Requirements at a glance
| Agency | South Carolina Department of Labor, Licensing and Regulation (LLR), Contractor's Licensing Board; exams by PSI |
|---|---|
| Experience | The primary qualifying party needs 2 of the last 5 years of full-time experience in the classification, in a management role (S.C. Code 40-11-230) |
| Exams | Limited Building Contractor: 80 questions, 5 hours, 70%, plus Business Management and Law (Commercial); 70% on each |
| Books allowed | IBC 2021 or 2024 (SC), 29 CFR 1926 and the construction texts on PSI's list |
| Fees | PSI exam fees ($64 to $78 per exam), plus the Board's application and license fees and a financial statement or bond |
Applicants for a South Carolina commercial general contractor license in the Limited Building classification (Groups 1 to 3, buildings up to three stories).
Official links
How to get licensed, step by step
Check the work needs a license
South Carolina requires a Contractor's Licensing Board license for commercial work above $10,000 in job cost (S.C. Code 40-11-30). Commercial licenses also cover residential work.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
Apply to the Board
Apply to the Contractor's Licensing Board for an eligibility letter before you register with PSI.
Schedule Business and Law and the Limited Building Contractor exam with PSI
Register for each exam separately. You may take each trade exam twice in 12 months, then once every six months. Commercial Business and Law has no such limit.
Schedule with PSI (commercial contractors) (opens in a new tab)
Apply for the license
After you pass, the business entity applies with its primary qualifying party, a financial statement or bond, and the license fee. The group (1 to 5) sets the dollar limit of work you may bid.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
How to prepare
- Code editions are changing. From November 1, 2026 PSI accepts the 2021 or the 2024 South Carolina codes (ICC codes with state modifications) and the 2023 or the 2020 NEC. After July 1, 2027 only the 2024 codes and the 2023 NEC. Bring one edition you know well and expect questions that read the same in both.
- Tab your books before exam day: highlighting, underlining and permanent tabs are allowed, but sticky notes and writing during the exam are not.
- Carpentry (12) and general code, plan reading and estimating (13) are the biggest sections, followed by concrete, masonry and metals (10 each).
- Scope is Groups 1 to 3, up to three stories: expect IBC construction type, height and area questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the SC IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Building Code (IBC), 2021 or 2024 edition with South Carolina modificationsEssential
On PSI's list. Code, plan reading and construction-type questions for the Limited Building Contractor exam.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
29 CFR Part 1926 (OSHA construction regulations)
On PSI's list for the building, electrical, plumbing and HVAC exams. Safety questions.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2021 or 2024 edition with South Carolina modifications
- 29 CFR Part 1926 (OSHA construction regulations)
- Modern Masonry, 9th Edition; Steel Joist Institute TD9; Carpentry and Building Construction, 2010 or 2016; Roofing Construction and Estimating; ACI Contractor's Guide; Pipe and Excavation Contracting; SC 811 excavator manual (all on PSI's list)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Sitework | 7 | |
| Concrete | 10 | |
| Masonry | 10 | |
| Metals | 10 | |
| Carpentry | 12 | |
| Thermal and Moisture Protection | 9 | |
| Doors and Windows | 2 | |
| Finishes | 2 | |
| Safety | 5 | |
| General Code, Plan Reading and Estimating | 13 |
Exam day details
- Administered by PSI Services for the South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board).
- Fee: $78 to PSI. Board application and license fees are separate.
- 80 scored questions plus 1 to 10 unscored experimental items (they count against your time) in 300 minutes; 56 correct (70%) to pass.
- Scope on PSI's outline: Groups 1 to 3, up to three stories. Group limits and net worth rules are in S.C. Code 40-11-260.
- Code editions: from November 1, 2026 PSI accepts the 2021 or 2024 South Carolina codes (NEC 2023 or 2020); after July 1, 2027 only the 2024 codes and the 2023 NEC. Our questions are written to be correct under both.
- Open book: bring the references on PSI's list. You may highlight, underline and add permanent tabs (tabs that would tear the page if removed); sticky notes and removable tabs are not allowed.
- Apply to the Contractor's Licensing Board first. After approval you get an eligibility letter and register with PSI (855-340-3701) for each exam; the registration confirmation is valid 1 year or until a classification has been failed twice.
- You may take each trade exam twice in 12 months, then once every six months.
- Every Contractor's Licensing Board license needs the Business Management and Law exam and the technical exam for the classification, 70% on each (S.C. Code 40-11-230).
Frequently asked questions
What's on the South Carolina limited building contractor exam?
80 scored questions, led by General Code, Plan Reading and Estimating 13, carpentry 12, concrete 10, masonry 10, metals 10, thermal and moisture protection 9, sitework 7, safety 5 and 2 smaller topics.
How many Limited Building Contractor questions are carpentry?
12 of 80, the biggest single section after general code, plan reading and estimating (13). Concrete, masonry and metals are 10 each.
Which IBC edition is on the exam?
The 2021 or 2024 IBC with South Carolina modifications. After July 1, 2027 only the 2024 edition applies.
Free questions with answers
Show all 10 free questions and answers
A competent person classifies soil by testing a sample. Under Appendix A to Subpart P, what is the minimum testing needed to classify a deposit?
Answer: At least one visual and at least one manual analysis
Appendix A (c)(2) bases classification on at least one visual and at least one manual analysis by a competent person. If conditions change, such as heavy rain, the deposit must be reclassified.
Reference: 29 CFR 1926 Subpart P Appendix A, 29 CFR 1926 Subpart P, Appendix A, (c)(2)
A formed exterior concrete wall is exposed to weather and is reinforced with No. 5 bars. What minimum cover does ACI 318 require over the bars?
Answer: 1-1/2 inches
ACI 318-19 Table 20.5.1.3.1: formed concrete exposed to weather or in contact with ground needs 2 inches of cover for No. 6 through No. 18 bars and 1-1/2 inches for No. 5 and smaller. Three inches is only for concrete cast against the ground.
Reference: ACI 318-19 (adopted by the 2021 and 2024 IBC, Section 1901.2), Table 20.5.1.3.1
A masonry chimney passes through a roof where the roof surface at the penetration is at elevation 20 feet. The ridge, 8 feet horizontally from the chimney, is at elevation 26 feet. What is the minimum elevation of the chimney top under the IBC?
Answer: 28 feet
IBC 2113.9 requires the chimney to extend at least 3 feet above the highest point where it passes through the roof (20 + 3 = 23 ft) and at least 2 feet higher than any part of the building within 10 feet (ridge 8 ft away: 26 + 2 = 28 ft). The chimney must satisfy both, so 28 feet governs.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC 2113.9
A crane is setting a solid-web steel beam between two columns. How many bolts must secure each connection before the hoist line load is released?
Answer: At least two bolts per connection, drawn wrench-tight
1926.756(a)(1) says the load shall not be released from the hoisting line until the member is secured with at least two bolts per connection, of the size and strength shown on the erection drawings, drawn up wrench-tight, except as allowed for certain connections. A competent person decides whether cantilevered members need more.
Reference: 29 CFR 1926 Subpart R, 29 CFR 1926.756(a)(1)
A wood sleeper sits on a concrete slab that is in direct contact with the earth. What does the IBC require of the sleeper?
Answer: It must be naturally durable or preservative-treated wood
IBC 2304.12.1.4 requires sleepers and sills on a concrete or masonry slab in direct contact with earth to be naturally durable or preservative-treated wood. Moisture wicks through the slab, so the slab does not remove the requirement.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC 2304.12.1.4
What is the minimum roof slope on which the IBC allows asphalt shingles to be used?
Answer: 2 units vertical in 12 horizontal (2:12)
IBC 1507.2.2 allows asphalt shingles only on slopes of 2:12 or greater. For slopes from 2:12 up to 4:12, double underlayment is required.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC 1507.2.2
What minimum clear opening width and height must an egress door opening provide under the IBC, with the width measured with the door open 90 degrees?
Answer: 32 inches wide by 80 inches high
IBC 1010.1.1 requires a clear opening width of at least 32 inches, measured between the face of the door and the stop with the door open 90 degrees, and a clear opening height of at least 80 inches.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC 1010.1.1
What is the minimum height of a weep screed above earth and above paved areas under the IBC for exterior plaster on stud walls?
Answer: 4 inches above earth; 2 inches above paved areas
IBC 2512.1.2 requires a weep screed (minimum 0.019-inch corrosion-resistant, with a 3-1/2 inch vertical flange) at or below the foundation plate line, placed at least 4 inches above earth or 2 inches above paved areas.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC 2512.1.2
At what height above a lower level must an employee on a walking/working surface with an unprotected side or edge be protected from falling in general construction (not steel erection)?
Answer: 6 feet or more
29 CFR 1926.501(b)(1) requires fall protection (guardrail, safety net or personal fall arrest system) for employees on a surface with an unprotected side or edge 6 feet or more above a lower level. The 15-foot figure applies in steel erection under Subpart R, and 10 feet applies to scaffolds.
Reference: 29 CFR 1926 Subpart M, 29 CFR 1926.501(b)(1)
A retail sales floor in a Group M building measures 3,000 sq ft gross. Using Table 1004.5, what is the minimum occupant load for that area?
Answer: 50 occupants
Table 1004.5 (2021 and 2024 IBC) gives 60 sq ft gross per occupant for mercantile areas. 3,000 / 60 = 50. Dividing by 150 (the business factor) gives 20; 30 and 200 come from using 100 and 15 sq ft per occupant, factors for other uses.
Reference: 2021 International Building Code (SC); same text in the 2024 IBC, IBC Table 1004.5
Sources
- PSI: South Carolina Contractor's Licensing Board Candidate Information Bulletin (updated 9/15/2026) (opens in a new tab)
- South Carolina Contractor's Licensing Board (LLR) (opens in a new tab)
- South Carolina Code of Laws Title 40 Chapter 11 (contractors) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.