Nebraska licensing exam

Nebraska Electrical Contractor Exam: Practice Test & Licensing Guide

The PSI exam for a Nebraska electrical contractor (master) license: about 100 questions on the NEC, theory and the State Electrical Act. Open book.

Questions
100
Time limit
4 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Electrical Knowledge

A parking-lot lighting circuit is expected to carry its maximum current for long stretches every night. For the NEC to treat the load as continuous, for how long must that maximum current be expected to continue?

Requirements at a glance

AgencyNebraska State Electrical Division and State Electrical Board; exams by PSI
Experience1 year or 2,000 hours as a licensed journeyman (or an electrical engineering degree plus 1 year)
ExamReported at 100 questions; time and pass mark not published
Books allowedNEC (or NEC Handbook) with tabs and Ugly's Electrical References; confirm the list with PSI
FeesAbout $120 to PSI (valid 90 days), plus the Division's $180 application and a $187.50 (even year) or $375 (odd year) license fee

Licensed journeymen applying to the Nebraska State Electrical Division for an electrical contractor license after 1 year or 2,000 hours as a journeyman (or an electrical engineering degree plus 1 year).

How to get licensed, step by step

  1. Apply to the Division

    Send the State Electrical Division your exam and licensing application. It sends your eligibility to PSI.

    Division: exam information and licensing applications (opens in a new tab)Nebraska State Electrical Division (opens in a new tab)

  2. Schedule with PSI

    PSI emails you a scheduling link. Test sites are Grand Island, Lincoln, Norfolk, North Platte, Omaha, Scottsbluff and Sidney; there is no home testing.

    Division: PSI exam information (opens in a new tab)

  3. Pass the exam

    The exam is open book. After 3 attempts (270 days) you sit out 90 days, and you can test at most 3 times a year.

    Division: PSI exam information (opens in a new tab)

  4. Get licensed and renew

    Passing awards 6 hours of continuing education. The 2026 renewal window ran 10/1 to 12/31 and requires continuing education.

    Nebraska State Electrical Division (opens in a new tab)

How to prepare

  • Nebraska adopted the 2023 NEC on August 1, 2024, and the Division's exam scope lists the 2023 NEC. PSI's Nebraska bulletin was not available to us, so confirm the allowed edition and reference list in your PSI scheduling email.
  • Study the State Electrical Act, basic electricity theory and emergency circuits including fire alarm along with the NEC. Tab Articles 100, 110, 210, 220, 230, 240, 250, 310 and 430 and the Chapter 9 tables.
  • Each approval to test is good for 90 days, and a new application is needed for each attempt (Policy 37). Book your PSI slot soon after approval.
  • The contractor exam is reported to be longer than the journeyman exam; practice load calculations and pace yourself.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC) or the NEC Handbook, 2020 or 2023 edition (allowed in the exam room; Nebraska adopted the 2023 NEC on 8/1/2024)
  • Ugly's Electrical References (allowed in the exam room)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
General Electrical Knowledge10
Wiring and Protection20
Wiring Methods and Materials15
Equipment for General Use15
Special Occupancies10
Special Equipment5
Special Conditions5

Exam day details

  • Administered by PSI Services for the Nebraska State Electrical Division.
  • Fee: $120 to PSI, valid 90 days. Division application and license fees are separate.
  • Reported at 100 questions; the time limit and pass mark are not published.
  • The Division's exam scope is the 2023 NEC, basic electricity theory, the Nebraska State Electrical Act and emergency circuits including fire alarm.
  • Open book: bring your own NEC with tabs. Confirm the allowed edition and reference list in your PSI scheduling email.
  • You apply to the State Electrical Division first. It sends your eligibility to PSI, and PSI emails you a scheduling link. There is no home testing; test sites are Grand Island, Lincoln, Norfolk, North Platte, Omaha, Scottsbluff and Sidney.
  • Each approval to test is good for 90 days. After 3 attempts (270 days) you sit out 90 days, and you can test at most 3 times a year. A new exam application is needed for each attempt (Policy 37, 7/11/2025).
  • Passing awards 6 hours of continuing education credit.

Note: PSI's Nebraska candidate bulletin is not public, so the question count, time, pass mark and topic split for this exam are unverified. Confirm them with the State Electrical Division or in your PSI scheduling email.

Frequently asked questions

What's on the Nebraska electrical contractor exam?

The NEC, basic electricity theory, the Nebraska State Electrical Act and emergency circuits including fire alarm. No contractor outline is published, so our topic split follows the journeyman exam and is an estimate.

Who can take it?

Licensed journeymen with 1 year or 2,000 hours as a journeyman, or an electrical engineering degree plus 1 year.

Free questions with answers

Show all 10 free questions and answers
  1. A parking-lot lighting circuit is expected to carry its maximum current for long stretches every night. For the NEC to treat the load as continuous, for how long must that maximum current be expected to continue?

    Answer: 3 hours or more

    Article 100 defines a continuous load as one where the maximum current is expected to continue for 3 hours or more. That classification is why 210.19(A) and 210.20(A) add 125 percent of the continuous load when sizing conductors and overcurrent devices. Shorter times such as 1 or 2 hours are not the Code's threshold.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, Article 100, Continuous Load

  2. A 7.5-horsepower motor delivers its full rated output at 90 percent efficiency. Using 746 watts per horsepower, about how much electrical input power does it draw?

    Answer: 6,217 W

    Output = 7.5 x 746 = 5,595 W. Input = output / efficiency = 5,595 / 0.90 = 6,217 W. 5,595 W is the output (efficiency ignored), 6,994 W multiplies by 1.25, and 5,035 W multiplies the output by 0.90 instead of dividing.

    Reference: Electrical theory, Efficiency and horsepower (1 hp = 746 W)

  3. A service uses 3/0 AWG copper ungrounded conductors. The grounding electrode conductor runs to a single driven ground rod and is the only connection to that rod. What is the minimum copper grounding electrode conductor size?

    Answer: 6 AWG copper

    Table 250.66 would call for 4 AWG copper for 3/0 AWG service conductors, but 250.66(A) says that where the conductor is the sole connection to a rod, pipe or plate electrode, it need not be larger than 6 AWG copper. The table value is therefore capped at 6 AWG. 2 AWG applies to larger service conductors, and 8 AWG is below the cap.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 250.66(A) and Table 250.66

  4. A single-gang device box has two 14/2 NM cables with ground, each entering through an internal cable clamp, and one single-pole switch. Using 2.00 cubic inches per 14 AWG conductor from Table 314.16(B), what minimum box volume is required?

    Answer: 16.0 cubic inches

    Count under 314.16(B): four insulated 14 AWG conductors x 2.00 = 8.0; all equipment grounding conductors together count once = 2.0; the internal clamps together count once = 2.0; the switch yoke counts twice the largest conductor = 4.0. Total = 8.0 + 2.0 + 2.0 + 4.0 = 16.0 cubic inches. Leaving out the clamp allowance gives 14.0, counting each ground separately gives 18.0, and leaving out the switch gives 12.0.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 314.16(B) and Table 314.16(B)

  5. EMT is run exposed along a masonry wall. What is the standard maximum support interval, and how close to each box must it be secured?

    Answer: 10 ft between supports, and within 3 ft of each box

    Section 358.30 requires EMT to be secured at intervals not exceeding 10 ft and within 3 ft of each outlet box, junction box, cabinet or fitting. 4 1/2 ft and 12 in are the cable values for NM and similar cables (334.30), and 6 ft is the MC cable interval.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 358.30(A)

  6. A single continuous-duty 25-hp, 460-volt, three-phase motor has a full-load current of 34 A from Table 430.250. What is the minimum ampacity of the branch-circuit conductors?

    Answer: 42.5 A

    Section 430.22 requires branch-circuit conductors for a single motor to have an ampacity of at least 125 percent of the full-load current from the table (430.6(A)(1)): 34 x 1.25 = 42.5 A. 34 A leaves out the 125 percent factor, 85 A applies 250 percent (an overcurrent-device percentage, not a conductor rule), and 39.1 A uses 115 percent (an overload-relay value).

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 430.22 and Table 430.250

  7. A 75-kVA, three-phase transformer has a 208Y/120-volt secondary. What is the full-load secondary line current?

    Answer: 208 A

    Three-phase current = VA / (1.732 x E) = 75,000 / (1.732 x 208) = 208 A. 361 A is 75,000 / 208 (leaves out 1.732), 625 A divides by 120 V, and 120 A is just the secondary phase voltage mistaken for a current.

    Reference: Electrical theory, Three-phase transformer current (I = kVA x 1,000 / (1.732 x E))

  8. How must the circuit disconnecting means for a fire alarm branch circuit be identified?

    Answer: Red identification, marked FIRE ALARM CIRCUIT, accessible only to qualified persons

    Section 760.41(B) requires the circuit disconnecting means to have red identification, to be accessible only to qualified personnel and to be identified as FIRE ALARM CIRCUIT. The location of the branch-circuit overcurrent device must also be permanently identified at the fire alarm control unit. The red marking must not damage the overcurrent device or hide the manufacturer's markings.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 760.41(B)

  9. For the purposes of Article 625, how are electric vehicle charging loads treated?

    Answer: As continuous loads

    Section 625.42 states that electric vehicle charging loads are considered continuous loads for the purposes of the article, so branch-circuit and feeder sizing include the 125 percent multiplier. A timer or controller does not change that classification unless an energy management system or the other listed limits in 625.42 apply.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 625.42

  10. At a carnival, which lighting must not be protected by a GFCI?

    Answer: Egress lighting

    Section 525.23(C) states that egress lighting must not be protected by a GFCI, so a ground fault elsewhere cannot leave people in the dark. Section 525.23(A) requires GFCI protection for non-locking 125-volt receptacles used for disassembly and reassembly or accessible to the general public, and for equipment accessible to the public on 125-volt, 15- or 20-ampere circuits.

    Reference: NFPA 70, National Electrical Code (NEC), 2023 edition, 525.23(A) and (C)

Sources

Questions last verified November 6, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.