Requirements at a glance
| Agency | North Dakota State Electrical Board (NDSEB); board-run exam |
|---|---|
| Experience | 1 year and at least 2,000 hours as a licensed journeyman under a contracting master or master of record |
| Exam | 1 hour closed book plus 3.5 hours open book; 70% to pass |
| Books allowed | Code books are supplied by the Board (NEC and the North Dakota Laws, Rules, Wiring and Conveyance Standards) |
| Fees | Application fee $50 (NDAC 24.1-03-01-01); exam fee not published; license fee set by the Board |
Journeymen applying to the State Electrical Board for a master license (contracting master, master of record or non-contracting master) after 1 year and at least 2,000 hours as a licensed journeyman.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board your license application and fee. If approved, you receive an invite listing the exam dates then available.
North Dakota State Electrical Board (opens in a new tab)NDSEB: exam dates and information (opens in a new tab)
Pick a date and test
You must test within 6 months of the invite. A cancellation or no-show means a new application and fee.
Pass both parts
A 1-hour closed-book part and a 3.5-hour open-book part; the passing grade is 70%. The Board gives no exam reviews.
If you fail
Send a re-exam application and fee. Waits depend on your score: 60 to 69 none, 50 to 59 three months, 0 to 49 six months.
How to prepare
- Exams given in December 2026 and later are based on the 2026 NEC and the 2026 ND Laws, Rules, Wiring and Conveyance Standards. Our questions follow the 2026 NEC and cite the 2026 article number where one moved (for example Article 120, formerly 220).
- The Board publishes no outline or question counts, so our topic split is an estimate. Expect fundamental electricity, the NEC and the North Dakota wiring standards.
- The Board supplies the code books, calculators and pencils, so practice finding answers fast in the 2026 NEC and tab the North Dakota rules you know you will need.
- Know the three master categories (contracting, master of record, non-contracting) and practice service and feeder load calculations under Article 120 (formerly 220).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2026 EditionEssential
The Board supplies code books in the exam room. Exams given from December 2026 are based on the 2026 NEC and the 2026 ND Laws, Rules, Wiring and Conveyance Standards.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), the edition in force at your exam date. Exams given in December 2026 and later are based on the 2026 NEC and the 2026 ND Laws, Rules, Wiring and Conveyance Standards.
- North Dakota Laws, Rules, Wiring and Conveyance Standards (NDAC 24.1)
- The Board provides code books, calculators and pencils; you do not bring your own.
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| General Knowledge and Plan Reading | 8 | |
| Services and Service Equipment | 12 | |
| Feeders | 8 | |
| Branch Circuits and Conductors | 14 | |
| Wiring Methods and Materials | 14 | |
| Equipment and Devices | 8 | |
| Motors and Generators | 8 | |
| Special Occupancies, Equipment and Conditions | 12 | |
| North Dakota Laws, Rules and Wiring Standards | 16 |
Exam day details
- Administered by the North Dakota State Electrical Board (board-run exam).
- Fee: Exam fee not published. Application fees: $50 master and Class B, $40 journeyman (NDAC 24.1-03-01-01). License fees are separate.
- Closed book 1 hour plus open book 3.5 hours; 70% to pass. Question counts are not published; our practice exam uses 100 questions.
- The exam has a closed-book part (1 hour) and an open-book part (3.5 hours). The Board supplies the code books, calculators and pencils.
- Apply to the Board first. If approved you get an invite listing the available dates, and you must test within 6 months of the invite. A cancellation or no-show means a new application and fee.
- The passing grade is 70%. After a failed exam, send a re-exam application and fee. Waits depend on your score: 60 to 69 none, 50 to 59 three months, 0 to 49 six months. The Board gives no exam reviews.
- Our questions follow the 2026 NEC. Where an article was renumbered, we cite the 2026 number (for example Article 120, formerly 220). We could not read the 2026 NEC text itself, so questions use only rules confirmed unchanged from 2023 or confirmed in published change lists.
Note: The State Electrical Board does not publish question counts, a content outline or topic weights, so the question count and topic split here are our estimates. Exams from December 2026 are based on the 2026 NEC; we could not read the NFPA 2026 text, so confirm article numbers in the code book the Board provides.
Frequently asked questions
What's on the North Dakota master electrician exam?
The Board says it covers fundamental electricity, the North Dakota Laws, Rules and Wiring Standards and the NEC. It publishes no outline, so our topic split is an estimate that leans on service and feeder load calculations, special occupancies and North Dakota rules.
What are the master license categories?
A contracting master runs a business and carries liability insurance. A master of record answers for one organization and may only work on its property. A non-contracting master has the same responsibility as a journeyman and works under a contracting master or master of record.
Which NEC edition do the exams use?
Exams given in December 2026 and later use the 2026 NEC and the 2026 ND Laws, Rules, Wiring and Conveyance Standards.
Free questions with answers
Show all 10 free questions and answers
On an electrical floor plan drawn at 1/4 inch = 1 foot, a feeder run scales 7 1/2 inches on the drawing, and the notes add a 12-foot vertical riser. What total feeder length should be used for pricing the wire?
Answer: 42 feet
At 1/4 inch per foot each inch is 4 feet, so 7.5 in. x 4 = 30 ft of horizontal run. The 12-foot riser is not shown by the plan scale and is added: 30 + 12 = 42 ft. 30 ft forgets the riser, 54 ft counts the riser twice (30 + 24), and 72 ft reads the drawing at 1/8 in. = 1 ft (7.5 x 8 = 60, plus 12).
Reference: Plan reading and estimating practice (scale arithmetic), Plan reading: architectural scale 1/4 in. = 1 ft
A 480Y/277-volt, three-phase, 4-wire service is protected by a single main circuit breaker with a highest continuous trip setting of 800 amperes. A second building on the same campus has a 480Y/277-volt service with a 1,200-ampere main. Which statement is correct under 230.95?
Answer: The 1,200-ampere service needs ground-fault protection of equipment; the 800-ampere service does not
Section 230.95 requires ground-fault protection of equipment for solidly grounded wye services of more than 150 volts to ground but not over 1000 volts phase-to-phase, for each service disconnect rated 1000 amperes or more. 277 volts to ground meets the first test; only the 1,200-ampere disconnect meets the rating test. The 800-ampere service is under the threshold, so voltage alone does not trigger the rule.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 230.95
A feeder supplies 120 amperes of noncontinuous load and 80 amperes of continuous load. The feeder OCPD and its enclosure are not listed for operation at 100 percent. What is the smallest standard OCPD rating that satisfies 215.3?
Answer: 225 amperes
The OCPD must carry the noncontinuous load plus 125 percent of the continuous load: 120 + (80 x 1.25) = 120 + 100 = 220 A. 220 A is not a standard rating, and 240.6(A) with 240.4(B) permits rounding up to the next standard size, 225 A. 200 A is below the 220 A requirement, and 175 A is below even the 200 A actual load.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 215.3 and 240.6(A)
What does 210.4(B) require for every multiwire branch circuit at the point where the circuit originates?
Answer: A means that simultaneously disconnects all of its ungrounded conductors
Section 210.4(B) requires each multiwire branch circuit to have a means, such as a two-pole breaker or handle-tied single-pole breakers, that disconnects all ungrounded conductors at the same time at the point of origin. This protects workers who open the circuit and expect it to be dead. Separate unlinked breakers defeat that purpose, and the neutral is never the only conductor that is switched.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 210.4(B)
Under the small-conductor limits of 240.4(D), what is the maximum overcurrent protection for 12 AWG copper conductors?
Answer: 20 amperes
Section 240.4(D) limits 14 AWG copper to 15 A, 12 AWG copper to 20 A and 10 AWG copper to 30 A, even where the Table 310.16 ampacity is higher (25 A for 12 AWG at 75 degrees C). Fifteen amperes is the 14 AWG limit, and 25 and 30 amperes exceed the 12 AWG limit.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 240.4(D)
Rigid PVC conduit carrying 480-volt conductors will be buried under a commercial parking lot. Using Table 300.5(A), what is the minimum cover?
Answer: 24 inches
Table 300.5(A) requires 24 inches of cover under streets, highways, roads, alleys, driveways and parking lots for every wiring method in the table. Eighteen inches is the cover for PVC in most other locations, 12 inches applies to GFCI-protected residential circuits, and 6 inches applies to rigid metal conduit in most locations.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), Table 300.5(A)
A 75-kVA, three-phase transformer has a 480-volt primary and a 208Y/120-volt secondary. It is protected on the primary side only (no secondary protection). Using the 125 percent primary-only rule of Table 450.3(B) and its note allowing the next higher standard rating, what is the maximum primary OCPD rating?
Answer: 125 amperes
Primary current = 75,000 / (1.732 x 480) = 90.2 A. Table 450.3(B) allows primary-only protection at 125 percent of that: 90.2 x 1.25 = 112.8 A. That is not a standard rating, and the table's note allows the next higher standard rating from 240.6(A), 125 A. A 100 A device is the next lower size, 112.5 A is not a standard rating, and 150 A exceeds the allowed maximum.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), Table 450.3(B) and 240.6(A)
A single continuous-duty 25-horsepower, 460-volt, three-phase squirrel-cage induction motor has a full-load current of 34 amperes in Table 430.250. What is the minimum ampacity of the branch-circuit conductors under 430.22?
Answer: 42.5 amperes
For a single continuous-duty motor the conductors must have an ampacity of at least 125 percent of the full-load current in Table 430.250: 34 x 1.25 = 42.5 A. Thirty-four amperes omits the 125 percent factor, 39.1 A uses 115 percent, and 51 A uses 150 percent.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 430.22
Where a permanently installed swimming pool is wired, how far from the inside wall of the pool must the required 125-volt, 15- or 20-ampere general-purpose receptacle be located under 680.22(A)(1)?
Answer: At least 6 feet and not more than 20 feet
Section 680.22(A)(1) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit not less than 6 ft and not more than 20 ft from the inside wall of the pool, and not more than 6 ft 6 in. above the pool deck or grade. The other ranges are not in the section, and the rule does have a 20 ft maximum.
Reference: NFPA 70, National Electrical Code (2026 edition; requirement carried from the 2023 text), 680.22(A)(1)
A master electrician holds a master of record license for a manufacturing company. Under NDAC 24.1-03-01-02, which work is the master of record NOT allowed to do?
Answer: Electrical work on property that the company does not own or lease
A master of record is responsible for compliance with the North Dakota wiring standards for the organization and must show proof of liability insurance covering the master of record under the organization. The master of record is not allowed to work on property other than property owned or leased by the organization. Work for outside customers requires a contracting master.
Reference: North Dakota Administrative Code Title 24.1 (State Electrical Board laws, rules and wiring standards, 2026), NDAC 24.1-03-01-02(2)
Sources
- North Dakota State Electrical Board: exam dates and information (opens in a new tab)
- North Dakota State Electrical Board (qualifications, laws and rules) (opens in a new tab)
Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.