Oklahoma licensing exam

Oklahoma Plumbing Journeyman and Natural Gas Exam: Practice Test & Licensing Guide

The PSI exam for an Oklahoma journeyman plumber license: 85 scored questions on the International Plumbing Code and Fuel Gas Code with Oklahoma revisions. Open book, 70% to pass.

Questions
85
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Vents

A restaurant owner converts a flat roof into an outdoor bar and seating deck. An existing open vent pipe stays in service on the roof. How far above the finished walking surface must it terminate within 10 feet horizontally?

Requirements at a glance

AgencyOklahoma Construction Industries Board (CIB); exams by PSI
Experience3 years of plumbing experience
Exam85 scored questions, 3 hours, 70% (60)
Books allowedIPC and IFGC (2018 or 2024 with Oklahoma revisions), Mathematics for Plumbers and Pipefitters 8th ed., 29 CFR 1926
Fee$92 to PSI per exam portion (non-refundable), plus CIB application and license fees
Retest30 days after a fail; 90 days after each later fail (electrical is always 30)

Plumbers applying to the Oklahoma Construction Industries Board for a journeyman license after three years of documented experience. The Plumbing Contractor exam uses the same blueprint plus Plumbing Business and Law.

How to get licensed, step by step

  1. Register and log your hours

    Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  2. Apply to the CIB

    Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  3. Schedule with PSI

    Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.

    Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)

  4. Pass and get licensed

    After you pass, send the CIB your results and license fee to receive your license.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

How to prepare

  • All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
  • Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
  • Vents (13) is the biggest section; tab IPC Chapter 9 and Table 906.1 along with drain sizing in Chapter 7.
  • Isometric analysis (7) means adding fixture units and sizing drains and vents from a layout. Fuel gas (10) comes from the IFGC: tab pipe sizing tables and Chapter 4.
  • The pass mark is 75%, higher than the other Oklahoma exams.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the IPC and the IFGC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code, 2018 or 2024 edition, with Oklahoma revisions
  • International Fuel Gas Code, 2018 or 2024 edition, with Oklahoma revisions
  • Mathematics for Plumbers and Pipefitters, Lee Smith, 8th Edition
  • 29 CFR Part 1926 (OSHA construction), or PSI's selections

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Plumbing10
Piping, Valves, and Control Valves8
Fixtures and Equipment8
Water Supply10
Drains and Sewers10
Vents13
Traps, Interceptors, Indirect, and Special Wastes5
Isometric Analysis7
Fuel Gas10
Safety4

Exam day details

  • Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
  • Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
  • 85 scored questions in 3 hours (180 minutes); 60 correct (70%) to pass. Before November 1, 2026 the pass mark was 75% (64).
  • Edition note: the bulletin names the 2018 IPC and IFGC first and allows the 2024 editions from 10/8/2026. Oklahoma adopted the 2024 codes effective 9/14/2026. Our questions follow the 2024 codes with Oklahoma amendments.
  • If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
  • Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
  • PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
  • The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.

Note: The date the 2018 codes stop being accepted differs between the PSI bulletin and CIB notices; check the current bulletin on your test date.

Frequently asked questions

What's on the Oklahoma journeyman plumber exam?

85 scored questions: vents 13, general plumbing, water supply, drains and sewers and fuel gas 10 each, piping and valves and fixtures and equipment 8 each, isometric analysis 7, traps and interceptors 5 and safety 4.

Which IPC edition is on the Oklahoma plumbing exam?

The bulletin lists the 2018 IPC and allows the 2024 edition from October 8, 2026, with Oklahoma revisions. The 2018 edition is being phased out, so buy the 2024 edition and check the current bulletin on your test date.

What score do I need?

70%, which is 60 of the 85 scored questions. Before November 1, 2026 plumbing exams required 75% (64).

Free questions with answers

Show all 10 free questions and answers
  1. A restaurant owner converts a flat roof into an outdoor bar and seating deck. An existing open vent pipe stays in service on the roof. How far above the finished walking surface must it terminate within 10 feet horizontally?

    Answer: 7 feet

    Where the roof serves as a promenade, restaurant, bar, sunbathing or observation deck, Section 903.1.2 requires open vent pipes within 10 feet horizontally to end at least 7 feet above the finished occupiable surface. The 10-inch figure in Section 903.1.1 is only for roofs nobody uses.

    Reference: 2024 International Plumbing Code, Section 903.1.2

  2. A horizontal building drain turns 90 degrees at one point, then turns another 90 degrees 25 feet of developed length later, and a third 90 degrees 12 feet after that. How many cleanouts are required just for these three changes of direction?

    Answer: One, at the first change of direction

    Section 708.1.4 requires a cleanout at a change of horizontal direction greater than 45 degrees. When more than one such change occurs within 40 feet of developed length, the cleanout at the first change serves all of them. The second turn is 25 feet and the third is 37 feet from the first, so one cleanout covers all three.

    Reference: 2024 International Plumbing Code, Section 708.1.4

  3. On a riser diagram, a 4-inch horizontal branch drain collects 120 dfu from a row of public restrooms. Its branch vent runs 50 feet of developed length back to the vent stack. Applying Table 710.1(2) and Section 906.2, what is the smallest branch vent size?

    Answer: 2-1/2 inches

    Table 710.1(2) allows only 20 dfu on a 3-inch horizontal branch and 160 dfu on a 4-inch branch, so 4 inches is the required drain size for 120 dfu. Section 906.2 sets the branch vent at not less than one-half the required drain diameter: 4 / 2 = 2 inches. Because the vent exceeds 40 feet of developed length, it is increased one nominal size for its entire length, from 2 inches to 2-1/2 inches. Stopping at 2 inches ignores the 40-foot rule; 3 inches is a double increase.

    Reference: 2024 International Plumbing Code, Section 906.2

  4. A plumber is placing a P-trap below a lavatory. By Section 1002.1, what are the maximum distances from the fixture outlet to the trap?

    Answer: 24 inches vertically to the trap weir and 30 inches horizontally

    Section 1002.1 limits the vertical distance from the fixture outlet to the trap weir to 24 inches, and the horizontal distance from the centerline of the fixture outlet to the centerline of the trap inlet to 30 inches. Reversing the two numbers is the common mistake.

    Reference: 2024 International Plumbing Code, Section 1002.1

  5. A restaurant installs a dishwasher with a solenoid (quick-closing) valve. Which device does Section 604.9 require, and to which standard must it conform?

    Answer: A water-hammer arrestor conforming to ASSE 1010

    Section 604.9 requires a water-hammer arrestor wherever quick-closing valves are used, and arrestors must conform to ASSE 1010. ASSE 1003 is the pressure-reducing valve standard cited in Section 604.8.

    Reference: 2024 International Plumbing Code, Section 604.9

  6. A new natural gas system has a proposed maximum working pressure of 5 psig. What is the minimum test pressure under Section 406.4.1?

    Answer: 7.5 psig

    Section 406.4.1 requires a test pressure of at least 1-1/2 times the proposed maximum working pressure, but not less than 3 psig. 1.5 x 5 psig = 7.5 psig. Testing at the working pressure alone (5 psig) is too low, and 3 psig is only the floor used for low-pressure systems.

    Reference: 2024 International Fuel Gas Code, Section 406.4.1

  7. Exterior water supply piping must be installed at what minimum depth?

    Answer: 6 inches below the frost line and 12 inches below grade

    Section 305.4 requires exterior water supply piping to be not less than 6 inches below the frost line and not less than 12 inches below grade. Pipes in places subject to freezing must also be protected by insulation, heat or both.

    Reference: 2024 International Plumbing Code, Section 305.4

  8. Two water closets in a row have no partition between them. What is the minimum center-to-center spacing?

    Answer: 30 inches

    Section 405.3.1 requires 30 inches center to center between adjacent water closets, urinals or bidets that are not separated by partitions or obstructions. The 15-inch value is the distance from the center of one fixture to a side wall.

    Reference: 2024 International Plumbing Code, Section 405.3.1

  9. What is the maximum horizontal hanger spacing for PVC drainage pipe under Table 308.5?

    Answer: 4 feet

    Table 308.5 lists PVC pipe at 4 feet horizontal and 10 feet vertical (with a guide for sizes 2 inches and smaller). Five feet is cast iron, and 10 feet is large copper tubing.

    Reference: 2024 International Plumbing Code, Table 308.5

  10. At what depth must trench excavations generally be protected by a protective system unless they are in stable rock?

    Answer: 5 feet or deeper

    29 CFR 1926.652(a)(1) requires employees in excavations to be protected by a sloping, shoring or shielding system except in stable rock or where the excavation is less than 5 feet and examination by a competent person finds no indication of a cave-in.

    Reference: 29 CFR Part 1926, 29 CFR 1926.652(a)(1)

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.