Requirements at a glance
| Agency | City of Lancaster Board of Plumber Examiners (and other cities that name the ICC exam); exam by ICC, delivered by Pearson VUE |
|---|---|
| Exam | ICC Master Plumber: 100 questions, 4 hours, open book |
| Experience (Lancaster) | 6 years of plumbing experience: 4 as an apprentice and at least 2 as a licensed journeyman |
| Books allowed | International Plumbing Code (edition per ICC outline; confirm with the city) |
| Fees | $50 Lancaster exam application fee; about $120 to the testing vendor (TODO(verify): current fee) |
Plumbers applying for a Lancaster master plumber license (6 years of experience, including 2 as a licensed journeyman). Reading's plumbing exam is reported to be the same ICC exam, but that is a prep-vendor claim only.
Official links
How to get licensed, step by step
Apply to the Board
Send the Master Plumber License Qualification Examination application and $50 fee to the Bureau of Code Compliance and Inspections at least 10 days before the Board's monthly meeting (second Monday).
City of Lancaster: Bureau of Code Compliance and Inspections (opens in a new tab)
Take the ICC exam
After approval, book the ICC Master Plumber exam at a Pearson VUE center. If you fail, wait 10 days to retake.
Schedule with Pearson VUE (ICC exams) (opens in a new tab)ICC: National Contractor/Trades Examination Bulletin (opens in a new tab)
Send your passing certificate
Give the Bureau your passing certificate to complete the license.
City of Lancaster: Bureau of Code Compliance and Inspections (opens in a new tab)
How to prepare
- Administration and general regulations are 46% of the exam: know the IPC's chapters 1 to 3 and the testing and materials rules.
- Tab your IPC for fixture unit tables, drain and vent sizing and trap requirements.
- Pennsylvania has no statewide electrician or plumber license; each city sets its own. Confirm the exam and code edition with the city that will license you.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Plumbing Code (IPC), 2018 EditionEssential
Allowed in the exam room. Most of the exam comes from it. Confirm the edition with your city.
Official reference list (as published by the testing agency)
- International Plumbing Code (IPC), 2018 edition on ICC's national outline (open book)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE; named by the City of Lancaster Board of Plumber Examiners (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Administration General Regulations | 46 | |
| Plumbing Fixtures | 14 | |
| Water Supply and Distribution | 11 | |
| Sanitary Drainage | 11 | |
| Plumbing Vent Requirements | 8 | |
| Traps, Interceptors, and Separators | 8 | |
| Storm Drainage | 2 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE; named by the City of Lancaster Board of Plumber Examiners.
- Fee: About $120 to ICC's testing vendor (national bulletin pricing). TODO(verify): current Pearson VUE fee. Lancaster charges a separate $50 exam application fee.
- 100 questions in 4 hours, open book, on the International Plumbing Code. The outline is ICC's national Master Plumber outline (G24, 2018 IPC).
- Lancaster's application says the exam is based on the IPC version in effect in Pennsylvania at the time you test. Pennsylvania's statewide code moved to the 2021 I-Codes on January 1, 2026, and ICC also publishes a 2021 IPC version of this exam. TODO(verify): confirm the IPC edition with Lancaster's Bureau of Code Compliance and Inspections.
- Lancaster's Board of Plumber Examiners must approve your application before you test. You need 6 years of plumbing experience: 4 as an apprentice and at least 2 as a licensed journeyman.
- Pennsylvania has no statewide electrician or plumber license. Cities and counties license these trades, so confirm with your city which ICC exam and code edition it requires.
- If you fail, wait 10 days to retake an ICC exam.
Frequently asked questions
Which exam does Lancaster require?
The ICC Master Plumber written (computerized) exam, based on the IPC in effect in Pennsylvania at the time of the exam.
What's on the exam?
Administration and general regulations 46%, plumbing fixtures 14%, water supply and distribution 11%, sanitary drainage 11%, plumbing vent requirements 8%, traps, interceptors and separators 8% and storm drainage 2%.
Is it open book?
Yes. This ICC national outline is open book, unlike Philadelphia's closed-book plumber exams.
Free questions with answers
Show all 10 free questions and answers
A four-story drain, waste and vent system is being water tested in sections. Each section is filled to its highest opening. What is the least head of water and the least holding time the code requires?
Answer: 10 feet of head, held for 15 minutes
Section 312.2 says sections are tested with not less than a 10-foot head, the upper 10 feet of the preceding section is re-tested with the next, and the pressure is held at least 15 minutes. The 5-minute and 5-foot figures are not in the section.
Reference: 2018 International Plumbing Code, Section 312.2
A plumber wants to use plastic sheathing to keep a steel-framed-wall copper line from touching framing. What minimum thickness does Section 305.1 require for the sheathing?
Answer: 0.008 inch (8 mil) plastic
Section 305.1 bars direct contact of most metallic piping with steel framing, concrete, masonry or corrosive soil. Where sheathing is used it must be plastic at least 0.008 inch (8 mil) thick. The 0.0575 inch figure is the steel shield plate in Section 305.6.
Reference: 2018 International Plumbing Code, Section 305.1
A stall is framed for a wall-hung water closet in a public restroom. What are the minimum inside dimensions of the compartment under Section 405.3.1?
Answer: 30 inches wide and 56 inches deep
Section 405.3.1 requires water closet compartments to be at least 30 inches wide and 60 inches deep for floor-mounted closets, and 30 inches wide and 56 inches deep for wall-hung closets.
Reference: 2018 International Plumbing Code, Section 405.3.1
Two lavatories are installed side by side in an open washroom with no partition between them. What is the minimum center-to-center spacing under Section 405.3.1?
Answer: 30 inches
Section 405.3.1 requires 30 inches center to center between adjacent fixtures that are not separated by a partition. The 15 inches is the center-to-side-wall distance and 21 inches is the clearance in front of the fixture.
Reference: 2018 International Plumbing Code, Section 405.3.1
A kitchen sink faucet has an effective opening of 3/4 inch and discharges close to a wall. What is the minimum air gap above the flood level rim under Table 608.16.1?
Answer: 2-1/2 inches
Table 608.16.1 gives 1-1/2 inches away from a wall and 2-1/2 inches close to a wall for sinks and other fixtures with effective openings not greater than 3/4 inch. The 1-1/2 inch value is the away-from-wall gap.
Reference: 2018 International Plumbing Code, Table 608.16.1
A new commercial kitchen has quick-closing valves on its dishwasher and hand-wash faucet. What does Section 604.9 require?
Answer: A water-hammer arrestor conforming to ASSE 1010
Section 604.9 requires flow velocity to be controlled to reduce water hammer and requires a water-hammer arrestor, conforming to ASSE 1010 and installed per the manufacturer, where quick-closing valves are used.
Reference: 2018 International Plumbing Code, Section 604.9
A 4-inch horizontal drain carries kitchen waste to a grease interceptor. What minimum slope does Section 704.1 require for this piping?
Answer: 1/4 inch per foot, even though 4-inch pipe is normally 1/8
Section 704.1 says that drainage piping upstream of a grease interceptor must have a slope of at least 1/4 inch per foot (2 percent), overriding Table 704.1 for that piping.
Reference: 2018 International Plumbing Code, Section 704.1
A plumbing vent terminates 8 feet horizontally from an openable window on the same building. How far above the top of the window must it extend under Section 903.5?
Answer: At least 3 feet above the top of the opening
Section 903.5 says a vent terminal may not be within 10 feet horizontally of an openable window, door or air intake unless it is 3 feet or more above the top of the opening, and never directly beneath one.
Reference: 2018 International Plumbing Code, Section 903.5
What depth of liquid seal must each fixture trap have under Section 1002.4, excluding special designs for accessible fixtures?
Answer: At least 2 inches and not more than 4 inches
Section 1002.4 requires each fixture trap to have a liquid seal of not less than 2 inches and not more than 4 inches, or deeper for special designs for accessible fixtures.
Reference: 2018 International Plumbing Code, Section 1002.4
A flat roof measures 50 feet by 60 feet. A vertical wall 20 feet wide and 12 feet high rises above the roof and sheds rainwater onto it. Under Section 1106.4, what area is used to size the roof drainage?
Answer: 3,120 square feet, from the roof plus half of the wall area
Roof area: 50 x 60 = 3,000 sq ft. Wall area: 20 x 12 = 240 sq ft; Section 1106.4 adds one-half of it, 120 sq ft. Total 3,120 square feet.
Reference: 2018 International Plumbing Code, Section 1106.4
Sources
- City of Lancaster: Master Plumber License Qualification Examination application (opens in a new tab)
- ICC National Contractor/Trades Examination Information Bulletin (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.