South Dakota licensing exam

South Dakota Electrical Contractor Exam: Practice Test & Licensing Guide

The ICC 530_SD exam for a South Dakota electrical contractor license: 100 multiple-choice questions on the 2023 NEC in 5 hours. Open book.

Questions
100
Time limit
5 hours
Passing score
Not published by South Dakota

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Services and Service Equipment

Overhead service conductors pass over a flat roof that is not subject to vehicular traffic. What is the minimum vertical clearance above the roof surface, in general?

Requirements at a glance

AgencySouth Dakota Electrical Commission (Department of Labor and Regulation); exams by ICC at Pearson VUE
Experience2 more years or 4,000 hours as a licensed journeyman, including 2,000 hours of commercial work
Exam100 questions, 5 hours, open book (ICC 530_SD)
Books allowed2023 NEC (or NEC Handbook), Ugly's Electrical References, Ferm's Fast Finder Index, Tom Henry's Key Word Index
Fees$60 application to the Commission, $115 to Pearson VUE, plus the license fee ($200 contractor, biennial)

Licensed journeymen applying to the South Dakota Electrical Commission for an electrical contractor license after 2 more years or 4,000 hours as a licensed journeyman, including 2,000 hours of commercial work.

How to get licensed, step by step

  1. Apply to the Commission

    Send the Electrical Commission your license application, the $60 fee and a copy of your photo ID. Only licensed apprentice or journeyman hours count toward experience.

    South Dakota Electrical Commission (opens in a new tab)

  2. Schedule with Pearson VUE

    After approval you have 90 days to test. Wait 24 to 48 hours, then register and pay $115 at Pearson VUE.

    Pearson VUE: ICC exam registration (opens in a new tab)ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  3. Pass the exam

    The exam is open book. Reported retest waits are 30 days after a failure and 90 days after a second failure.

    ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  4. Get licensed and renew

    Licenses renew every two years and expire June 30 of even years. Each renewal needs 16 hours of continuing education, 8 of them on the code.

    South Dakota Electrical Commission (opens in a new tab)

How to prepare

  • South Dakota exams are on the 2023 NEC (state exam page: all tests from December 2, 2024). ICC also allows Ugly's (any edition), the NEC Handbook, Ferm's Fast Finder Index and Tom Henry's Key Word Index.
  • ICC's August 2025 bulletin prints the outline: wiring methods and materials is the biggest area, followed by branch circuits and conductors and services. Tab Articles 100, 110, 210, 220, 230, 250, 310, 314, 334 and 430 and the Chapter 9 tables.
  • The bulletin does not print the pass mark. Aim well above 70% in practice and confirm the mark with ICC or the Commission.
  • The contractor outline weights general knowledge and plan reading (12), services (16) and special occupancies (12) more than the journeyman exam. Practice service and feeder load calculations.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), 2023 EditionEssential

    Open book, tabs allowed. All South Dakota exams use the 2023 NEC. The NEC Handbook (hardcover) is also allowed as your NEC.

    NFPA store (opens in a new tab)Free online access (opens in a new tab)

  • Ugly's Electrical References (any edition)

    Allowed by ICC. Formulas for voltage drop, power, motors and load calculations.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2023 Edition (allowed in the exam room; all South Dakota exams use the 2023 NEC from December 2, 2024)
  • Ugly's Electrical References (any edition)
  • NEC Handbook (hardcover; may serve as your NEC)
  • Optional: Ferm's Fast Finder Index (IAEI) or Tom Henry's Key Word Index

What's on the exam

Official content outline from the International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):

TopicQuestions
General Knowledge and Plan Reading12
Services and Service Equipment16
Feeders4
Branch Circuits and Conductors16
Wiring Methods and Materials19
Equipment and Devices10
Control Devices3
Motors and Generators8
Special Occupancies, Equipment and Conditions12

Exam day details

  • Administered by the International Code Council (ICC), delivered by Pearson VUE, for the South Dakota Electrical Commission.
  • Fee: $115 to Pearson VUE per exam. The Commission's $60 application fee and license fees are separate.
  • 100 multiple-choice questions in 5 hours (ICC exam 530_SD). Wiring methods and materials is the largest area at 19 questions.
  • Apply to the Electrical Commission first with the $60 application fee and a copy of your photo ID. After approval you have 90 days to test, or you must reapply and pay again.
  • ICC suggests waiting 24 to 48 hours after approval before you schedule with Pearson VUE.
  • All questions are multiple choice. Reported retest waits are 30 days after a failure and 90 days after a second failure.

Note: ICC's August 2025 bulletin gives the question count, time, fee and topic outline but does not print the pass mark; the 70% shown is our practice target. Confirm the pass mark with ICC or the Commission, and check ICC's exam catalog for outline changes.

Frequently asked questions

What's on the South Dakota electrical contractor exam?

ICC's August 2025 outline, 100 questions: wiring methods and materials 19; services and service equipment 16; branch circuits and conductors 16; general knowledge and plan reading 12; special occupancies, equipment and conditions 12; equipment and devices 10; motors and generators 8; feeders 4; control devices 3.

Who can take it?

Licensed journeymen with 4,000 more hours (2 years) as a licensed journeyman, including 2,000 hours of commercial work. Only licensed hours count.

Which books are allowed?

The 2023 NEC (or the NEC Handbook), Ugly's Electrical References (any edition), Ferm's Fast Finder Index and Tom Henry's Key Word Index.

Free questions with answers

Show all 10 free questions and answers
  1. Overhead service conductors pass over a flat roof that is not subject to vehicular traffic. What is the minimum vertical clearance above the roof surface, in general?

    Answer: 8 feet 6 inches

    Section 230.24(A) requires 8 ft 6 in. of vertical clearance above the roof surface, maintained 3 ft in all directions from the roof edge. Ten and twelve feet are the grade clearances for sidewalks and driveways in 230.24(B). Eight feet is not a code value for roofs.

    Reference: NFPA 70, National Electrical Code, 2023, 230.24(A)

  2. What is the lowest permitted height above finished grade for the point where overhead service conductors attach to a building?

    Answer: 10 feet

    Section 230.26 says the point of attachment may never be less than 10 ft above finished grade, and it must also satisfy the clearances in 230.9 and 230.24. The larger 12 ft figure applies to the span over residential driveways, not to the attachment point itself.

    Reference: NFPA 70, National Electrical Code, 2023, 230.26

  3. A feeder supplies 120 amperes of noncontinuous load and 60 amperes of continuous load. The feeder overcurrent device and its assembly are listed for operation at 100 percent of rating. What is the minimum feeder conductor ampacity before adjustment or correction factors?

    Answer: 180 amperes

    Exception No. 1 to 215.2(A)(1) allows a feeder supplied by an assembly listed for 100 percent operation to be sized at the sum of the continuous and noncontinuous load: 120 + 60 = 180 A. The standard rule would give 120 + (60 x 1.25) = 195 A. A value of 225 A applies 125 percent to everything (180 x 1.25), and 150 A wrongly applies the 125 percent factor to the noncontinuous load alone (120 x 1.25) and drops the continuous load.

    Reference: NFPA 70, National Electrical Code, 2023, 215.2(A)(1), Exception No. 1

  4. A 120-volt branch circuit supplies a continuous load of 24 amperes and a noncontinuous load of 6 amperes. The overcurrent device is not listed for 100 percent operation and all terminations are rated 75 degrees C. What is the smallest copper conductor that can be used, using Table 310.16?

    Answer: 8 AWG

    Section 210.19(A)(1) requires ampacity of at least the noncontinuous load plus 125 percent of the continuous load: 6 + (24 x 1.25) = 6 + 30 = 36 A. In the 75 degree C column of Table 310.16, 10 AWG is 35 A (too small by 1 A) and 8 AWG is 50 A. Ten AWG results from adding 24 + 6 = 30 A without the 125 percent factor. Six AWG oversizes the conductor.

    Reference: NFPA 70, National Electrical Code, 2023, 210.19(A)(1); Table 310.16

  5. Type MC cable with three 12 AWG conductors and a ground is run exposed along a ceiling to a junction box. Which securing rule applies?

    Answer: Secured within 12 inches of the box and at intervals not over 6 feet

    Section 330.30(B) requires MC cable to be secured at intervals not exceeding 6 ft, and cables with four or fewer conductors no larger than 10 AWG to be secured within 12 in. of every box or other termination. Four and a half feet is the NM cable interval in 334.30 and the 3 ft / 10 ft pair is the EMT rule in 358.30.

    Reference: NFPA 70, National Electrical Code, 2023, 330.30(B)

  6. A motor nameplate lists 31 amperes, while Table 430.250 gives 34 amperes for the same horsepower and voltage. Which current is used to size the branch-circuit conductors and short-circuit protection, and which for the overload relay?

    Answer: Table value for conductors and short-circuit protection, nameplate current for the overload device

    Section 430.6(A)(1) directs that table full-load current values be used to size conductors, disconnects, controllers and branch-circuit short-circuit and ground-fault protection, while 430.6(A)(2) requires the nameplate current for overload protection. Using the table for the overload relay would leave a motor with a lower nameplate current under-protected.

    Reference: NFPA 70, National Electrical Code, 2023, 430.6(A)

  7. What is the minimum width of the working space in front of a panelboard under Section 110.26(A)(2)?

    Answer: The width of the equipment or 30 inches, whichever is greater

    Section 110.26(A)(2) requires the working space to be at least as wide as the equipment or 30 in., whichever is greater. The space may be centered on the equipment or not, and it does not need to be rectangular. The other widths are not code values.

    Reference: NFPA 70, National Electrical Code, 2023, 110.26(A)(2)

  8. Three-way and four-way switches are installed to control a corridor luminaire. In which conductor must all of the switching be done, according to Section 404.2(A)?

    Answer: The ungrounded circuit conductor only

    Section 404.2(A) requires three-way and four-way switches to be wired so that all switching is done only in the ungrounded circuit conductor. Section 404.2(B) generally prohibits a switch from disconnecting the grounded conductor unless all circuit conductors are opened simultaneously.

    Reference: NFPA 70, National Electrical Code, 2023, 404.2(A)

  9. A permanently installed swimming pool is being wired. Under Section 680.22(A)(1), where must the required general-purpose receptacle be located relative to the inside wall of the pool?

    Answer: At least 6 feet but not more than 20 feet from the pool wall, and not over 6 feet 6 inches above the pool deck level

    Section 680.22(A)(1) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit located at least 6 ft and not more than 20 ft from the inside wall of the pool, and not more than 6 ft 6 in. above the floor, platform or grade serving the pool.

    Reference: NFPA 70, National Electrical Code, 2023, 680.22(A)(1)

  10. A 40,000-square-foot warehouse has a general lighting load of 1.2 VA per square foot from Table 220.42(A). Using the demand factors of Table 220.45 for warehouses, what is the demand load for lighting?

    Answer: 30,250 volt-amperes

    Lighting load = 40,000 x 1.2 = 48,000 VA. Table 220.45 for warehouses gives 100 percent of the first 12,500 VA and 50 percent of the remainder: 12,500 + ((48,000 - 12,500) x 0.50) = 12,500 + 17,750 = 30,250 VA. Using no demand gives 48,000, 50 percent of everything gives 24,000, and 32,500 applies 50 percent to 40,000 instead of 35,500.

    Reference: NFPA 70, National Electrical Code, 2023, Table 220.45

Sources

Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.