Requirements at a glance
| Agency | Vermont Division of Fire Safety (Plumbers' Examining Board); exam by Prov |
|---|---|
| Exam | 97 questions, 3 hours, open book, 70% to pass |
| Experience | 12 months as a journeyman plumber or equivalent experience |
| Books allowed | 2025 Vermont Plumbing Rules; 2024 IPC; Basic Safety (NCCER, 2015) |
| Fees | $80 to Prov; Division application and license fees are separate |
Plumbers applying to the Vermont Division of Fire Safety (Plumbers' Examining Board) for a master license. Vermont asks for 12 months as a journeyman or equivalent experience, then a passing exam score.
Official links
How to get licensed, step by step
Meet the experience requirement
Hold a journeyman license for 12 months or have equivalent experience the Board accepts. Check the Division's page for the current requirement.
Vermont Division of Fire Safety: plumbing licensing (opens in a new tab)26 V.S.A. chapter 39 (plumbers) (opens in a new tab)
Apply to the Division of Fire Safety
Send the application and fee to Trade Licensing in Waterbury (802-479-7564). The Division confirms your eligibility and, once the Board approves you, sends your details to Prov. Check its page for current forms and fees.
Vermont Division of Fire Safety: plumbing licensing (opens in a new tab)
Schedule with Prov
Once the Board approves you, it sends your details to Prov. Schedule at provexam.com/scheduler (sign in with your email and last name) or by phone at 801-733-4455. Prov lists one Vermont test center, in Lyndonville; you can also test at any Prov center in the U.S. or remotely from home through Examroom.ai. You get your score as soon as you finish.
Schedule with Prov (opens in a new tab)Prov: Vermont Fire Safety Candidate Information Bulletin (PDF) (opens in a new tab)
Get licensed
Prov reports your result to the Division, which issues the license. Licenses run 2 years. The license fee is $90 for a journeyman, $120 for a master and $50 per specialty field (26 V.S.A. 2193), and renewal needs 8 hours of Board-approved instruction in the preceding 24 months (26 V.S.A. 2195).
Vermont Division of Fire Safety: plumbing licensing (opens in a new tab)26 V.S.A. chapter 39 (plumbers) (opens in a new tab)
Complete the Vermont energy goals module
Vermont requires a Vermont Energy Goals education module (no more than 2 hours by law; the Division says it takes about 20 minutes) before an initial license and each renewal. Send the completion certificate with your application.
Vermont Division of Fire Safety: trade licensing (opens in a new tab)
How to prepare
- Drainage (16) and vents (16) are 32 of 97 questions; water supply (12) and plan reading (12) follow.
- Safety is 8 questions, more than on the journeyman exam.
- The 2025 Vermont Plumbing Rules adopt the 2024 IPC with Vermont amendments, including gas piping and sprinklers moving to the Fire and Building Safety Code. The Division's web page still mentions the 2021 IPC; the rules and the Prov bulletin name 2024.
- You can take the exam up to 3 times on one approval (good for 3 years), with no waiting period and the same $80 fee each time; after that you reapply.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2024 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2024 International Plumbing Code (IPC), ICCEssential
Allowed in the exam room. Nearly all of the plumber exams come from it, with the Vermont amendments.
ICC (opens in a new tab)Read free (ICC codes) (opens in a new tab)
Basic Safety, 2015 (NCCER)
Allowed in the journeyman and master plumber exams.
Official reference list (as published by the testing agency)
- 2025 Vermont Plumbing Rules (open book)
- International Plumbing Code, 2024 (open book)
- Basic Safety, 2015, NCCER (open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge & Plumbing Math | 11 | |
| Fixtures & Fittings | 6 | |
| Water Heaters | 6 | |
| Water Supply and Distribution | 12 | |
| Sanitary Drainage & Indirect/Special Waste | 16 | |
| Vents & Vent Systems | 16 | |
| Traps, Interceptors & Separators | 4 | |
| Storm & Roof Drainage | 6 | |
| Plan Reading & Isometrics | 12 | |
| Safety | 8 |
Exam day details
- Administered by Prov, Inc. for the Vermont Department of Public Safety, Division of Fire Safety.
- Fee: $80 to Prov per exam. Division application and license fees are separate.
- 97 questions in 3 hours; 70% to pass.
- Open book: only the references marked open book below are permitted in the exam room. Pen highlighting and underlining and permanent tabs are allowed; Post-it notes, loose formula sheets and marking your books during the exam are not.
- Once the Board approves you, it sends your details to Prov; schedule at provexam.com/scheduler or by phone at 801-733-4455. Prov lists one Vermont test center (Lyndonville), any Prov center in the U.S., or remote testing from home through Examroom.ai.
- You can take the exam up to 3 times on one approval, with no waiting period between attempts; after that you reapply to the Division. The approval is good for 3 years. Each attempt costs the $80 exam fee.
Note: The 2025 Vermont Plumbing Rules and the Prov bulletin both name the 2024 IPC. The Division's plumbing web page still mentions the 2021 IPC, so check the current bulletin before your test date.
Frequently asked questions
What's on the Vermont master plumber exam?
97 questions: sanitary drainage and indirect/special waste 16, vents and vent systems 16, water supply and distribution 12, plan reading and isometrics 12, general knowledge and plumbing math 11, safety 8, fixtures and fittings 6, water heaters 6, storm and roof drainage 6, and traps, interceptors and separators 4.
How is it different from the journeyman exam?
It has 97 questions against 80 and weights water supply, plan reading and safety more heavily. Both are 3 hours and use the same three references.
Which IPC edition is on the exam?
The 2024 IPC with Vermont's amendments in the 2025 Vermont Plumbing Rules.
Free questions with answers
Show all 10 free questions and answers
A 3-inch waste line from a restaurant pot sink runs to a grease interceptor. What is the minimum slope for this 3-inch line?
Answer: 1/4 inch per foot
Section 704.1 sets Table 704.1 slopes as the minimum, but piping upstream of a grease interceptor must be sloped not less than 1/4 inch per foot (2 percent). Table 704.1 alone would allow 1/8 inch per foot for a 3-inch pipe, which is the tempting wrong answer.
Reference: 2024 International Plumbing Code (Vermont amended), Section 704.1
Under Section 901.2, what is the maximum pressure differential to which a fixture trap seal may be subjected by a properly vented system?
Answer: 1 inch of water column
The vent system must admit or release air so that no trap seal sees a pressure differential of more than 1 inch of water column. That is why venting protects the seal against siphonage and blowout; a 2 to 4 inch seal is far larger than the differential allowed.
Reference: 2024 International Plumbing Code (Vermont amended), Section 901.2
What range of liquid seal depth is required for a fixture trap?
Answer: 2 inches minimum and 4 inches maximum
Section 1002.4 requires each fixture trap to have a liquid seal of at least 2 inches and not more than 4 inches, with deeper seals permitted for special designs relating to accessible fixtures. A deeper seal than 4 inches makes the trap harder to scour.
Reference: 2024 International Plumbing Code (Vermont amended), Section 1002.4
A flushometer-valve water closet (blowout type) is being designed. Using Table 604.3, what flow pressure is required at the fixture supply outlet?
Answer: 45 psi
Table 604.3 lists the blowout flushometer water closet at 25 gpm and 45 psi. The siphonic flushometer valve water closet is 25 gpm at 35 psi, and a tank-type closet needs only 20 psi. Picking the siphonic row is the common error.
Reference: 2024 International Plumbing Code (Vermont amended), Table 604.3
Under the Vermont text of Section 503.3, what is required of the piping connected to a water heater, including the ASSE 1017 mixing valve and cold water shutoff?
Answer: Metallic piping extending at least 3 feet from both the hot and cold connection points, rigidly supported
Vermont's Section 503.3 requires all connections to the heater, including the mixing valve and full-port cold shutoff, to be rigidly supported with code-compliant metallic piping. The metal must extend a minimum of 3 feet from both the hot and cold connection points.
Reference: 2024 International Plumbing Code (Vermont amended), Section 503.3
What are the minimum waste outlet size for a bathtub and the connection point for the overflow under Section 407.2?
Answer: 1-1/2 inch outlet, with the overflow connected upstream of the trap
Section 407.2 requires a bathtub waste outlet not less than 1-1/2 inches with a watertight stopper, and an overflow piped to connect upstream of the fixture trap so the overflow discharges to the trap whether the stopper is open or closed.
Reference: 2024 International Plumbing Code (Vermont amended), Section 407.2
A 5,000 square foot roof is designed for a rainfall rate of 4 inches per hour. Using Q = 0.0104 x R x A and Table 1106.2, what is the smallest horizontal storm drain at 1/4 inch per foot slope?
Answer: 5 inches
Q = 0.0104 x 4 in/hr x 5,000 sq ft = 208 gpm. Table 1106.2 at 1/4 inch per foot gives 163 gpm for 4-inch pipe, which is too small, and 234 gpm for 5-inch pipe, which carries 208 gpm. A 6-inch pipe works but is larger than needed.
Reference: 2024 International Plumbing Code (Vermont amended), Section 1106.2; Table 1106.2
A 45-degree offset must move a pipe 12 inches sideways. What is the travel (centerline length of the offset piece)?
Answer: About 17 inches
For a 45-degree offset, travel = offset x 1.414. 12 x 1.414 = 16.97 inches, about 17 inches. The 12-inch distance is the offset, not the travel, and 24 inches would be the travel for a 30-degree offset (offset x 2).
Reference: Plumbing math (general knowledge), Plumbing math (not a code section)
The upstream invert of a 48-foot horizontal building drain is shown at elevation 100.00 feet. The drawing calls for a slope of 1/4 inch per foot. What invert elevation applies at the downstream end?
Answer: 99.00 feet
Fall = 48 ft x 1/4 inch per foot = 12 inches = 1.00 foot. Downstream invert = 100.00 - 1.00 = 99.00 feet. An answer of 99.50 would be a 1/8 inch per foot slope.
Reference: Plan reading (general knowledge), Table 704.1; Blueprint reading (invert elevations)
Unless the trench is in stable rock, at what depth does OSHA require a protective system even when a competent person finds no indication of a possible cave-in?
Answer: 5 feet
29 CFR 1926.652(a)(1) requires protection from cave-ins with sloping, shoring or a shield, except in stable rock or where an excavation under 5 feet deep shows no indication of cave-in after a competent person's examination. The 4-foot figure is the depth at which a means of egress is required.
Reference: OSHA 29 CFR Part 1926, 29 CFR 1926.652(a)(1)
Sources
- Prov: Vermont Fire Safety Candidate Information Bulletin (2026.11.09, PDF) (opens in a new tab)
- Vermont Division of Fire Safety: plumbing licensing (opens in a new tab)
- 2025 Vermont Plumbing Rules (Division of Fire Safety) (opens in a new tab)
- 26 V.S.A. chapter 39 (plumbers) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.