Requirements at a glance
| Agency | Tennessee Board for Licensing Contractors; exams by Prov |
|---|---|
| License | CMC-C HVAC/refrigeration contractor |
| Exams | 100 questions, 5 hours, 73%, plus the Business and Law exam |
| Books allowed | 2021 IMC, Modern Refrigeration and Air Conditioning, the SMACNA residential standards, HVAC Basics for Contractors and 29 CFR 1926 |
| Fees | $53 per Prov exam attempt, plus the Board application ($250; renewal $200) |
Qualifying individuals for a Tennessee CMC-C (HVAC/refrigeration) license from the Board for Licensing Contractors.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.
Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)
Schedule the Business and Law exam and the CMC-C exam with Prov
Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.
Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)
Pass at 73%
Every Tennessee contractor exam is open book and needs 73% to pass.
Schedule with Prov (Tennessee contractors) (opens in a new tab)
Get licensed
Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.
How to prepare
- Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
- Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
- Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
- Air distribution and venting (23) and piping (14) are the biggest sections: tab IMC Chapters 6, 8 and 9.
- Refrigerants and oils (10) and HVAC equipment (10) come mostly from the refrigeration texts rather than the code.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Mechanical Code (IMC)Essential
Allowed in the exam room. Tennessee adopts it without amendments. The core of the HVAC exam.
ICC store (opens in a new tab)Tennessee codes (UpCodes) (opens in a new tab)
2021 International Fuel Gas Code (IFGC)
Allowed in the exam room (the plumbing exams also accept the 2018 edition). Gas piping, venting and appliances.
ICC store (opens in a new tab)Tennessee codes (UpCodes) (opens in a new tab)
Modern Refrigeration and Air Conditioning, 21st Edition (Goodheart-Willcox)
Allowed in the exam room. Refrigerants, oils, equipment and the refrigeration cycle.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2021
- Modern Refrigeration and Air Conditioning, 21st Edition
- Refrigeration and Air Conditioning Technology, 9th Edition
- SMACNA Residential Comfort System Installation Standards Manual, 8th Edition
- HVAC Basics for Contractors, 4th Edition
- 29 CFR 1926 (OSHA Construction)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 9 | |
| Code Requirements | 4 | |
| Fuel Gas Systems | 10 | |
| OSHA Safety | 6 | |
| HVAC Controls | 5 | |
| Electrical Concepts | 2 | |
| Piping | 14 | |
| Load Calculations | 5 | |
| HVAC Equipment | 10 | |
| Refrigerants and Oils | 10 | |
| Air Distribution and Venting | 23 | |
| Fire and Smoke Protection | 2 |
Exam day details
- Administered by Prov for the Tennessee Board for Licensing Contractors.
- Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
- 100 questions in 5 hours; 73% to pass.
- Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
- Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
- You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
- Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
- Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.
Frequently asked questions
What's on the Tennessee CMC-C exam?
100 questions: air distribution and venting 23, piping 14, fuel gas systems 10, HVAC equipment 10, refrigerants and oils 10, general knowledge 9, OSHA safety 6, and smaller sections.
Which code is used?
The 2021 IMC, which Tennessee adopts without amendments.
Do I need EPA 608 too?
Federal law requires EPA 608 certification to handle refrigerants; it is separate from this exam.
Free questions with answers
Show all 10 free questions and answers
A designer proposes taking return air for a forced-air system from several spaces in a house. Which space is prohibited as a return air source by Section 601.5?
Answer: A bathroom adjoining the master bedroom
Section 601.5 forbids taking return air from a closet, bathroom, toilet room, kitchen, garage, boiler room, furnace room or unconditioned attic (with listed exceptions). Living rooms and hallways are acceptable sources, and transfer openings are allowed when sized per the manufacturer or ACCA Manual D.
Reference: 2021 International Mechanical Code, 601.5
Used refrigerant must be placed in a different owner's equipment. What purity standard must it meet before reuse?
Answer: AHRI 700, through testing or reclaiming
Section 1102.2.2.3 says used refrigerants shall not be reused in a different owner's equipment unless tested and found to meet AHRI 700 purity; contaminated refrigerant must be reclaimed to AHRI 700 before use.
Reference: 2021 International Mechanical Code, 1102.2.2.3
Exposed refrigerant piping in an open space that allows passage must be installed at least how high above the finished floor?
Answer: 7 feet 3 inches
Section 1109.2.1 requires exposed refrigerant piping in open spaces that afford passage to be not less than 7 feet 3 inches above the finished floor.
Reference: 2021 International Mechanical Code, 1109.2.1
A buried gas line serves a house, and a separate line feeds a patio grill. What minimum burial depths apply under the IFGC, assuming the grill line is approved and not subject to damage?
Answer: 12 inches for the house line and 8 inches for the grill line
IFGC 404.12 requires underground piping to be at least 12 inches below grade; 404.12.1 allows individual outdoor appliance lines (lights, grills) at 8 inches where approved and not subject to physical damage.
Reference: 2021 International Fuel Gas Code, 404.12, 404.12.1
A boiler relief valve discharge pipe is being run to the floor. Which installation is permitted by Section 1006.6?
Answer: A rigid line, not trapped, ending 6 inches or less above the floor
Section 1006.6 requires discharge piping to be rigid, not trapped, flow by gravity, serve a single relief device, and end no more than 6 inches above the floor or waste receptor with no threaded end, valves or tees. It discharges through an air break in the same room and is not directly connected to the drainage system.
Reference: 2021 International Mechanical Code, 1006.6
A package unit is set at grade on a pad. What clearance above adjoining grade does Section 304.10 require for a slab, or for a suspended unit?
Answer: Slab 3 inches above grade, or suspended 6 inches above grade
Section 304.10: appliances at grade level are supported on a level concrete slab or other approved material extending at least 3 inches above adjoining grade, or suspended at least 6 inches above adjoining grade, per the manufacturer's instructions.
Reference: 2021 International Mechanical Code, 304.10
A crew will dig a trench in clay soil (not stable rock) to run a gas line. At what depth does 29 CFR 1926.652(a)(1) require a cave-in protective system even if a competent person sees no sign of a potential cave-in?
Answer: 5 feet or more
29 CFR 1926.652(a)(1) requires employees in excavations to be protected by a protective system (sloping, shoring or shielding), except in stable rock or where the excavation is less than 5 feet deep and a competent person finds no indication of a potential cave-in. So at 5 feet or more a protective system is required. Four feet is the depth at which trenches need a means of egress (1926.651(c)(2)), and 20 feet is the depth beyond which sloping or shoring must be designed by a registered professional engineer.
Reference: 29 CFR 1926, 1926.652(a)(1)
For a boiler's electrical control circuit, which requirement comes from Section 1006.8?
Answer: Control voltage may not exceed 150 volts nominal, line to line
Section 1006.8 requires a two-wire branch circuit with a grounded conductor (or an isolation transformer with a grounded two-wire secondary), control voltage not over 150 volts nominal line to line, and control and limit devices that interrupt the ungrounded side. A manual disconnect for the control circuit must also be provided.
Reference: 2021 International Mechanical Code, 1006.8
A duct system delivers 1,200 cfm with a 20°F temperature difference across the coil. Using Q = 1.08 x cfm x TD, what is the sensible capacity?
Answer: 25,920 Btu/h
Q = 1.08 x 1,200 x 20 = 1.08 x 24,000 = 25,920 Btu/h. 24,000 drops the 1.08 factor, 21,600 uses 0.9, and 28,800 uses 1.2.
Reference: HVAC Basics for Contractors, 4th Edition, Load calculations: sensible heat formula for air
A furnace fails on a holiday weekend, and the contractor replaces it as an emergency. When must the permit application be submitted under the Section 106.1 exception?
Answer: Within the next working business day
Section 106.1 exempts emergency equipment replacements and repairs from the prior-permit rule, but the permit application must be submitted within the next working business day of the department.
Reference: 2021 International Mechanical Code, 106.1
Sources
- Prov: Tennessee Contractor Candidate Information Bulletin (TNCONT_CIB 2026.08.18) (opens in a new tab)
- Tennessee Board for Licensing Contractors: how to get a contractor license (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.