South Dakota licensing exam

South Dakota Journeyman Electrician Exam: Practice Test & Licensing Guide

The ICC 531_SD exam for a South Dakota journeyman electrician license: 80 multiple-choice questions on the 2023 NEC in 4 hours. Open book.

Questions
80
Time limit
4 hours
Passing score
Not published by South Dakota

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge

A 120-volt circuit supplies a fixed resistive load that draws 8 amperes. What is the resistance of the load?

Requirements at a glance

AgencySouth Dakota Electrical Commission (Department of Labor and Regulation); exams by ICC at Pearson VUE
Experience4 years or 8,000 hours as a licensed apprentice
Exam80 questions, 4 hours, open book (ICC 531_SD)
Books allowed2023 NEC (or NEC Handbook), Ugly's Electrical References, Ferm's Fast Finder Index, Tom Henry's Key Word Index
Fees$60 application to the Commission, $115 to Pearson VUE, plus the license fee ($80 journeyman, biennial)

Electricians applying to the South Dakota Electrical Commission for a journeyman license after 4 years or 8,000 hours as a licensed apprentice. Only licensed hours count.

How to get licensed, step by step

  1. Apply to the Commission

    Send the Electrical Commission your license application, the $60 fee and a copy of your photo ID. Only licensed apprentice or journeyman hours count toward experience.

    South Dakota Electrical Commission (opens in a new tab)

  2. Schedule with Pearson VUE

    After approval you have 90 days to test. Wait 24 to 48 hours, then register and pay $115 at Pearson VUE.

    Pearson VUE: ICC exam registration (opens in a new tab)ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  3. Pass the exam

    The exam is open book. Reported retest waits are 30 days after a failure and 90 days after a second failure.

    ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  4. Get licensed and renew

    Licenses renew every two years and expire June 30 of even years. Each renewal needs 16 hours of continuing education, 8 of them on the code.

    South Dakota Electrical Commission (opens in a new tab)

How to prepare

  • South Dakota exams are on the 2023 NEC (state exam page: all tests from December 2, 2024). ICC also allows Ugly's (any edition), the NEC Handbook, Ferm's Fast Finder Index and Tom Henry's Key Word Index.
  • ICC's August 2025 bulletin prints the outline: wiring methods and materials is the biggest area, followed by branch circuits and conductors and services. Tab Articles 100, 110, 210, 220, 230, 250, 310, 314, 334 and 430 and the Chapter 9 tables.
  • The bulletin does not print the pass mark. Aim well above 70% in practice and confirm the mark with ICC or the Commission.
  • Wiring methods and materials (21 of 80) and branch circuits and conductors (15) are over 45% of the exam: drill raceway fill, box fill, conductor ampacity and overcurrent protection.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), 2023 EditionEssential

    Open book, tabs allowed. All South Dakota exams use the 2023 NEC. The NEC Handbook (hardcover) is also allowed as your NEC.

    NFPA store (opens in a new tab)Free online access (opens in a new tab)

  • Ugly's Electrical References (any edition)

    Allowed by ICC. Formulas for voltage drop, power, motors and load calculations.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2023 Edition (allowed in the exam room; all South Dakota exams use the 2023 NEC from December 2, 2024)
  • Ugly's Electrical References (any edition)
  • NEC Handbook (hardcover; may serve as your NEC)
  • Optional: Ferm's Fast Finder Index (IAEI) or Tom Henry's Key Word Index

What's on the exam

Official content outline from the International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):

TopicQuestions
General Knowledge5
Services and Service Equipment9
Feeders3
Branch Circuits and Conductors15
Wiring Methods and Materials21
Equipment and Devices10
Control Devices3
Motors and Generators5
Special Occupancies, Equipment and Conditions9

Exam day details

  • Administered by the International Code Council (ICC), delivered by Pearson VUE, for the South Dakota Electrical Commission.
  • Fee: $115 to Pearson VUE per exam. The Commission's $60 application fee and license fees are separate.
  • 80 multiple-choice questions in 4 hours (ICC exam 531_SD). Wiring methods and materials is the largest area at 21 questions.
  • Apply to the Electrical Commission first with the $60 application fee and a copy of your photo ID. After approval you have 90 days to test, or you must reapply and pay again.
  • ICC suggests waiting 24 to 48 hours after approval before you schedule with Pearson VUE.
  • All questions are multiple choice. Reported retest waits are 30 days after a failure and 90 days after a second failure.

Note: ICC's August 2025 bulletin gives the question count, time, fee and topic outline but does not print the pass mark; the 70% shown is our practice target. Confirm the pass mark with ICC or the Commission, and check ICC's exam catalog for outline changes.

Frequently asked questions

What's on the South Dakota journeyman electrician exam?

ICC's August 2025 outline, 80 questions: wiring methods and materials 21; branch circuits and conductors 15; equipment and devices 10; services and service equipment 9; special occupancies, equipment and conditions 9; general knowledge 5; motors and generators 5; feeders 3; control devices 3.

Which NEC edition does South Dakota use?

The 2023 NEC. The state's exam page says all tests are on the 2023 NEC starting December 2, 2024.

How do I schedule the exam?

Apply to the Electrical Commission first ($60 and a copy of your ID). After approval you have 90 days to register with Pearson VUE and pay $115.

Free questions with answers

Show all 10 free questions and answers
  1. A 120-volt circuit supplies a fixed resistive load that draws 8 amperes. What is the resistance of the load?

    Answer: 15 ohms

    Ohm's law gives R = E / I = 120 / 8 = 15 ohms. Multiplying the two values (960) is the most common slip, and 0.07 ohm comes from dividing amps by volts. Use the E/I/R triangle with the unknown covered.

    Reference: NFPA 70, National Electrical Code (2023), General electrical theory: Ohm's law

  2. Using the optional dwelling method, a 2,000 sq ft one-family dwelling has: general lighting and receptacles at 3 VA per sq ft, two 1,500 VA small-appliance circuits, a 1,500 VA laundry circuit, a 1,200 VA dishwasher, a 4,500 VA water heater, a 12,000 VA range, a 5,000 VA dryer and a 4,800 VA air conditioner (larger than the heating load). The service is 120/240 V single-phase. What is the calculated service current?

    Answer: 100.3 amperes

    Non-HVAC loads: 6,000 + 3,000 + 1,500 + 1,200 + 4,500 + 12,000 + 5,000 = 33,200 VA. First 10,000 VA at 100% plus the remainder at 40%: 10,000 + (23,200 x 0.40 = 9,280) = 19,280 VA. Add the 4,800 VA air conditioner at 100%: 24,080 VA / 240 V = 100.3 A. Skipping the 40% gives 158.3 A, omitting the A/C gives 80.3 A.

    Reference: NFPA 70, National Electrical Code (2023), 220.82(B) and (C)

  3. A feeder supplies 80 amperes of continuous load and 40 amperes of noncontinuous load. What is the minimum feeder conductor ampacity before any adjustment or correction factors, where the overcurrent device is not listed for 100% continuous operation?

    Answer: 140 amperes

    Section 215.2(A)(1) requires the noncontinuous load at 100% plus the continuous load at 125%: 40 + (80 x 1.25 = 100) = 140 A. Adding the loads straight gives 120 A, and applying 125% to the whole 120 A gives 150 A; only the continuous portion gets the 125%. 125 A is a standard breaker size, not the calculated ampacity.

    Reference: NFPA 70, National Electrical Code (2023), 215.2(A)(1)

  4. A branch circuit supplies a continuous load of 24 amperes and nothing else. What is the minimum overcurrent device rating by calculation, where the device is not listed for 100% continuous duty?

    Answer: 30 amperes

    Section 210.20(A) requires the overcurrent device to carry the noncontinuous load plus 125% of the continuous load: 24 x 1.25 = 30 A, and 30 A is a standard size. 24 A applies no continuous factor, and 20 A is less than the load.

    Reference: NFPA 70, National Electrical Code (2023), 210.20(A)

  5. Which receptacle ratings are permitted on a 20-ampere branch circuit that supplies two or more receptacle outlets?

    Answer: 15 or 20 amperes

    Table 210.21(B)(3) allows 15- or 20-ampere receptacles on a 20-ampere circuit with more than one outlet. A 30-ampere receptacle would only be permitted on a 30-ampere circuit, and a 15-ampere circuit may not use 20-ampere receptacles.

    Reference: NFPA 70, National Electrical Code (2023), 210.21(B)(3), Table 210.21(B)(3)

  6. Type MC cable containing four 12 AWG conductors is run on a wall. What are the maximum securing intervals?

    Answer: Every 6 feet, within 12 inches of each box

    Section 330.30(B) requires MC cable to be secured at intervals not exceeding 6 ft, and cables with four or fewer conductors no larger than 10 AWG within 12 in. of every box, cabinet or fitting. The 4 1/2 ft interval is for NM cable and flexible metal conduit.

    Reference: NFPA 70, National Electrical Code (2023), 330.30(B)

  7. A 480-volt panelboard has exposed live parts on one side of the working space and grounded concrete wall on the other (Condition 2). What is the minimum working space depth in front of the equipment?

    Answer: 3 feet 6 inches

    Table 110.26(A)(1) for 151 to 600 volts to ground shows 3 ft for Condition 1, 3 ft 6 in. for Condition 2 and 4 ft for Condition 3. Condition 2 is live parts on one side and grounded parts on the other, so 3 ft 6 in. applies.

    Reference: NFPA 70, National Electrical Code (2023), 110.26(A)(1), Table 110.26(A)(1)

  8. Section 404.2(B) generally prohibits a switch or circuit breaker from disconnecting the grounded conductor. Under its exception, when is this permitted?

    Answer: Where all circuit conductors open together, or the grounded conductor cannot open before the ungrounded ones

    The exception to 404.2(B) permits disconnecting the grounded conductor only where all circuit conductors are disconnected simultaneously, or where the device is arranged so the grounded conductor cannot be disconnected until all ungrounded conductors have been. Listing, re-identification with tape, or the type of load do not create an exception; an ordinary switch still opens only the ungrounded conductor.

    Reference: NFPA 70, National Electrical Code (2023), 404.2(B)

  9. A 5 hp, 230-volt, single-phase motor is on a branch circuit. What is the minimum ampacity of the branch-circuit conductors supplying this single continuous-duty motor?

    Answer: 35 amperes

    Table 430.248 gives 28 A for a 5 hp, 230 V single-phase motor. Section 430.22 requires conductors rated at least 125 percent of the full-load current: 28 x 1.25 = 35 A. Using 28 A skips the factor, and 40 A is the 7 1/2 hp table value.

    Reference: NFPA 70, National Electrical Code (2023), 430.22; Table 430.248

  10. A building has a legally required standby system (Article 701) that serves ventilation and communication loads required by the authority. After the normal supply fails, what is the maximum time allowed for that system to supply its loads?

    Answer: 60 seconds

    Section 701.12 requires legally required standby power to be available within the time required for the application, not to exceed 60 seconds. The 10 second limit belongs to emergency systems in Article 700.

    Reference: NFPA 70, National Electrical Code (2023), 701.12

Sources

Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.