bars refrigerant piping from exit corridors, exit stairways, exit passageways and elevator shafts.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 1107.2

  9. How must an appliance installed at grade level be supported under IMC 304.10, if not hung from above?

    Answer: On a level concrete slab or other approved material at least 3 inches above adjoining grade

    IMC 304.10 requires equipment and appliances installed at grade to sit on a level concrete slab or other approved material at least 3 inches above adjoining grade, or to be suspended at least 6 inches above adjoining grade, in accordance with the manufacturer's installation instructions.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 304.10

  10. A condensate drain line must slope at least 1/8 unit vertical in 12 horizontal under IMC 307.2.1. What is the minimum total fall over a 30-foot horizontal run?

    Answer: 3 3/4 inches

    IMC 307.2.1 requires a minimum horizontal slope of 1/8 inch per foot (1 percent) in the direction of discharge. 30 ft x 1/8 in/ft = 3.75 inches, or 3 3/4 inches. 2 1/2 inches uses 1/12 in/ft, 7 1/2 inches doubles the slope to 1/4 in/ft, and 30 inches ignores the unit conversion.

    Reference: 2018 International Mechanical Code (West Virginia State Building Code, 87 CSR 4), 307.2.1

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.