Mississippi licensing exam

Mississippi Mechanical Exam: Practice Test & Licensing Guide

The PSI trade exam for Mississippi mechanical contractors: 100 questions across HVAC, gas, boilers, piping, plumbing, fire sprinklers and load calculations. Open book, 70% to pass.

Questions
100
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Gas Systems

A buried gas line runs to a gas grill on a patio, in an area where no vehicle traffic or digging is expected, and the installation is approved. What is the minimum cover allowed for this individual outdoor appliance line?

Requirements at a glance

AgencyMississippi State Board of Contractors (MSBOC); exams by PSI
LicenseCommercial Certificate of Responsibility (projects of $50,000 or more)
Exams100 questions, 4 hours, 70%, plus the Law and Business Management exam
Books allowed2021 IMC, IPC and IFGC, NFPA 58, NFPA 13, Modern Refrigeration and Air Conditioning, Manual N, Manual D, SMACNA and the Pipefitters Handbook
Fees$120 per PSI exam portion (nonrefundable), plus the MSBOC application fee ($400 commercial; $100 for each added classification)

Qualifying individuals for a Mississippi commercial mechanical contractor classification covering HVAC, refrigeration, boilers, piping and plumbing.

How to get licensed, step by step

  1. Apply to the MSBOC

    Send the application, fee and a CPA-reviewed financial statement to the Board. The firm names a qualifying individual who takes the exams.

    MSBOC: contractor licenses (opens in a new tab)Mississippi State Board of Contractors (MSBOC) (opens in a new tab)

  2. Schedule the Law and Business exam and the mechanical exam with PSI

    After the Board approves you it notifies PSI. Book both exams ($120 per portion). You have 6 months from eligibility to pass, with unlimited retests in that window.

    Schedule with PSI (Mississippi contractors) (opens in a new tab)PSI: Mississippi contractor exam bulletin and outlines (opens in a new tab)

  3. Pass both exams at 70%

    Both exams are open book and need 70% to pass.

    PSI: Mississippi contractor exam bulletin and outlines (opens in a new tab)

  4. Get licensed

    The Board reviews applications weekly and issues the license in about 5 working days after approval. Licenses renew annually.

    Mississippi State Board of Contractors (MSBOC) (opens in a new tab)

How to prepare

  • Bring the exact editions on PSI's list: the 2020 NEC for electrical, the 2021 IPC, IMC and IFGC for commercial plumbing and mechanical, and the 2018 Fuel Gas Code with the 2021 IRC on the residential lists. Code questions use only the listed edition.
  • Tab your books before exam day with permanent tabs only. You can highlight, underline and index them, but you can't write in them or add loose papers; sticky notes are removed.
  • Mississippi licenses contractor firms, not individual tradespeople. These are the exams the firm's qualifying individual takes; journeyman and master cards are local.
  • This exam mixes HVAC, gas, boilers, refrigeration and plumbing. Gas systems (10) and isometric analysis (8) are the largest single topics.
  • Check PSI's current list: Modern Refrigeration's 20th and 21st editions were dropped on 8/1/2026.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IMC and the 2021 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2021 International Mechanical Code (IMC)Essential

    Allowed in the exam room. The core of the mechanical, residential HVAC, refrigeration and boiler exams.

    ICC store (opens in a new tab)

  • 2021 International Plumbing Code (IPC)Essential

    Allowed in the exam room. The core of both plumbing exams and the plumbing share of the mechanical exam.

    ICC store (opens in a new tab)

  • 2021 International Fuel Gas Code (IFGC)

    Allowed in the mechanical and boiler exam rooms. Gas piping, venting, combustion air and appliances.

    ICC store (opens in a new tab)

  • Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)

    Allowed in the exam room. The 20th and 21st editions were dropped from PSI's list on 8/1/2026.

    Goodheart-Willcox (opens in a new tab)

Official reference list (as published by the testing agency)
  • 2021 International Mechanical Code (IMC), International Plumbing Code (IPC) and International Fuel Gas Code (IFGC)
  • NFPA 58 (2020) and NFPA 13 (2019)
  • Modern Refrigeration and Air Conditioning, 22nd Edition (20th and 21st dropped from the list 8/1/2026)
  • ACCA Manual N, Manual D (4th Edition), SMACNA (2005) and the Pipefitters Handbook (1967)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Boilers and Hydronics6
Gas Systems10
Cleanouts3
Plumbing Fixtures and Equipment5
Water Heaters2
Piping valves controls5
Sheet Metal and Ducts6
Water Supply5
Hangers and Supports4
Drain Waste and Vent5
Backflow2
Traps and Interceptors4
Developed length3
Isometric Analysis8
Safety4
Joints and Connections3
General Plumbing Regulations3
Fire Sprinklers4
Refrigerants and Refrigeration4
Heating and Cooling Principles4
Load Calculations5
Testing Adjusting and Balancing1
HVAC Equipment4

Exam day details

  • Administered by PSI Services for the Mississippi State Board of Contractors (MSBOC).
  • Fee: $120 per exam portion to PSI, nonrefundable. MSBOC application and license fees are separate.
  • 100 scored questions in 4 hours; 70 correct (70%) to pass. PSI adds about 10% unscored experimental items.
  • Open book: bring only the exact editions on PSI's list for this exam. You may highlight, underline and index them with permanent tabs, but not write in them; sticky notes are removed. A silent, non-programmable calculator is allowed.
  • After the MSBOC approves your application it notifies PSI, and you have 6 months from eligibility to pass; retests within that window are unlimited.
  • Every Mississippi contractor license needs the Law and Business Management exam plus the trade exam for the classification.
  • State-specific code rules override the national code, and code questions use only the listed edition.

Frequently asked questions

What's on the Mississippi Mechanical Exam?

100 scored questions: Gas Systems 10, isometric analysis 8, boilers and hydronics 6, sheet metal and ducts 6, plumbing fixtures and equipment 5, piping valves controls 5, water supply 5, drain waste and vent 5, load calculations 5, hangers and supports 4, traps and interceptors 4, safety 4, fire sprinklers 4, refrigerants and refrigeration 4, heating and cooling principles 4, hvac equipment 4, cleanouts 3, developed length 3, joints and connections 3, general plumbing regulations 3, water heaters 2, backflow 2, testing adjusting and balancing 1.

Which books can I bring to the Mississippi Mechanical Exam?

The 2021 IMC, IPC and IFGC, NFPA 58 (2020), NFPA 13 (2019), Modern Refrigeration and Air Conditioning, Manual N, Manual D, SMACNA and the Pipefitters Handbook. See the PSI bulletin for exact editions.

Does Mississippi license individual tradespeople at the state level?

No. The MSBOC licenses contractor firms, and each firm names a qualifying individual who takes these exams. Journeyman and master cards are issued locally by cities.

Free questions with answers

Show all 10 free questions and answers
  1. A buried gas line runs to a gas grill on a patio, in an area where no vehicle traffic or digging is expected, and the installation is approved. What is the minimum cover allowed for this individual outdoor appliance line?

    Answer: 8 inches below finished grade

    IFGC 404.12.1 allows individual lines to outdoor lights, grills and other outdoor appliances to be 8 inches below finished grade when approved and located where they are not susceptible to physical damage. The general 12-inch rule in 404.12 applies to other underground piping.

    Reference: 2021 International Fuel Gas Code, Section 404.12.1

  2. A low-water cutoff control on a steam boiler must respond in what way when the water level falls below the lowest safe level set by the manufacturer?

    Answer: Automatically stop combustion operation of the boiler

    IMC 1007.2 requires the low-water cutoff to automatically stop combustion when the water level drops below the lowest safe water level set by the manufacturer. Flow-sensing controls on forced-circulation coil or water-tube boilers do the same when circulation stops (the 1007.1 exception).

    Reference: 2021 International Mechanical Code, Sections 1007.1 and 1007.2

  3. Horizontal brass water pipe is being hung from a mechanical room ceiling. What is the maximum hanger interval listed in IPC Table 308.5?

    Answer: 10 feet

    IPC Table 308.5 lists brass pipe at 10 feet both horizontally and vertically. 12 feet is the horizontal value for steel pipe and copper pipe, 15 feet is the vertical value for steel, and 6 feet is for copper tubing 1 1/4 inch and smaller.

    Reference: 2021 International Plumbing Code, Table 308.5

  4. A restroom wall 140 inches long, with side walls at both ends, will receive a row of urinals with no partitions between them. How many urinals can be installed while meeting IPC 405.3.1?

    Answer: 4

    Each end urinal needs 15 inches from its center to the side wall, leaving 140 - 30 = 110 inches between the end centers. At 30 inches center to center, 110 / 30 = 3.67, so 3 spaces fit, giving 4 urinals. 5 comes from ignoring the end clearances (140 / 30 = 4.67 spaces), and 9 from dividing by 15 inches.

    Reference: 2021 International Plumbing Code, Section 405.3.1

  5. A mop sink is fed by a 32-foot hot water branch taken off a recirculating loop. In a remodel the sink moves farther away. By how many more feet can the branch be extended and still meet IPC 607.2?

    Answer: 18 feet

    IPC 607.2 limits hot water piping to 50 feet of developed length from the source, and recirculating piping counts as the source. The branch already uses 32 feet, so 50 - 32 = 18 feet remain. 50 feet ignores the existing branch, and 43 and 68 feet come from wrongly using 75- or 100-foot limits.

    Reference: 2021 International Plumbing Code, Section 607.2

  6. What is the minimum slope for a horizontal drain 3 inches to 6 inches in diameter, other than piping upstream of a grease interceptor?

    Answer: 1/8 inch per foot

    IPC Table 704.1 requires 1/8 inch per foot for 3 to 6 inch drains. Pipe 2 1/2 inches and smaller needs 1/4 inch per foot, and 8 inches and larger needs 1/16. Piping upstream of a grease interceptor must be at least 1/4 inch per foot.

    Reference: 2021 International Plumbing Code, Table 704.1

  7. Duct coverings and linings are tested to ASTM E84 or UL 723. What maximum flame spread index and smoke-developed index does the IMC set for them?

    Answer: Flame spread 25, smoke-developed 50

    IMC 604.3 limits duct coverings and linings to a flame spread index not more than 25 and a smoke-developed index not more than 50. The 450 smoke figure applies only to foam plastic insulation that meets the additional conditions in that section.

    Reference: 2021 International Mechanical Code, Section 604.3

  8. A pressure-reducing valve is installed in a hydronic makeup line. Where does the IMC require shutoff valves?

    Answer: On both sides of the pressure-reducing valve

    IMC 1205.1.4 requires shutoff valves on both sides of a pressure-reducing valve so it can be isolated for service.

    Reference: 2021 International Mechanical Code, Section 1205.1.4

  9. On a standard piping isometric drawing, how are vertical pipes drawn?

    Answer: As vertical lines on the sheet

    On an isometric drawing, vertical pipe runs are drawn vertically, while the two horizontal directions (north-south and east-west) are drawn at 30 degrees to the horizontal baseline. Lines at 45 degrees are not used for pipe directions in a standard isometric.

    Reference: General trade practice, Isometric drawing conventions

  10. A duct system delivers 1,200 CFM with a 20 degree F temperature difference between supply and room air. Using the sensible heat formula Q = 1.08 x CFM x TD, what sensible load is carried?

    Answer: 25,920 Btu/h

    Q = 1.08 x 1,200 x 20 = 25,920 Btu/h. 24,000 comes from using 1.0 instead of 1.08, and 12,960 comes from halving the airflow.

    Reference: General trade practice, Sensible heat equation Q = 1.08 x CFM x delta-T

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.