Oklahoma Natural Gas Journeyman Exam: Practice Test & Licensing Guide

The PSI exam for an Oklahoma natural gas journeyman license: 30 scored questions on fuel gas piping knowledge and regulations, pipe sizing, pipe installation and safety. Open book, 70% to pass.

Questions
30
Time limit
90 min
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Pipe Sizing

A fitter is sizing Schedule 40 black steel pipe for natural gas. The supply is under 2 psi and the design allows a 0.5-inch water column pressure drop. Which table in IFGC Section 402.4 should the fitter use?

Requirements at a glance

AgencyOklahoma Construction Industries Board (CIB); exams by PSI
ExperienceGas piping experience (hours not stated in the bulletin; see the CIB)
Exam30 scored questions, 90 minutes, 70% (21)
Books allowedIFGC (2018 or 2024 with Oklahoma revisions), 29 CFR 1926
Fee$92 to PSI per exam portion (non-refundable), plus CIB application and license fees
Retest30 days after a fail; 90 days after each later fail (electrical is always 30)

Gas fitters applying to the Oklahoma Construction Industries Board for a journeyman license to install, repair, alter or extend gas piping and gas mains. The Natural Gas Contractor exam is longer.

How to get licensed, step by step

  1. Register and log your hours

    Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  2. Apply to the CIB

    Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  3. Schedule with PSI

    Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.

    Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)

  4. Pass and get licensed

    After you pass, send the CIB your results and license fee to receive your license.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

How to prepare

  • All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
  • Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
  • Pipe installation (15) is half the exam: tab IFGC Chapter 4 and the sections on joints, valves, drip legs, sediment traps and outlets.
  • Pipe sizing is only 4 questions, but practise the IFGC sizing tables so they take seconds.
  • The Natural Gas Contractor exam is longer (40 questions) with the same references.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the IFGC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Fuel Gas Code, 2018 or 2024 edition, with Oklahoma revisions
  • 29 CFR Part 1926 (OSHA construction), or PSI's selections

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Fuel Gas Piping Knowledge, Definitions, and Regulations8
Pipe Sizing4
Pipe Installation15
Safety3

Exam day details

  • Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
  • Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
  • 30 scored questions in 90 minutes; 21 correct (70%) to pass.
  • Edition note: the bulletin allows the 2018 or 2024 IFGC with Oklahoma revisions; the 2024 code may be used from 9/14/2026 and the 2018 code is no longer allowed as of 12/14/2026. Our questions follow the 2024 code with Oklahoma amendments.
  • If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
  • Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
  • PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
  • The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.

Frequently asked questions

What's on the Oklahoma natural gas journeyman exam?

30 scored questions: pipe installation 15, general fuel gas piping knowledge, definitions and regulations 8, pipe sizing 4 and safety 3.

Is the natural gas contractor exam different?

Yes. It has 40 scored questions in 120 minutes with more weight on pipe sizing and knowledge.

What can I bring?

The IFGC 2018 or 2024 edition with Oklahoma revisions and 29 CFR Part 1926 (or PSI's selections); the exam is open book.

Free questions with answers

Show all 10 free questions and answers
  1. A fitter is sizing Schedule 40 black steel pipe for natural gas. The supply is under 2 psi and the design allows a 0.5-inch water column pressure drop. Which table in IFGC Section 402.4 should the fitter use?

    Answer: Table 402.4(2)

    Tables 402.4(1) and 402.4(2) both cover natural gas in Schedule 40 metallic pipe with an inlet pressure under 2 psi; the pressure drop is what separates them: 0.3 in. w.c. for (1) and 0.5 in. w.c. for (2). Table 402.4(3) is the 3.0 in. w.c. drop table (for 8 in. w.c. or greater supply) and Table 402.4(9) is semirigid copper tubing, not steel pipe.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Table 402.4(2)

  2. Using Table 402.4(2) (natural gas, Schedule 40 metallic pipe, inlet under 2 psi, 0.5 in. w.c. drop), what is the capacity of 1-inch pipe at a length of 40 feet?

    Answer: 320 cubic feet of gas per hour

    Find the 40 ft row and the 1-inch column of Table 402.4(2): 320 cfh. The 284 cfh value is the 50 ft row, 374 cfh is the 30 ft row, and 243 cfh is the 1-inch, 40 ft value from Table 402.4(1), the 0.3 in. w.c. table, which is the wrong table for a 0.5 in. w.c. design.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Table 402.4(2)

  3. A natural gas system uses Schedule 40 steel pipe, supply under 2 psi, 0.5 in. w.c. drop (Table 402.4(2)). The meter outlet runs 20 ft to the first tee. Beyond the tee, the longest run to the most remote appliance brings the total to 70 ft. Loads: furnace 80 cfh, range 65 cfh, water heater 40 cfh, dryer 35 cfh. Using the longest length method, what size is the 20-ft section from the meter to the tee, which carries all four appliances?

    Answer: 1 inch

    Total load = 80 + 65 + 40 + 35 = 220 cfh. Section 402.4.1 says each section is sized with the longest length from the point of delivery to the most remote outlet (70 ft), not the section's own length. At 70 ft, 3/4 inch carries only 126 cfh and 1 inch carries 237 cfh, so 1 inch is the smallest adequate size. The 3/4 inch answer comes from wrongly using the 20-ft row (247 cfh).

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Section 402.4.1; Table 402.4(2)

  4. For a natural gas system with a gas meter, where is the point of delivery as defined in IFGC Chapter 2?

    Answer: At the outlet of the service meter assembly

    Chapter 2 defines the point of delivery for natural gas as the outlet of the service meter assembly (or the outlet of the service regulator or service shutoff valve where no meter is provided). Everything before it belongs to the serving gas supplier, and the code's piping system starts here.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Chapter 2, Section 202, Point of Delivery

  5. Section 101.2.3 says the IFGC covers fuel gas piping systems for natural gas up to what operating pressure?

    Answer: 125 psig

    Section 101.2.3 covers natural gas piping up to 125 psig and LP-gas piping up to 20 psig, except as provided in Section 402.7. The 5 psig figure is the usual limit inside buildings in Section 402.7 and 20 psig is the LP-gas limit, so neither is the natural gas scope limit.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Section 101.2.3

  6. Which of the following installations is listed in Section 101.2.5 as outside the scope of the IFGC?

    Answer: Liquefied natural gas (LNG) installations

    Section 101.2.5 excludes, among others, liquefied natural gas (LNG) installations, petroleum refineries, oxygen-fuel gas cutting and welding systems and portable LP-gas appliances not connected to fixed piping. Fixed fuel piping to rooftop units, boilers and building LP-gas systems is exactly what the code regulates.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Section 101.2.5

  7. A section of steel gas pipe lighter than Schedule 40 is being installed. According to Section 403.9.1, which joining method is permitted?

    Answer: Welding

    Section 403.9.1 allows Schedule 40 and heavier pipe to be threaded, flanged, brazed, welded or joined with listed press-connect fittings. Pipe lighter than Schedule 40 must be joined with press-connect fittings, flanges, brazing or welding because threading would cut too deeply into the thin wall. Solvent cement is for plastics and flared joints are for nonferrous pipe and tubing only.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Section 403.9.1

  8. Which statement about metallic fittings in Section 403.9.5 is correct?

    Answer: Threaded fittings larger than 4 inches shall not be used

    Section 403.9.5 states that threaded fittings in sizes larger than 4 inches shall not be used. It also prohibits cast-iron bushings, requires that threads not form the joint seal on aluminum-alloy fittings, and bars zinc aluminum-alloy fittings in systems containing flammable gas-air mixtures.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), Section 403.9.5

  9. A gas fitter is working in a trench 5 feet deep. What is the maximum lateral travel to a ladder, stairway or ramp under 29 CFR 1926.651(c)(2)?

    Answer: 25 feet

    Trench excavations 4 feet or more in depth must have a stairway, ladder, ramp or other safe means of egress located so employees need no more than 25 feet of lateral travel to reach it.

    Reference: OSHA 29 CFR Part 1926, 29 CFR 1926.651(c)(2)

  10. A trench near a gas station storage tank is 6 feet deep and a hazardous atmosphere could reasonably be expected. What does 29 CFR 1926.651(g)(1)(i) require before employees enter?

    Answer: The atmosphere in the excavation must be tested

    Section 1926.651(g)(1)(i) requires testing the atmosphere in excavations deeper than 4 feet before employees enter where oxygen deficiency (less than 19.5 percent) or a hazardous atmosphere exists or could reasonably be expected to exist.

    Reference: OSHA 29 CFR Part 1926, 29 CFR 1926.651(g)(1)(i)

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.