Requirements at a glance
| Experience | 48 months under a licensed ACR contractor in the past 72 months, or 12 months as a certified technician + 36 months |
|---|---|
| Exam | Class A: 120 scored items, 240 min, $74. Class B: 100 scored items, 180 min, $60. 70% to pass. |
| Books | 2024 IMC or UMC, 2024 IFGC, Modern Refrigeration, Texas ACR law and rules |
| After passing | Certificate of general liability insurance (higher limits for Class A) |
| Fees | $115 TDLR application + PSI exam fee |
Refrigeration contractors in Texas: 48 months of supervised ACR experience in the past 72 months (or 12 months as a certified technician plus 36 months of experience).
Official links
- TDLR: apply for an ACR contractor license (opens in a new tab)
- TDLR: ACR exam information (opens in a new tab)
- PSI ACR candidate bulletin (opens in a new tab)
- Schedule with PSI (TDLR exams) (opens in a new tab)
- Texas Occupations Code Chapter 1302 (opens in a new tab)
- TDLR ACR rules (16 TAC Chapter 75) (opens in a new tab)
How to get licensed, step by step
Choose Class A or Class B
Class A covers any size equipment; Class B is limited to cooling systems of 25 tons or less. The Commercial Refrigeration endorsement covers coolers, freezers, ice machines and similar equipment.
TDLR: apply for an ACR contractor license (opens in a new tab)
Apply to TDLR
Submit the contractor application with your experience verification and the $115 fee. You must pass the exam within one year of applying.
TDLR: apply for an ACR contractor license (opens in a new tab)
Schedule with PSI
Once approved, schedule at a PSI test center. The exam is open book and offered in English and Spanish. Retakes are unlimited during your eligibility year.
Schedule with PSI (TDLR exams) (opens in a new tab)PSI ACR candidate bulletin (opens in a new tab)
Send proof of insurance
After you pass, send TDLR a certificate of commercial general liability insurance to get your license.
TDLR: apply for an ACR contractor license (opens in a new tab)
How to prepare
- Refrigeration systems and design (20) and controls (14) are over a quarter of the exam. Know defrost methods, metering devices, head pressure control, pressure regulators and oil return.
- Tab IMC Chapter 11 (refrigeration): refrigerant safety groups, machinery room requirements, quantity limits and pressure testing.
- Tab the Texas ACR law (Occupations Code 1302) and rules (16 TAC 75) for 6 quick points.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2024 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2024 International Mechanical Code (IMC)Essential
Equipment access, condensate, exhaust (including dryer ducts), duct construction and refrigeration.
ICC store (opens in a new tab)Read free (opens in a new tab)
2024 International Fuel Gas Code (IFGC)
Combustion air, venting and gas pipe sizing.
ICC store (opens in a new tab)Read free (opens in a new tab)
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Refrigeration cycle, troubleshooting, piping and controls.
Texas ACR law and rules: Occupations Code Chapter 1302 and 16 TAC Chapter 75
The source of the Texas Laws and Rules questions. Print them, tab them and bring them.
Official reference list (as published by the testing agency)
- 2024 International Mechanical Code (IMC) or 2024 Uniform Mechanical Code (UMC)
- 2024 International Fuel Gas Code (IFGC)
- Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
- Texas Occupations Code Chapter 1302 and 16 Texas Administrative Code Chapter 75
- OSHA 29 CFR Part 1904 (injury recordkeeping)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| HVACR Systems and Design | 20 | |
| Controls | 14 | |
| Equipment Requirements | 12 | |
| Piping | 11 | |
| Service | 11 | |
| Basic Refrigeration Components | 10 | |
| Refrigeration Principles | 10 | |
| Safety | 7 | |
| Air Distribution | 6 | |
| Testing | 6 | |
| Texas Laws and Rules | 6 | |
| Combustion Air | 3 | |
| Ventilation | 2 | |
| Venting | 2 |
The outline totals 120; the other items on the 125-question exam are unscored or unassigned.
Exam day details
- Administered by PSI Services for the Texas Department of Licensing and Regulation (TDLR).
- Fee: $74 for Class A or $60 for Class B (PSI), plus TDLR's $115 license application fee.
- Class A (any size equipment): 120 scored items plus 5 unscored, 240 minutes, $74. Class B (cooling up to 25 tons): 100 scored items plus 5 unscored, 180 minutes, $60. The topic outline is the same; our simulation follows Class A.
- Commercial Refrigeration covers coolers, freezers, ice machines and similar equipment. Comfort heating and cooling is the Environmental Air endorsement, a separate exam.
- Since September 1, 2026 the code questions are based on the 2024 IMC, UMC and IFGC. The ACCA manuals aren't on this exam.
- Open book: bound or binder-held references, highlighted and noted beforehand, permanent tabs only. A silent non-programmable calculator is allowed.
- In TDLR's fiscal year 2025, 50% of Commercial Refrigeration Class A attempts and 38% of Class B attempts passed.
- Offered in English and Spanish. Retakes are unlimited during your one-year eligibility period.
Frequently asked questions
What's the difference between Commercial Refrigeration and Environmental Air in Texas?
They're two endorsements on the ACR contractor license, each with its own exam. Environmental Air covers comfort heating and cooling; Commercial Refrigeration covers coolers, freezers, ice machines and other refrigeration equipment. Each license holds one endorsement, but you can hold a Class A and a Class B license with different endorsements.
What's on the Texas Commercial Refrigeration exam?
Refrigeration systems and design (the biggest topic), controls, equipment requirements, piping, service and refrigeration principles, plus a few questions each on safety, testing, air distribution and Texas ACR law and rules.
Free questions with answers
Show all 10 free questions and answers
A machinery room houses a compressor rack whose system charge is 625 pounds, the largest system in the room. Using 2024 IMC Equation 11-2 (Q = 100 × G^0.5), what exhaust rate must the ventilation system deliver when the refrigerant detector actuates?
Answer: 2,500 cfm
IMC Section 1105.6.3.2 requires the emergency exhaust rate from Equation 11-2: Q = 100 × square root of G, where G is the refrigerant mass in pounds in the largest system with any part in the room. Square root of 625 = 25, and 100 × 25 = 2,500 cfm. Using 10 instead of 100 gives 250 cfm; multiplying 100 × 625 without the square root gives 62,500 cfm; and 10 × 625 gives 6,250 cfm.
Reference: 2024 International Mechanical Code, Section 1105.6.3.2, Equation 11-2
One condensing unit serves a 0°F freezer evaporator and a 35°F cooler evaporator. Which device keeps the cooler evaporator from running too cold while the compressor pulls suction pressure down for the freezer?
Answer: An evaporator pressure regulator in the cooler evaporator's suction line
In a multiple-evaporator system at different temperatures, an evaporator pressure regulator (EPR) goes in the suction line of the warmer evaporator. It throttles to hold that evaporator's pressure (and so its saturation temperature) at or above its setting no matter how low the common suction pressure falls. The freezer runs at the lowest pressure, so it needs no EPR. A crankcase pressure regulator limits pressure into the compressor to prevent motor overload, which is a different job.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 46: Commercial Refrigeration System Configurations
An air-cooled condensing unit on a roof uses a condenser-flooding head pressure control valve. On a cold winter day, how does the valve keep head pressure up?
Answer: It backs liquid refrigerant up into the condenser, reducing the active condensing surface
As ambient temperature drops, a condenser-flooding valve throttles flow out of the condenser so liquid refrigerant backs up in the coil. The flooded tubes can't condense vapor, so the effective condenser surface shrinks and head pressure stays high enough to feed the metering device. A bypass port sends some hot gas to the receiver to keep its pressure up. The system needs a receiver large enough to hold the extra charge used for flooding in winter.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 45: Commercial Metering Devices and Valves
On a semi-hermetic compressor with a forced-feed oil pump, the oil pump outlet reads 75 psig and the crankcase reads 30 psig. What net oil pressure does the oil pressure safety control sense?
Answer: 45 psi
The oil pressure safety control is a differential switch: it compares oil pump outlet pressure to crankcase (suction) pressure. Net oil pressure = 75 − 30 = 45 psi. The 75 psig reading alone includes crankcase pressure, which provides no lubrication, so it overstates oil pressure. Adding the two (105) is wrong. If net pressure stays below the setting after the time delay, the control shuts the compressor off.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 43: Commercial Compressors
A walk-in cooler using off-cycle defrost has a calculated 24-hour heat load of 240,000 Btu. Using a 16-hour compressor run time, what hourly equipment capacity is needed?
Answer: 15,000 Btu/h
The 24-hour load is divided by the planned run time, not by 24, so the equipment has time to defrost and recover. 240,000 ÷ 16 = 15,000 Btu/h. Dividing by 24 hours gives 10,000 Btu/h, which leaves no time for defrost and would undersize the system. Medium-temperature boxes with off-cycle defrost are commonly sized on about 16 hours of run time.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 51: Understanding Heat Loads and System Thermodynamics
A reach-in evaporator sits on the floor and its condensing unit is on the roof, so the suction line rises vertically. What should be installed at the bottom of the suction riser to help return oil to the compressor?
Answer: An oil trap (P-trap)
Oil travels up a suction riser only when vapor velocity is high enough to carry it. A trap at the base of the riser collects oil until it partly blocks the pipe; the vapor velocity then rises and pushes the oil slug up the riser. Horizontal suction lines are pitched toward the compressor for the same reason. A filter drier and sight glass belong in the liquid line.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 47: Installing Commercial Systems
A TXV walk-in freezer system shows low suction pressure, high evaporator superheat, low subcooling, and bubbles in the liquid line sight glass. The condenser and evaporator coils are clean. What is the most likely problem?
Answer: Refrigerant undercharge
Low subcooling and bubbles in the sight glass mean not enough liquid is backing up in the condenser, and low suction pressure with high superheat means the evaporator is starved. Together they point to a shortage of refrigerant, usually from a leak that must be found and repaired. An overcharge raises subcooling and head pressure, and a TXV stuck open causes low superheat.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 48: Troubleshooting Commercial Systems—System Diagnosis
What is the main job of a liquid receiver in a commercial refrigeration system?
Answer: To store liquid refrigerant leaving the condenser so the system can handle changing charge needs and pump-down
The receiver sits after the condenser and stores liquid refrigerant. It lets a TXV system meet changing loads, gives room for the extra charge used by condenser-flooding head pressure controls, and holds the charge during pump-down. An oil separator handles oil in the discharge line, an accumulator traps liquid in the suction line, and a liquid-suction heat exchanger subcools liquid.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 9: Basic Refrigeration and Air-Conditioning System Components
What is superheated refrigerant vapor?
Answer: Vapor at a temperature above its saturation temperature for its pressure
Superheated vapor is vapor whose temperature is above the saturation (boiling) temperature for its pressure. Once all the liquid has boiled off in the evaporator, any further heat raises the vapor's temperature, which is superheat. Vapor mixed with liquid droplets is a saturated mixture. 212°F is the boiling point of water at sea level only.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 8: Basic Compression Refrigeration and Air-Conditioning Systems
A contractor with the commercial refrigeration endorsement is installing a new walk-in freezer. Under 16 TAC §75.100, what control wiring may the contractor install?
Answer: Control wiring of any voltage, as long as it is on the equipment side of the disconnect installed for that purpose
Section 75.100(a)(3) lets any licensee install and service control wiring of 50 volts or less, and adds that a licensee with the commercial refrigeration endorsement may install commercial refrigeration control wiring of any voltage, as long as it is on the equipment side of the disconnect installed for that purpose. Branch circuits feeding the disconnect are electrical work outside the ACR license. All electrical work must meet at least the applicable National Electrical Code.
Reference: 16 Texas Administrative Code Chapter 75, §75.100(a)(3) and (4)
Sources
- PSI: TDLR Air Conditioning and Refrigeration Candidate Information Bulletin (opens in a new tab)
- TDLR: ACR exam information (opens in a new tab)
- TDLR: Apply for an ACR contractor license (opens in a new tab)
- TDLR: FY2025 ACR exam statistics (opens in a new tab)
Questions last verified October 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.