Requirements at a glance
| Agency | Virginia Department of Professional and Occupational Regulation (DPOR), Board for Contractors; exams by PSI |
|---|---|
| Experience | 4 years of experience plus 80 hours of school, or 5 years plus 40 hours (confirm in 18VAC50-30-39) |
| Exam | natural gasfitter exam: 50 items, 150 minutes, 35 correct (journeyman) or 37 (master) |
| Books allowed | 2021 IFGC (Virginia Fuel Gas Code) |
| Fees | $100 (journeyman) or $125 (master) to PSI; DPOR license fee separate |
Installers of natural gas piping applying to the Virginia Board for Contractors for a natural gasfitter license.
Official links
How to get licensed, step by step
Check the education and experience rules
You must be 18 and document training and work experience. The requirements depend on the license level; see 18VAC50-30-39.
Virginia Administrative Code 18VAC50-30 (tradesman regulations) (opens in a new tab)Virginia DPOR: Tradesmen licensing (opens in a new tab)
Apply to the Board for Contractors
The Board reviews your application first and approves you to take the exam. Disclose any convictions.
Register and schedule the natural gasfitter exam with PSI
After approval, pay PSI and book a seat. Your eligibility is good for one year and you can retake within that year.
Schedule with PSI (Virginia DPOR exams) (opens in a new tab)
Get licensed
Send your passing result to the Board with the license fee ($150 for an original journeyman or master license; additional designations $105). Trade licenses run three years and need continuing education (3 hours per designation) on the current code edition.
Virginia DPOR: Tradesmen licensing (opens in a new tab)Virginia Administrative Code 18VAC50-30 (tradesman regulations) (opens in a new tab)
How to prepare
- Bring the editions on PSI's list: the 2020 NEC for electrical and the 2021 IPC, IMC and IFGC (Virginia Plumbing, Mechanical and Fuel Gas Codes) for plumbing, HVAC and gas. Virginia's 2024 code cycle (NEC 2023 and the 2024 I-codes) is tentatively set to take effect in October 2027; until PSI publishes a new bulletin, code questions use the 2021 USBC editions.
- Exam fees may change: a rule effective 3/11/2026 raised the Board's exam fee caps, though DPOR still lists $100 for journeyman and $125 for master exams. Confirm the fee with PSI when you register.
- Tab your books before exam day with permanent tabs. You can highlight, underline and index, but you can't write in them, use removable tabs or bring loose papers or study guides.
- Ten items on every journeyman and master exam (nine on the residential exams) come from the Board's rules, 18VAC50-30. They are easy points if you read the regulation once.
- Natural gas piping (18) and pipe sizing (14) are 32 of the 50 items; there is no LP-gas tank section.
- Gas piping controls (5) and testing (3) are small but predictable: tab the IFGC pressure test and shutoff valve sections.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Virginia Fuel Gas Code and 18VAC50-30. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 Virginia Fuel Gas Code (2021 IFGC with Virginia amendments)Essential
Allowed in the exam room. The core of all three gasfitter exams: gas piping, sizing, controls and testing.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Board for Contractors Individual License and Certification Regulations (18VAC50-30)Essential
Free online. Ten items on every journeyman and master exam come from this regulation.
Virginia Administrative Code 18VAC50-30 (tradesman regulations) (opens in a new tab)
Official reference list (as published by the testing agency)
- International Fuel Gas Code (IFGC), 2021, with Virginia amendments (Virginia Fuel Gas Code); the 2018 edition was also accepted until 5/1/2025
- Board for Contractors Individual License and Certification Regulations (18VAC50-30)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Standards of Practice | 3 | |
| Standards of Conduct | 2 | |
| Renewal and Reinstatement | 2 | |
| Definitions | 1 | |
| Qualification for Licensure | 1 | |
| Revocation | 1 | |
| Natural and LP Gas Piping | 18 | |
| Pipe Sizing | 14 | |
| Gas Piping Controls | 5 | |
| Testing | 3 |
Exam day details
- Administered by PSI Services for the Virginia Department of Professional and Occupational Regulation (DPOR), Board for Contractors.
- Fee: $100 (journeyman) or $125 (master) to PSI per exam, not refundable or transferable and valid for one year. DPOR application and license fees are separate.
- 50 items in 150 minutes. Passing score 35 (70%) at the journeyman level and 37 (74%) at the master level.
- Eligibility for the natural gas fitter license is 4 years of experience plus 80 hours of school, or 5 years plus 40 hours (18VAC50-30-39; confirm the current rule).
- Unlike the gasfitter and LP exams, this one has no LP-gas tank section; piping (18) and sizing (14) make up most of it.
- Open book: bring your own bound copies of the listed references. You may highlight, underline and index them beforehand and add permanent tabs, but removable tabs, loose papers, writing and study guides are not allowed.
- PSI may add unscored experimental questions to the exam.
- Exam fees may change: a rule effective 3/11/2026 raised the Board's exam fee caps, though DPOR still lists $100 (journeyman) and $125 (master). Confirm the fee with PSI when you register.
- The Board for Contractors must approve your application first (education and experience); then you pay and register with PSI. Your exam eligibility is good for one year and you can retake within that year.
- Every Virginia tradesman exam includes 10 items on the Board's rules (18VAC50-30): standards of practice, standards of conduct, renewal and reinstatement, definitions, qualification for licensure and revocation.
Note: These facts come from the PSI bulletin dated 1/14/2025; no newer bulletin was found. The 2021 Virginia USBC (NEC 2020 and the 2021 I-codes) is in force now. Virginia's 2024 code cycle (NEC 2023 and the 2024 I-codes) is tentatively scheduled to take effect in October 2027, and PSI will likely update its bulletin then; that date is not confirmed. Check the current PSI bulletin before you test.
Frequently asked questions
How many questions are on the Virginia natural gasfitter exam?
50 items in 150 minutes. Ten cover the Board's rules and the rest cover natural gas piping, sizing, controls and testing.
Which books can I bring?
The 2021 International Fuel Gas Code (Virginia Fuel Gas Code). NFPA 58 is not on this exam's list.
Is there an LP-gas section?
No. LP-gas tanks are only on the gasfitter and LP gasfitter exams.
Free questions with answers
Show all 10 free questions and answers
A natural gas fitter provider's license expired 45 days ago and the holder wants to reinstate it. What reinstatement fee applies?
Answer: $160, which includes the renewal fee
Reinstatement is required once renewal is not completed within 30 days after expiration. The natural gas fitter provider reinstatement fee is $160, and the asterisked note says that amount includes the renewal fee, so it is not added to the $110 renewal. $210 is the tradesman figure.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-130 A and B
A natural gas fitter moves to a new home. Within what time must the change of address be reported to the Board, and in what form?
Answer: Within 30 days, in writing, and a post office box alone is not acceptable
Any address change must be reported in writing to the Board within 30 days. The Board is not responsible for notices the regulant misses because of a failure to report, and a post office box alone does not satisfy the rule.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-160
A natural gas fitter is convicted of a felony after being licensed. By what deadline must the fitter inform the Board in writing?
Answer: Within 30 days
The regulations make it a prohibited act to fail to tell the Board in writing within 30 days of a conviction of any felony, or of a misdemeanor involving lying, cheating, stealing, sexual offense, non-marijuana drug distribution, physical injury, or relating to the practice of the profession.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-190 (item 11)
Which combination meets the experience and education standard to apply for the natural gas fitter provider examination?
Answer: Four years of experience and 80 hours of formal vocational training
For a journeyman LP gas fitter or natural gas fitter provider, the options are 80 hours of formal vocational training with four years of experience, or 40 hours with five years. Three years does not qualify under any row in subsection C.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-39 C
Which actions may the Board take against a licensee found to have violated Title 54.1 or its regulations?
Answer: Remedial education or a monetary penalty, or suspend, place on probation, fail to renew or revoke
The Board may impose remedial education or a monetary penalty, or suspend, place on probation, fail to renew, or revoke, and may take a case under advisement. There is no two-violation requirement.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-185
Under the Board's definitions, what does gas fitting-related work include?
Answer: Installing, repairing or removing fuel gas piping, vents and appliances annexed to real property
The 'gas fitter' definition covers installation, repair, improvement or removal of industrial gas, fuel gas, gaseous hydrogen, LP or natural gas piping, tanks, chimneys and vents, direct vents, equipment and appliances annexed to real property.
Reference: Board for Contractors Individual License and Certification Regulations (18VAC50-30), 18VAC50-30-10 (Gas fitter)
A line to an outdoor gas grill is run underground in a location not subject to physical damage and the installation is approved. What is the minimum depth below finished grade?
Answer: 8 inches
Section 404.12.1 allows individual lines to outdoor lights, grills and other appliances to be buried not less than 8 inches below finished grade where approved and where the location is not susceptible to physical damage. The general rule in 404.12 is 12 inches.
Reference: 2021 International Fuel Gas Code (Virginia Fuel Gas Code), Section 404.12.1
Using Table 402.4(1) (Schedule 40 pipe, inlet pressure under 2 psi, 0.3 in. w.c. drop), what is the smallest nominal size that can carry 200 cfh of natural gas over a 40-foot run?
Answer: 1 inch
At 40 feet the table lists 62 cfh for 1/2 inch, 129 cfh for 3/4 inch, 243 cfh for 1 inch and 499 cfh for 1 1/4 inch. The smallest size whose capacity is at least 200 cfh is 1 inch (243 cfh); 3/4 inch (129 cfh) is too small.
Reference: 2021 International Fuel Gas Code (Virginia Fuel Gas Code), Table 402.4(1)
An appliance shutoff valve is installed in the same room as the appliance. What distance and location rules apply?
Answer: Within 6 feet of the appliance, accessible, and upstream of the union or connector it serves
Section 409.5.1 requires the appliance shutoff to be in the same room, within 6 feet, installed upstream of the union, connector or quick-disconnect it serves, and provided with access. For movable appliances like ranges and dryers, a valve behind the appliance counts as accessible.
Reference: 2021 International Fuel Gas Code (Virginia Fuel Gas Code), Section 409.5.1
A new gas system will operate at 10 psig. What is the minimum test pressure?
Answer: 15 psig
Section 406.4.1 requires a test pressure not less than 1 1/2 times the proposed maximum working pressure, but not less than 3 psig: 1.5 x 10 = 15 psig. 10 psig is the working pressure itself, and 3 psig is only the floor for low-pressure systems.
Reference: 2021 International Fuel Gas Code (Virginia Fuel Gas Code), Section 406.4.1
Sources
- PSI: Virginia Individual License and Certification Candidate Information Bulletin (1/14/2025) (opens in a new tab)
- Virginia DPOR: Tradesmen licensing (opens in a new tab)
- Virginia Administrative Code 18VAC50-30 (tradesman regulations) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.