Tennessee licensing exam

Tennessee Full Mechanical Contractor (CMC) Exam: Practice Test & Licensing Guide

The Prov trade exam for Tennessee's CMC full mechanical contractor classification: 100 open-book questions on the 2021 IMC and IFGC, air distribution, refrigerants, piping and sprinkler systems.

Questions
100
Time limit
5 hours
Passing score
73%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Air Distribution and Vents

A contractor runs a Class 1 flexible air duct from a plenum box to a boot 40 feet away in an attic of a house. Under the 2021 IMC, how does the length of that flexible air duct compare with the code limit?

Requirements at a glance

AgencyTennessee Board for Licensing Contractors; exams by Prov
LicenseCMC full mechanical contractor
Exams100 questions, 5 hours, 73%, plus the Business and Law exam
Books allowed2021 IMC, 2021 IFGC, 2021 IBC, Refrigeration and Air Conditioning Technology, HVAC Basics for Contractors and NFPA 13 (2022)
Fees$53 per Prov exam attempt, plus the Board application ($250; renewal $200)

Qualifying individuals for a Tennessee CMC (full mechanical) license, which needs Board pre-approval, from the Board for Licensing Contractors.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.

    Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)

  2. Schedule the Business and Law exam and the CMC exam with Prov

    Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)

  3. Pass at 73%

    Every Tennessee contractor exam is open book and needs 73% to pass.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)

  4. Get licensed

    Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.

    Board: how to get a contractor license (opens in a new tab)

How to prepare

  • Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
  • Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
  • Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
  • Air distribution and vents (18) is the biggest section; refrigerants and oils (10), equipment (10) and sprinkler systems (10) follow.
  • CMC needs Board pre-approval before you schedule. Sprinkler and fire protection questions are 14 of the 100.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IMC and the 2021 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Mechanical Code (IMC), 2021
  • International Fuel Gas Code (IFGC), 2021
  • International Building Code (IBC), 2021
  • Refrigeration and Air Conditioning Technology, 7th Edition
  • HVAC Basics for Contractors, 4th Edition
  • NFPA 13: Installation of Sprinkler Systems, 2022

What's on the exam

Official content outline from Prov (number of questions per topic):

TopicQuestions
General Knowledge6
Code Requirements5
Fuel Gas Systems8
Safety8
Controls4
Electrical Concepts4
Piping8
Load Calculations5
Equipment10
Refrigerants and Oils10
Air Distribution and Vents18
Fire Protection4
Sprinkler Systems10

Exam day details

  • Administered by Prov for the Tennessee Board for Licensing Contractors.
  • Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
  • 100 questions in 5 hours; 73% to pass.
  • CMC applicants need Board pre-approval first (3 years of experience; $50 request).
  • Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
  • Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
  • You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
  • Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
  • Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.

Note: The NFPA 13 (2022) text was not available to us, so sprinkler questions stay at concept level. Check the NFPA 13 edition on your Prov reference list before you test.

Frequently asked questions

What's on the Tennessee CMC exam?

100 questions: air distribution and vents 18, equipment 10, refrigerants and oils 10, sprinkler systems 10, fuel gas systems 8, safety 8, piping 8, and smaller sections.

How is it different from CMC-C?

CMC covers all mechanical work, so it adds fire protection and sprinkler systems (14 questions) and uses NFPA 13 and the IBC. CMC-C is HVAC and refrigeration only.

Does it cover plumbing?

No plumbing topic is printed in the CMC outline. Plumbing is the CMC-A classification.

Free questions with answers

Show all 10 free questions and answers
  1. A contractor runs a Class 1 flexible air duct from a plenum box to a boot 40 feet away in an attic of a house. Under the 2021 IMC, how does the length of that flexible air duct compare with the code limit?

    Answer: It is not limited in length by the code

    Section 603.6.1.1 states that flexible air ducts are not limited in length. The 14-foot limit in 603.6.2.1 applies only to flexible air connectors. The duct still has to be listed and labeled Class 0 or Class 1 under UL 181 and be installed per Section 304.1 and the manufacturer's instructions.

    Reference: 2021 International Mechanical Code, 603.6.1.1

  2. A 100,000 Btu/h furnace and a 40,000 Btu/h water heater share a basement room that is being evaluated for indoor combustion air by the standard method. What minimum room volume does the IFGC require?

    Answer: 7,000 cubic feet

    Section 304.5.1 requires 50 cubic feet per 1,000 Btu/h of input, summed for all appliances in the space (304.5). Total input is 100,000 + 40,000 = 140,000 Btu/h, and 140 x 50 = 7,000 cubic feet. Using only the furnace gives 5,000; using 25 cubic feet per 1,000 gives 3,500.

    Reference: 2021 International Fuel Gas Code, 304.5.1

  3. A hydronic loop uses 3/4-inch copper tubing run horizontally across a mechanical room. Under IMC Table 305.4, what is the maximum spacing between hangers?

    Answer: 8 feet

    Table 305.4 lists copper or copper-alloy tubing at 8 feet horizontal and 10 feet vertical, while copper or copper-alloy pipe (rigid pipe sizes) is 12 feet horizontal. The question describes tubing, so 8 feet governs.

    Reference: 2021 International Mechanical Code, Table 305.4

  4. Recovered refrigerant from a customer's rooftop unit is being considered for use in a different customer's equipment. Under IMC Section 1102.2.2.2, what is true of recovered (not reclaimed) refrigerant?

    Answer: It may be reused only in the same system or another system of the same owner

    Section 1102.2.2.2 limits recovered refrigerant to the system it came from or other systems of the same owner, and it must be filtered and dried before reuse. Moving it to a different owner requires reclamation to AHRI 700 purity (1102.2.2.3).

    Reference: 2021 International Mechanical Code, 1102.2.2.2

  5. What is the minimum unobstructed passageway width around all sides of a boiler under IMC Section 1004.3, unless otherwise approved?

    Answer: 18 inches

    Section 1004.3 requires clearances for inspection, servicing and visibility of gauges, with passageways around all sides of boilers at least 18 inches wide unless otherwise approved.

    Reference: 2021 International Mechanical Code, 1004.3

  6. A furnace manufacturer's installation instructions require a 12-inch clearance to a combustible wall, while the IMC provision would allow 6 inches. Under Section 304.2, which governs?

    Answer: The manufacturer at 12 inches, because the code provision is less restrictive

    Section 304.2 says that where the code and the listing or manufacturer's instructions conflict, the code applies, except where a code provision is less restrictive than the listing or instructions, in which case the listing and instructions apply. Section 304.1 also requires the manufacturer's instructions on the job site at inspection.

    Reference: 2021 International Mechanical Code, 304.2

  7. Which of the following work items is listed in IMC Section 106.2 as not requiring a permit?

    Answer: A self-contained refrigeration system holding 8 pounds of refrigerant

    Section 106.2 exempts self-contained refrigeration systems with 10 pounds or less of refrigerant or actuated by motors of 1 horsepower or less, along with portable appliances, internal piping in listed equipment and replacement of minor parts. An exemption never authorizes work that violates the code.

    Reference: 2021 International Mechanical Code, 106.2

  8. A crew uses a 120-volt, 20-ampere receptacle outlet on a construction site that is not part of the permanent wiring of the building. What protection does 29 CFR 1926.404(b)(1)(ii) require for personnel?

    Answer: An approved ground-fault circuit interrupter

    Section 1926.404(b)(1)(ii) requires approved ground-fault circuit interrupters on all 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites that are not part of the permanent wiring and are in use by employees.

    Reference: 29 CFR 1926, 1926.404(b)(1)(ii)

  9. A heat gain calculation gives a total cooling load of 66,000 Btu/h. How many tons of cooling does that equal, using 12,000 Btu/h per ton?

    Answer: 5.5 tons

    66,000 / 12,000 = 5.5 tons. Dividing by 15,000 gives 4.4, by 24,000 gives 2.75, and by 10,000 gives 6.6, all mistaken conversion factors.

    Reference: HVAC Basics for Contractors, 4th Edition, Load calculations: tons of cooling

  10. Under IBC Section 903.4, which of the following must be electrically supervised by a listed fire alarm control unit on a commercial sprinkler system?

    Answer: Valves controlling the water supply, and waterflow switches

    Section 903.4 requires valves controlling the water supply, pumps, tanks, water levels and temperatures, critical air pressures and waterflow switches on sprinkler systems to be electrically supervised by a listed fire alarm control unit, with exceptions such as one- and two-family dwellings and valves locked or sealed open under listed conditions.

    Reference: 2021 International Building Code, 903.4

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.