Requirements at a glance
| Agency | West Virginia Contractor Licensing Board (Division of Labor); exams by Prov |
|---|---|
| When you need it | Contracting work of $5,000 or more residential or $25,000 or more commercial (W. Va. Code 30-42-3) |
| Exams | Electrical contractor exam: 75 questions, 3 hours, 70%, plus the Contractor Licensing Act exam |
| Books allowed | NEC 2020 (bulletin edition; older or newer allowed), American Electrician's Handbook 17th Edition |
| Fees | $59.95 per Prov exam; $90 annual Board license fee (28 CSR 2, 5.5) |
Businesses applying to the Contractor Licensing Board for the electrical contracting classification. This is separate from the State Fire Marshal's journeyman and master electrician exams.
Official links
- West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
- Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)
- Register for your exam with Prov (opens in a new tab)
- West Virginia Code 30-42 (Contractor Licensing Act) (opens in a new tab)
- 28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)
How to get licensed, step by step
Pick your classification
Every contractor passes the Contractor Licensing Act exam plus a trade exam where one exists. Check the classification definitions in 28 CSR 2.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)
Apply to the Board
Apply through the Contractor Licensing Board at the Division of Labor, (304) 558-7890.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
Take your exams with Prov
Register at provexam.com or call (866) 720-7768. 3 hours per exam, 70% to pass, score on the spot, no waiting period before a retake.
Register for your exam with Prov (opens in a new tab)Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)
Get licensed
Send your results and the license fee to the Board.
West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)West Virginia Code 30-42 (Contractor Licensing Act) (opens in a new tab)
How to prepare
- The bulletin lists the 2020 NEC; our questions come from the 2023 NEC and stay with rules unchanged since 2020. Wiring methods (20) and wiring and protection (17) are the biggest sections.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 Edition (bulletin) or 2023 EditionEssential
The Board bulletin lists the 2020 NEC (about 70% of the electrical contractor exam). Our questions use the 2023 edition and rules unchanged since 2020.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
American Electrician's Handbook, 17th Edition (McGraw Hill)
Allowed in the exam room. About 30% of the electrical contractor exam.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code 2020 (NFPA), about 70% of questions
- American Electrician's Handbook, 17th Edition (McGraw Hill), about 30%
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Communication Systems | 3 | |
| Equipment for General Use | 6 | |
| General Electrical Knowledge | 12 | |
| Motors & Controls | 5 | |
| Plan Reading | 2 | |
| Special Conditions | 4 | |
| Special Equipment | 4 | |
| Special Occupancies | 2 | |
| Wiring & Protection | 17 | |
| Wiring Methods & Materials | 20 |
Exam day details
- Administered by Prov, Inc. for the West Virginia Contractor Licensing Board.
- Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
- 75 questions in 3 hours; 70% to pass.
- Pass the Contractor Licensing Act exam as well; every West Virginia contractor takes it.
- Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
- Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
- You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
- Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.
Note: The Contractor Licensing Board bulletin lists the 2020 NEC for this exam; the State Fire Marshal says the 2023 NEC applies to its electrician exams from January 1, 2026. Our questions are written from the 2023 NEC and limited to rules unchanged since 2020, checked against the 2020 to 2023 crosswalk. Confirm the edition with the Board before you test.
Frequently asked questions
What's on the West Virginia electrical contractor exam?
75 questions: wiring methods and materials 20, wiring and protection 17, general electrical knowledge 12, equipment for general use 6, motors and controls 5, special conditions 4, special equipment 4, communication systems 3, plan reading 2 and special occupancies 2.
Which NEC edition is the exam based on?
The Board bulletin lists the 2020 NEC. Our questions are written from the 2023 NEC and limited to rules unchanged since 2020, so they still apply if you bring the 2020 book. Check the Board for the current edition.
Free questions with answers
Show all 10 free questions and answers
Rigid metal conduit is installed underground to a pole light in a lawn area with no concrete or other special cover. Under Table 300.5(A), what is the minimum burial depth (cover) to the top of the conduit?
Answer: 6 inches
Table 300.5(A), Column 2 (rigid metal conduit or intermediate metal conduit), all locations not otherwise specified, allows 6 in. of cover. Direct-buried cable needs 24 in., nonmetallic raceways such as PVC need 18 in., and 12 in. applies to GFCI-protected residential branch circuits.
Reference: NEC 2023 (NFPA 70-2023), Table 300.5(A)
Service-entrance conductors are 3/0 AWG copper. What is the minimum size copper grounding electrode conductor under Table 250.66, assuming it runs to a ground ring, building steel or similar electrode that is not limited by 250.66(A) through (C)?
Answer: 4 AWG
Table 250.66: copper service conductors of 2/0 or 3/0 AWG require a 4 AWG copper grounding electrode conductor. 8 AWG is for 2 AWG or smaller, 6 AWG is for 1 or 1/0 AWG, and 2 AWG is for sizes over 3/0 through 350 kcmil.
Reference: NEC 2023 (NFPA 70-2023), Table 250.66
A 5-horsepower, 230-volt, three-phase squirrel-cage motor with a continuous duty rating is on a branch circuit. Using Table 430.250 (full-load current 15.2 A), what is the minimum conductor ampacity under 430.22?
Answer: 19.0 amperes
430.22 requires branch-circuit conductors for a single continuous-duty motor to have an ampacity of at least 125 percent of the full-load current from Table 430.250 (per 430.6(A)(1), not the nameplate): 15.2 x 1.25 = 19.0 A. Using the FLC unmodified gives 15.2 A; 150 percent gives 22.8 A.
Reference: NEC 2023 (NFPA 70-2023), 430.22, 430.6(A)(1), Table 430.250
Egress lighting in a theater is fed from an Article 700 emergency system with a generator. Once utility power is lost, the generator must pick up the egress lighting within how many seconds at most?
Answer: 10 seconds
700.12 requires emergency lighting and power to be available within the time required for the application but not to exceed 10 seconds. The 60-second limit is for legally required standby systems under 701.12.
Reference: NEC 2023 (NFPA 70-2023), 700.12
For a permanently installed swimming pool, where must the required general-purpose 125-volt receptacle be located relative to the inside wall of the pool?
Answer: Not less than 6 feet and not more than 20 feet from the inside wall
680.22(A)(1) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit not less than 1.83 m (6 ft) and not more than 6.0 m (20 ft) from the inside wall of the pool, and not more than 6 ft 6 in. above the floor, platform or grade.
Reference: NEC 2023 (NFPA 70-2023), 680.22(A)(1)
In a Class I, Division 1 location, a conduit enters an explosionproof enclosure that contains arcing equipment (a switch). Within what distance of the enclosure must the conduit seal be installed?
Answer: 18 inches
501.15(A)(1) requires conduit seals to be installed within 450 mm (18 in.) of the enclosure, or as required by the enclosure marking. The 10 ft figure applies to the seal at the Division 1 boundary under 501.15(A)(4).
Reference: NEC 2023 (NFPA 70-2023), 501.15(A)(1)
A communications grounding electrode conductor must carry the current of a large cable sheath. What is the largest size the Code ever requires for that conductor?
Answer: 6 AWG
800.100(A)(3) states the conductor is not required to exceed 6 AWG, even when the aggregate current-carrying capacity of the cable members would call for a larger one. The minimum size is 14 AWG.
Reference: NEC 2023 (NFPA 70-2023), 800.100(A)(3)
What is the maximum height above the floor of the center of the grip of a switch operating handle in its highest position, under the general rule?
Answer: 6 feet 7 inches
404.8(A) requires switches and circuit breakers used as switches to be installed so the center of the grip of the operating handle, in its highest position, is not more than 2.0 m (6 ft 7 in.) above the floor or working platform, with exceptions such as busway installations and equipment-adjacent switches.
Reference: NEC 2023 (NFPA 70-2023), 404.8(A)
Two resistive loads of 30 ohms and 20 ohms are connected in parallel. What is the equivalent resistance?
Answer: 12 ohms
For two parallel resistors, R = (R1 x R2) / (R1 + R2) = (30 x 20) / 50 = 12 ohms. The sum (50) is the series answer, the average (25) has no basis, and 600 is the product alone.
Reference: General trade practice, Parallel resistance (product over sum)
A run of conduit scales 6-1/4 inches on a drawing with a scale of 1/8 inch = 1 foot. What is the actual run length?
Answer: 50 feet
At 1/8 in. = 1 ft, each inch represents 8 ft: 6.25 x 8 = 50 ft. Using 4 ft per inch (the 1/4 in. scale) gives 25 ft.
Reference: General trade practice, Architectural scale reading (1/8 in. = 1 ft)
Sources
- Prov: West Virginia Contractor Licensing Board Candidate Information Bulletin (CIB 2026.05.07) (opens in a new tab)
- West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)
- Prov: register for West Virginia exams (opens in a new tab)
- West Virginia Code Chapter 30, Article 42 (Contractor Licensing Act) (opens in a new tab)
- 28 CSR 2: Contractor Licensing Board rule (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.