South Dakota licensing exam

South Dakota Class B Electrician Exam: Practice Test & Licensing Guide

The ICC 533_SD exam for a South Dakota Class B electrician license: 60 multiple-choice questions on the 2023 NEC in 3 hours. Open book.

Questions
60
Time limit
3 hours
Passing score
Not published by South Dakota

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge and Plan Reading

Three resistive loads are connected in parallel across the same source: 12 ohms, 12 ohms and 6 ohms. What is the total resistance of the combination?

Requirements at a glance

AgencySouth Dakota Electrical Commission (Department of Labor and Regulation); exams by ICC at Pearson VUE
ExperienceClass B (residential and farmstead) experience set by the Commission
Exam60 questions, 3 hours, open book (ICC 533_SD)
Books allowed2023 NEC (or NEC Handbook), Ugly's Electrical References, Ferm's Fast Finder Index, Tom Henry's Key Word Index
Fees$60 application to the Commission, $115 to Pearson VUE, plus the license fee (Class B license fee set by the Commission)

Electricians applying to the South Dakota Electrical Commission for a Class B license, which covers residential and farmstead work. The license is currently issued; confirm availability and the experience requirement with the Commission.

How to get licensed, step by step

  1. Apply to the Commission

    Send the Electrical Commission your license application, the $60 fee and a copy of your photo ID. Only licensed apprentice or journeyman hours count toward experience.

    South Dakota Electrical Commission (opens in a new tab)

  2. Schedule with Pearson VUE

    After approval you have 90 days to test. Wait 24 to 48 hours, then register and pay $115 at Pearson VUE.

    Pearson VUE: ICC exam registration (opens in a new tab)ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  3. Pass the exam

    The exam is open book. Reported retest waits are 30 days after a failure and 90 days after a second failure.

    ICC: South Dakota Contractor/Trades Bulletin (PDF) (opens in a new tab)

  4. Get licensed and renew

    Licenses renew every two years and expire June 30 of even years. Each renewal needs 16 hours of continuing education, 8 of them on the code.

    South Dakota Electrical Commission (opens in a new tab)

How to prepare

  • South Dakota exams are on the 2023 NEC (state exam page: all tests from December 2, 2024). ICC also allows Ugly's (any edition), the NEC Handbook, Ferm's Fast Finder Index and Tom Henry's Key Word Index.
  • ICC's August 2025 bulletin prints the outline: wiring methods and materials is the biggest area, followed by branch circuits and conductors and services. Tab Articles 100, 110, 210, 220, 230, 250, 310, 314, 334 and 430 and the Chapter 9 tables.
  • The bulletin does not print the pass mark. Aim well above 70% in practice and confirm the mark with ICC or the Commission.
  • Branch circuits and conductors (15 of 60) and services and service equipment (13) are nearly half the exam: drill service and branch circuit load calculations, GFCI and AFCI protection, and grounding and bonding.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), 2023 EditionEssential

    Open book, tabs allowed. All South Dakota exams use the 2023 NEC. The NEC Handbook (hardcover) is also allowed as your NEC.

    NFPA store (opens in a new tab)Free online access (opens in a new tab)

  • Ugly's Electrical References (any edition)

    Allowed by ICC. Formulas for voltage drop, power, motors and load calculations.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2023 Edition (allowed in the exam room; all South Dakota exams use the 2023 NEC from December 2, 2024)
  • Ugly's Electrical References (any edition)
  • NEC Handbook (hardcover; may serve as your NEC)
  • Optional: Ferm's Fast Finder Index (IAEI) or Tom Henry's Key Word Index

What's on the exam

Official content outline from the International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):

TopicQuestions
General Knowledge and Plan Reading7
Services and Service Equipment13
Feeders8
Branch Circuits and Conductors15
Wiring Methods and Materials8
Equipment and Devices5
Special Occupancies, Equipment and Conditions4

Exam day details

  • Administered by the International Code Council (ICC), delivered by Pearson VUE, for the South Dakota Electrical Commission.
  • Fee: $115 to Pearson VUE per exam. The Commission's $60 application fee and license fees are separate.
  • 60 multiple-choice questions in 3 hours (ICC exam 533_SD). Branch circuits and conductors is the largest area at 15 questions, then services and service equipment at 13.
  • Apply to the Electrical Commission first with the $60 application fee and a copy of your photo ID. After approval you have 90 days to test, or you must reapply and pay again.
  • ICC suggests waiting 24 to 48 hours after approval before you schedule with Pearson VUE.
  • All questions are multiple choice. Reported retest waits are 30 days after a failure and 90 days after a second failure.

Note: ICC's August 2025 bulletin gives the question count, time, fee and topic outline but does not print the pass mark; the 70% shown is our practice target. Confirm the pass mark with ICC or the Commission, and check ICC's exam catalog for outline changes.

Frequently asked questions

What's on the South Dakota Class B electrician exam?

ICC's August 2025 outline, 60 questions: branch circuits and conductors 15; services and service equipment 13; feeders 8; wiring methods and materials 8; general knowledge and plan reading 7; equipment and devices 5; special occupancies, equipment and conditions 4.

Which NEC edition does South Dakota use?

The 2023 NEC. The state's exam page says all tests are on the 2023 NEC starting December 2, 2024.

Is the Class B license still issued?

ICC still lists the Class B exam and the Commission issues the license. A 2026 bill to end new Class B licenses was reported to have failed, but we could not confirm that, so check with the Electrical Commission.

Free questions with answers

Show all 10 free questions and answers
  1. Three resistive loads are connected in parallel across the same source: 12 ohms, 12 ohms and 6 ohms. What is the total resistance of the combination?

    Answer: 3 ohms

    For parallel resistors, 1/R = 1/12 + 1/12 + 1/6 = 4/12, so R = 3 ohms. Adding the values (30) is the series result, and the total of a parallel group is always less than the smallest branch.

    Reference: Ugly's Electrical References, Parallel resistance: 1/Rt = 1/R1 + 1/R2 + 1/R3

  2. What is the minimum rating of the service disconnecting means for a one-family dwelling?

    Answer: 100 amperes, 3-wire

    Section 230.79(C) sets 100 A, 3-wire as the floor for a one-family dwelling service disconnect, no matter how small the calculated load is. The 60 A minimum in 230.79(D) applies only to other kinds of installations.

    Reference: NFPA 70, National Electrical Code (2023), 230.79(C)

  3. A dwelling has one household electric range rated 15 kW. Using Table 220.55, Column C and Note 1, what is the maximum demand to use for the range?

    Answer: 9.2 kW

    Column C gives 8 kW for one range. Note 1 adds 5 percent for each kilowatt by which the rating exceeds 12 kW: 15 - 12 = 3 kW, so 3 x 5 = 15 percent, and 8 x 1.15 = 9.2 kW. Adding only 5 percent gives 8.4 kW, and ignoring the note gives 8 kW.

    Reference: NFPA 70, National Electrical Code (2023), Table 220.55, Column C and Note 1

  4. A feeder to a shop panel carries 100 amperes of continuous load and 60 amperes of noncontinuous load. Before any adjustment or correction factors, what is the minimum feeder conductor ampacity under 215.2?

    Answer: 185 amperes

    Section 215.2(A)(1) requires an ampacity of at least the noncontinuous load plus 125 percent of the continuous load: 60 + (100 x 1.25) = 185 A. Adding the loads (160 A) ignores the continuous-load rule, and applying 125 percent to everything gives 200 A rather than 185 A.

    Reference: NFPA 70, National Electrical Code (2023), 215.2(A)(1)

  5. A feeder supplies 150 amperes of continuous load and 100 amperes of noncontinuous load, and the overcurrent device is not listed for 100 percent operation. What is the smallest standard overcurrent device rating that satisfies 215.3?

    Answer: 300 amperes

    Section 215.3 requires a rating not less than the noncontinuous load plus 125 percent of the continuous load: 100 + (150 x 1.25) = 287.5 A. The next standard size at or above 287.5 A in 240.6(A) is 300 A. A 250 A device is below the calculated 287.5 A.

    Reference: NFPA 70, National Electrical Code (2023), 215.3 and 240.6(A)

  6. A homeowner wants the new laundry-room receptacle circuit to also supply the basement lighting. Does the NEC allow this on the required laundry branch circuit?

    Answer: No, the required 20-ampere laundry circuit may not have any other outlets

    Section 210.11(C)(2) requires at least one additional 20-ampere branch circuit for the laundry receptacle outlets required by 210.52(F), and says the circuit shall have no other outlets. Lighting outlets are outlets, so they cannot be added to it.

    Reference: NFPA 70, National Electrical Code (2023), 210.11(C)(2)

  7. May Type NM cable be used as service-entrance cable for a house?

    Answer: No, 334.12 prohibits NM and NMC from being used as service-entrance cable

    Section 334.12(A)(3) says Types NM and NMC cables shall not be used as service-entrance cable. Type SE (or USE for underground) is the cable made for that job, and Type SE may be used for feeders inside the house as well.

    Reference: NFPA 70, National Electrical Code (2023), 334.12(A)(3)

  8. Underground service conductors are buried 24 inches deep in a trench and are not encased in concrete. What does 300.5(D)(3) require?

    Answer: A warning ribbon in the trench at least 12 inches above the conductors

    Section 300.5(D)(3) requires underground service conductors that are not encased in concrete and are buried 18 in. or more below grade to be identified by a warning ribbon placed in the trench at least 12 in. above the installation. It applies to service conductors only.

    Reference: NFPA 70, National Electrical Code (2023), 300.5(D)(3)

  9. What is the maximum height of the operating handle of a circuit breaker in a residential panelboard, measured to the center of the grip in its highest position?

    Answer: 6 feet 7 inches

    Section 240.24(A) requires the center of the grip of the operating handle, when in its highest position, to be not more than 2.0 m (6 ft 7 in.) above the floor or working platform. Both a breaker and a fused switch are covered.

    Reference: NFPA 70, National Electrical Code (2023), 240.24(A)

  10. A permanently installed swimming pool is built at a dwelling. Where must the required general-purpose 125-volt receptacle be located relative to the inside wall of the pool?

    Answer: At least 6 feet but not more than 20 feet from the inside wall

    Section 680.22(A)(1) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit not less than 1.83 m (6 ft) and not more than 6.0 m (20 ft) from the inside wall of the pool, and not more than 2.0 m (6 ft 6 in.) above the floor, platform or grade. All other receptacles must also be at least 6 ft away.

    Reference: NFPA 70, National Electrical Code (2023), 680.22(A)(1) and (A)(3)

Sources

Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.